ML20023D313

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1983
ML20023D313
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/02/1983
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20023D308 List:
References
NUDOCS 8305200362
Download: ML20023D313 (4)


Text

. _.

I OPERATING DATA REPORT DOCKET NO.

50-364 DATE 5/02/83 COMPLETED BY W G.Hairston,III TELEPHONE (9nni 909-5156 OPERATING STATUS

1. Unit Name:

T-Ph M N "1 ay N 4 +

2. Reporting Period: Anril. 1983 (1) Cumulative data since
3. Licensed Thermal Power (MWt): 2652 7/30/81, date of 860 commercial operation.
4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 854.7 813.7
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sinee Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions,if Any:

N/A This Month Yr..to.Date Cumulative 719 2879 15,360

11. Hours In Reporting Period 719 2879 13,663.5
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 138.4

14. Hoe.rs Generator On-Line 719 9970 11 491.4
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.899,797 7,615,565 33,037,379
17. Gross Electrical Energy Generated (MWH) 606,888 2,438,262 1 1.111. a g (;

577,672 2,321,670 10.537.728

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 100.0 87.8 100.0 100.0 87.8 l
20. Unit Availability I' actor 98.7 99.1 84.3
21. Unit Capacity Factor (Using MDC Neti 96.9 97.3 82.8
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 61
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

j Refueling outage: Sentenber.1983 H/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 5/06/01 5/03/81 INITIAL CRITICALITY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION 8/01/81 7/30/81 8305200362 030512 PDRADOCK05000g twi7)

R

[

DOCTlT NO.

50-364

-o UNIT 2

5/02/83 DATE COMPLETED BY W.G. Hairston, III TELEPHONE (20s) 899-5156, 310NT!!

April DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net)

(5tWe Net)

I 17 7R4 803 33 807 803 3

19 811 809 810 4

g 5

798 21 811 798 806 6

7 7

800 23 794 I

g 798 24 800 797 808 9

3-10 801 26 810 11 nn7 27 R19 812 g2 807 3

13 29 801 804 788 g4 30 IS 808 33 806 16 RLSTRUCDON5 On this form:r. list the avers;: dsily umt power levelin MWe Net for c:ch d:y in the reportmg inunth. Campute to

, the ne:re:t whole me;: watt.

(9(77)

F-'

7'-

e-v w

p,,,,9

._.._4

UNITSilulDOWNS AND POWER REDUC 110NS DOCKET NO.

50-364 UNIT NAhlE J.M.Farley-L' nit 2 DATE 5/02/83 COMPI_ETED BY OG.Hairston.III I

REPORT MONTil Anvil TEl.LPilONE (205) 899-5156 v.

E E

5 E

}

$ EE l h.cusee

,E s,

{4 Cause & Cosseceive No.

Date g

3g

,3 g 5 Event p

n1 Action to

!O Pscvens Recussence

$E 5

.5 gjj !

Report #

u c

mU e

6 I

T 11 CRE WEF E

NO U NIT S 11 1 TD0WNS 0R S IGNIF ICANT POWER REDUCTION S

l IN T II E 11 0 N r 11 0 F APRI L

I 2

3 4

F: Forted Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Fquipinent Failure (Explain) 1 -Manual for Preiusation of Data a

ti Maintenance of Test 2 Manual Scram.

Entsy Sheets l'or t.icensee C Refochng 3 Automanic Scram.

Event Repost (1.ER) File INUREG-D-Regulatiny Restsittion 4-Other (Explain) 01611 E-Operator Training A license Examination F Administialive 5

G Opesaifonal Essor (l'.xplain) lishibit 1 - Same Souwe l

01/17) ll Othes (Explain)

s JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1983 The Unit experienced no shutdowns or significant power reductions during the month of April.

The following safety-related maintenance was performed in the month of April:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repaired body to bonnet leak on TDAFW pump steam bypass valve Q12N12HV3234A.

3.

Adjusted packing on #1 and #3 River Water Pumps.

4.

Repaired reach rod and position indicator on (Waste Evaporator to Plant Vent) valve Q2G21V012.

l l

l