n ACTIVE MODIFICATION PROJECTS, OPERATIllG PWR, 1982 N~
/g!}i>
PROJECTED TOTAL 1982 EXPENDITURES ($K)
SELF REGULATORY I(j) '
DESCRIPTION COST ($K)
(THRU OCTOBER)
INITIATED R
0 L
Anchor Bolt Inspections
& Modifications (IEB 79-14) 25,700 350 X
NUREG 0578 AFW Upgrade
& Containment Isolation Reset 4,400 (2) 750 X
Auxiliary Feedwater Line Mods &
Testing (Water Hamer) 2,500 (2) 596 X
l i
Structural Eval & Upgrade of Block Walls, IE Bulletin 3,100 (2) 1,503 X
Discharge Oil Monitor 27 7.8 X
I2I Upgrade Station Battery Capacity 1.500 317 X
Primary Coolant System High Point Vents, NUREG 0737 1 A0 (2) 392 X
Steam Generator Wide Range j
Level Indication 1,000 361 X
Modify LPSI Check Valves 220 (2) 145 X
Electrical Equipment Qualification 19,250 (2) 1,266.3 X
Firearms Training Range Evaluation 4
2.8 X
i l
Security Intrusion Alarm Evaluation 20 18.7 X
II}
R - Required by Rule; O - Required by Order; L - Required by NRC Letter or Bulletin (Includes NUREG-0737 some of which was later incorporated in Orders);
I - Initiated as a Result of informal contact (includes some work N
resulting from SEP)
~
D (2) Actual Expenditures in nate - These are uncompleted projects where actual expenditures have exceeded budget prb.iections 8305230270 821231 i
PDR ADOCK 05000155 P
PROJECTED TOTAL 1982 EXPENDITilRES ($K)
SELF REGULATORY DESCRIPTION COST ($K)
(THRUOCT0RER)
INITIATED R
0 L
i (1)
Post THI Shielding Evaluation I2I
& Hods, NUREG-0737 3,120 891 X
Control Room Ventilation System Upgrade, NUREG-0737 20,800 5,751 X
AFW System Upgrade, NUREG-0737 18,500 3,606 X
MS Reheater Piping System 788 (2) 130 X
1 Spent Fuel Storage Racks 5,150 28.3 X
Auxiliary Building Addition (required to accomodate NUREG-0737 Requirements including TSC) 10,000 5,005 X
Inadequate Core Cooling Instrumentation, NUREG 0737 8,500 74.5 X
Condensate Polishers 275 41.6 X
Electrical System Expansion (Required to Accommodate NUREG 0737) 1,350 163.7 X
Parking Lot Expansion 850 186.6 X
Warehouse 4,100 49.7 X
{
Plant Support Building 2,800 29.4 X
lietal Storage Building 9
9 X
Radwaste Compactor 65 (2) 65 X
I Waste Neutralizer Tank Modification 25 23.6 X
4 e
~-
2 4
PROJECTED TOTAL 1982 EXPENDITURES ($K)
SELF REGULATORY DESCRIPTION COST ($K)
(TilRU OCTOBER)
INITIATED R
0 L
I Turbine Rotor Replacement 9,200 19 X
Fire Protection Modifications 6,100 195 X
Long Term Cooling Upgrade 7,100 959 X
Radwaste Solidification System 14,800 3,994 X
Critical Function Monitor System (SPDS), NUREG-0737 6,800 1,64?
X Effluent Radiation Assessment System, NUREG-0737 8,700 3,760 X
Miscellaneous Charges Attributable to Major' I3)
Modification Work 2,000 1,532.5 PROJECTS NOT ACTIVE IN 1982 BUT FOR WHICH COSTS (CREDITS) WEP.E INCURRED Security Building Addition 55 (9.8)
X Tank 0xygen Control 4.0 0.17 X
4 l
FW Heater Tube Bundles 45 0.17 X
l Neutron Monitoring
- System 210 1.3 X
I2)
Relief Valve Position Indication 140 4.4 X
Whole Body Counting System 200 0.14 X
I MS Reheater Tube Replacement 795 (38.9)
X TOTAL CAPITAL EXPENDITURES 1982 (through October) Regulatory:
$28,569,500 Self Initiated: $ 5,253,480 (3) Based on the proportion of regulatory work being performed by the major modifications department, these e
miscellaneous charges should be distributed as: Regulatory 1,278.1 (83.4%)
l Solf initiated 2Ra A (16 AT)
4 i
s PROJECTED TOTAL 1982 EXPENDITURES ($K)
SELF REGULATORY DESCRIPTION COST ($K)
(THRU OCTOBER)
INITIATED R
0 L
I i
MODIFICATIONS PERFORMED / COORDINATED BY PLANT STAFF UNDER D&M BUDGET Human Factor Engineering i
I4)
NUREG-0737 NA 97.8 X
i Emergency Sirens & PA Additions, NUREG-0737 NA 123.1 X
SEP Hodificacions NA 8.4 X
X Office Buf1 ding Mods NA 25 X
t t
t TOTAL 1982 Regulatory:
$ 28,798,800 Self Initiated: $ 5,278,480 TOTAL PROJECTED COST of there Capital Projects Regulatory:
$150,252,000 I
Self Initiated: $ 41,486,000 i
- TOTAL SPENT TO DATE i
I Regulatory:
$ 89,989,200
[
Seit Initiated:
31,294,200 (4) Total. Projections Not Availaule 1