Advises That Util Response to 820714 Confirmatory Action Ltr Re IE Bulletin 79-14,piping Analysis to Restore Hot Shutdown Path Piping Sys to FSAR Requirements by 830215,acceptable
ML20023D369
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 05/18/1983
From: Spessard R
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
REF-SSINS-6820 IEB-79-14, NUDOCS 8305200421
Download: ML20023D369 (2)


Text

. - _ _.

c t'AY l8 633

/

i Docket No. 50-237 Docket No. 50-249 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN Mr. Cordell Reed Vice President Post Office Box 767 Chicago, Illinois 60690 Centlemen:

This refers to our followup on our Confirmatory Action Letter (CAL) to you, dated July 14, 1982 relative to the IE Bulletin 79-14 piping analysis to restore the Hot Shutdown Path piping systems to the FSAR requirements on or before Pobruary 15, 1983. You kept us apprised of the status of piping support installation as agreed upon through your submittal of the following corsespondences T. J. Rausch letter to J. G. Kappler, dated 1/13/83.

T. J. Raus6 h ter to J. G. Keppler, dated 2/1/83.

B. Rybak letter to J. G. Kappler, dated 4/6/83.

j B. Rybak letter to J. G. Keppler, dated 4/28/83.

l We evaluated your CAL actions through discussions with responsible design and site personnel, through observation of completed work, and through a l

review of design and installation documentation during inspections con-l ducted l

I On February 15-16, 1983 at Nutech Engineers, San Jose, California.

On March 1, 1983 and March 25 1983 at the Dresden site.

On April 12-14, 1983 at EDS Nuclear Walnut Creek, California.

We have concluded that an earnest effort was made to meet the scheduled l

completion date, that the piping support designs and the installations aw=in=d met requirements, and that your proposed completion date of (1) mid-May, 1983 for the only remaining support, in Dresden 2, and (2) Fall,

(

1983 for the four remaining supports in Dresden 3 are acceptable.

8305200421 830518 l

PDR ADOCK 05000237 l

G PDR

/do /

o "'" >............

DATE) unc ronu ais tio-so> uncu o24o OFFICIAL RECORD COPY

8 Consonwealth Edison Company fMY 181983 1

In our review of your design / construction interface records we noted that EDS Nuclear's evaluation of the as-built marked up drawings, to make the final determination that the systems have been restored to PSAR require-ments, was proceeding very slowly. We understand that EDS Nuclear committed to complete their evaluation for the as-builts of the hot shut-down path supports by August 31, 1983. Please notify this office promptly of any change to this date.

Your cooperation with us is appreciated.

i Sincerely, W

~

.R. L. Spessard, Director Division of Engineering ces Dennis L. Parrar. Director of Nuclear Licensing D. J. Scott, Station Superintendent N. Kalivianakia. Plant Superintendent DMB/ Document Control Desk. (RIDS)

Resident Inspector, R III Dresden/ Quad Cities Phillip L. Willman, Esq.

i Assistant Attorney General.

Reed Neuman, Esq.

Assistant Attorney General l

l l

t it]

o"' cry..R.III g,

R II,

R III I

I suas4=c y Dan e Walker Little Spe sard

[lY g

3.......

... f,h..

. l*

oark 5[18/83 OFFICIAL R5COND COPY NRC FORM 318 (10 80) NRCM ONO

-