li JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS
)
APRIL, 1983 I
During the month of April there was one unit shutdown on April 13, 1983, for performance of the turbine overspeed trip test followed by a scheduled maintenance outage. Whsn the main steam isolation valves were closed, fol-1 IcVing the unit shutdown on April 13,1983, the 1A and IB steam generator atmospheric relief valves failed to open. As a result, the IB steam gen-erator #1 safety valve lifted, and following a decrease in pressure, the safety valve returned to the closed position.
The following safety-related maintenance was performed in the month of l
April:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired flange leak on code safety valves Q1N11V012D and Q1N11V010D.
l 3.
Repacked #4 and #8 River Water Pumps.
4.
Repaired RCDT discharge valve Q1E21V375.
5.
Repaired IB hydrogen inlet isolation valve Q1G22V057B.
l l
i 8305200327 830512
{DRADOCK 05000340 i
~..
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 5/02/83 COMPLETED BY W.G. Hairston, III TELEPHONE (70s) R99-5156 OPERATING STATUS Notes
- 1. Unit Name:
J scoh M. Farley - Unit 1
- 2. Reporting Period: - April, 1983
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 12/01/77, date'of 860 commercial operation..
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
844.6
(
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:
N/A l
l N/A
- 9. Power Level To which Restricted,If Any (Net MWe):
I
- 10. Reasons For Restrictions.If Any:
N/A l
1 This Month Yr.-to.Date Cumulatise
- 11. Hours In Reporting Period
""2879 47.447
- 12. Number Of Hours Reactor Was Critical 693.9 1116.2 29.263.7 25.1 25.1 3,639.6
- 13. Reactor Reserve Shutdown Hours 28,311.8
- 14. Hours Generator On.Line Ann 7 inA2 A
- 15. Unit Reserve Shutdown Hours o
o n
- 16. Gross Thermal Energy Generated (MWH) 1.489.953 2.317.745.
70.80 7.794 i
- 17. Gross Electrical Energy Generated (MWH) 472.400 734.454 22.508.002
- 18. Net Electrical Energy Generated (MWH) 443,462 669,960 21,110,180 94.7 36.2 59.7 l
- 19. Un's Senice Factor
- 20. Unit Availability Factor 44 7 16 7 so 7
- 21. Unit Capacity Factor (Using MDC Net) 76.8 29.0 55.4 74.4 28.1 53.7
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 17.7 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
N/A l
N/A
- 25. I Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 8/06/77 8/09/77 INITIAL ELECTRICITY 8/20/77 8/18/77 12/01/77 12/01/77 COMMERCIAL OPER ATION (4/77)
L
DOCKIT NO.
50-348 1
WIT DATE 5/02/83 COMPLETED BY W.G.Hairston. III TELEPHONE (205) 899-5156 A ril P
510tml DAY AVERAGE DAILY l'0WER LEVEL DAY AVERACE D AILY POWER LEVEL plwe Net)
(31We Net) 432 I,
g7 199 2
610 13 100 3
621 gg 201 4
700 20 592 790 810 5
21 6
803 n
811 805 80 8 7
3 g
804
- 4 809 9
Rns 25 81 t, 811 816 10 26 i
11 807 7
815 809 12 3
13 11 3
808 14 G
30 194 31 15 16 200 CGTRUCUCNS On this form:t. list the. :vens: dsily unit power !cvelin MWe Net for c:ch d.:y in the reporting inonth. Campute tu j
, the nest::t whuie rnes: watt.
(9p7)
_ _ = _ _ _ _.. _,. _ -... - - - _ _. -
N J
~
UNITSillflDOWNS AND POWER RED 110110NS DOCK ET NO.
S'0-348 UNIT NAhlE J.M.Farlev-Unit 1 DALE 5/02/83 COMPl.ElED sy
_u.c unfreinn_ yyy HEPORT hf 0N111 Anri1 TEl.Li'llONE (205) 899-5156 t w5 c
r.
c No.
1)aie E.
-S _$
j g$3 5't g%
Cause l Conseceive C"5CC y
Sy 0
55%
I'C"'
f,3 gu3 Action to 3 Di j Reinni u g
p,, yen, g,,,,,,,c, mo o-M d
013 830413 S
38.3 B
1 N/A N/A N/A Turbine overspeed trip test; i
maintenance outage.
{
l l
i 1
l l
1 i
't I
2 3
4 l': 1 osted 1(cason; hiethod:
lixinhit G. Instsuctions S. Stheduled A l'quipincn Failure (Explain) 1 -hlanual fos Psepasation of Data i
11 hiaintenance of Test 2 Alanual Serain.
linsey Sheets for I i<cusee C l(efueling 3 Autunutic Scsani.
Esent llepos e il !!R) file INUltlE D Hegul.isoay 1(essension 1 Olher (limplain) 01611 1 -Opesator Isaining & Iicense Exaniination F Adniinisiunive 5
Is (I C JiltHid! l.18o8 ll[xplalll)
P j
(9//7) 11 Othes (!!xplain) l: xlllhl41
- SJ8He Sontie t
1 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS APRIL, 1983 During the month of April there was one unit shutdown on April 13, 1983, for performance of the turbine overspeed trip test followed by a scheduled maintenance outage. When the main steam isolation valves were closed, fol-lowing the unit shutdown on April 13, 1983, the 1A and IB steam generator atmospheric relief valves failed to open. As a result, the IB steam gen-erator #1 safety valve lifted, and following a decrease in pressure, the safety valve returned to the closed position.
The following safety-related maintenance was performed in the month of April:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired flange leak on code safety valves Q1N11V012D and Q1N11V010D.
3.
Repacked #4 and #8 River Water Pumps.
4.
Repaired RCDT discharge valve Q1E21V375.
5.
Repaired IB hydrogen inlet isolation valve Q1G22V057B.
l
~