ML20023D891

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/83-10 on 830401-30.No Noncompliance Noted
ML20023D891
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/20/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20023D892 List:
References
NUDOCS 8306060125
Download: ML20023D891 (2)


See also: IR 05000267/1983010

Text

-

-

-

-

-

- - - - -

r

aus .

MAY 2 01983

In Reply Refer To:

Docket: 50-267/83-10

Public Service Company of Colorado

i

ATTN:

0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. M. W. Dickerson and G. L. Plumlee III, of this office during the

period April 1-30, 1983, of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain, and to the discussion of our findings

with D. W. Warembourg, and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection included Operational Safety Verification;

Surveillance; Maintenance; Bulletin Followup; Follow Up of Previous Inspection

Findings; and Review of Periodic and Special Reports. Within these areas,

the inspect 6en consisted of selective examination of procedures and repre-

sentative records, interviews with personnel, and observations by the

inspectors. These findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified

in paragraph 2 of the enclosed report.

Inaccordancewith10CFR2.790(a),acopyofthisletterandtheenclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

f

8306060125 830520

\\ ,,

,

DR ADOCK 0500026

p

Y

>

,n

._

DRRP.ME.k..

mnad,R, J,,f;,N

RPBAQ

RPBl

R

. . .... .

.

.

. ..

. . .

. .. . .... . .

!==>iDickerson/l s TWestFrman

GMadsen,,

, J,Gagliard,o

-> 4. ./.em.. ...QA.... ... ... 5..l,li . .....ih.h. ..,

.

,

,

,

,

,

,

,

,

,, ,

,,

,

,,

...... . . .

. . . . . . . . . . . . .

... . . . . . . . . . . .

NRC FORM 318110 806 NRCM O2tO

O FFICI AL_ R ECO R D CO P,Y__ _ ._

___

.

-

,

-

.

MAY Z 01983

2

Public Service of Colorado

Should yau have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

"Ortslnal Staned by:

G. L. MAoSEN"

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-267/83-10

cc w/ enclosure:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado

80651

J. Gahm, Quality Assurance Manager

(AddressSame)

bcc distrib. by RIV:

RPB2

Resident Inspector

TPB

Section Chief

MIS SYSTEM

Phil Wagner, PM

RIV File

RIV Reading File

Br. Reading File

RA

COLORAD0 STATE DEPT. HEALTH

"'c'>

..... ..... ......

..

. ...... ...

.. .

.

. . ..

.

.

. . .-. .

. . . .... ..-

" "'"'>

.. ..... . . . ..

....... ... ..

.

. .. ... .

..

.. .

.. . .

.

.

.. .

DATEf

.

. . . . . . .

. . . . . . . . . . . . . .

.. ......... .....

...... .. ..... ..

..... ............. .

..

. . .. . .

.... . . ....

l"*"""*'*"^*'""'"2'

OFFICIAL RECORD COPY