Forwards IE Insp Repts 50-498/83-08 & 50-499/83-08 on 830411-15.No Noncompliance Noted
ML20023D849
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/18/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20023D850 List:
References
NUDOCS 8306060056
Download: ML20023D849 (2)


See also: IR 05000498/1983008

Text

.

.-.

..

o

.

In Reply Refer To:

MAY 1 8 1983

Dockets: 50-498/83-08

50-499/83-08

Houston Lighting and Power Company

ATTN:

G. W. Oprea, Jr.

Executive Vice President

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the period April 11-15, 1983, of activities authorized by NRC Construc-

tion Permits CPPR-128 and 129 for South Texas Project, Units 1 and 2, and to

the discussion of our findings with Mr. H. A. Walker, and other members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included licensee action on previous

inspection findings, deficient threads and improper material for site

fabricated anchor bolts, and training records. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector. These

findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Two unresolved items are identified in paragraphs 3 and 4 of the enclosed

inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

WCross[ man

RPS-B

RPB1

DRRP&EP/RIV

RPS-B

JBoard an/dsm

GMadsen

JGagliardo

5/r5/83

5/@/83

5/g/83

5/g/83

C

<

()

f

8306060056 830518

gDRADOCK05000g

.

.

.

Houston Lighting and Power

-2-

gggy 181993

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

" Original Slaned by,

O'L MAOSEN'

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-498/83-08

50-499/83-08

bec to DMB (IE01)

bec distrib. by RIV:

RPB1

Resident Inspector

RPB2

Section Chief (RPS-B)

TPB

J. Boardman

J. Collins, RA

C. Wisner, PA0

D. Sells, NRR

MIS SYSTEM

RIV File

l

TEXAS DEPT. OF HEALTH RESOURCES

,

l

l

l

I

!

l

l

-

. . . . .

- _ . _ - _ . _ . . . _ _ . , _ . . . _ . . . . _ . _ _ _ _ _ _ , _ _ _ _ . _ . . _ _ _ . . . . _ - . _ _ _ _ _

.

-