ML20023D307

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1983
ML20023D307
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/12/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20023D308 List:
References
NUDOCS 8305200357
Download: ML20023D307 (2)


Text

'

  • Memng Address AlIbima Power C:mpany 600 North 18th Street Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

2"%;'*0llg'"'

AlabamaPower the southem electrc system May 12, 1983 Docket No. 50-364 Di rector, O f fice o f Management In formation and Program Control V.

S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the April, 1983 Monthly Operating Report for Joseph M.

Fa rley Nuclea r Plant, Unit 2, required by Section 6.9.1.10 o f the Unit 2 Technical Speci fi-cations.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21,
1977, a

" Narrative l

S umma ry of Operating Experience" is included in the attached report.

If you have any questions, please advise.

l Yours very truly, F. L.

Cl ayton, J r.

l l

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

/[

Director, RII (1 copy) 8305200357 830512 PDR ADOCK 05000364 R

PDR

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1983 The Unit experienced no shutdowns or significant power reductions during the month of April.

The following safety-related maintenance was performed in the month of April:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repaired body to bonnet leak on TDAFW pump steam bypass valve Q12N12HV3234A.

3.

Adjusted packing on #1 and #3 River Water Pumps.

4.

Repaired reach rod and position indicator on (Waste Evaporator to Plant Vent) valve Q2G21V012.

l 4

i