li JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS

)

APRIL, 1983 I

During the month of April there was one unit shutdown on April 13, 1983, for performance of the turbine overspeed trip test followed by a scheduled maintenance outage. Whsn the main steam isolation valves were closed, fol-1 IcVing the unit shutdown on April 13,1983, the 1A and IB steam generator atmospheric relief valves failed to open. As a result, the IB steam gen-erator #1 safety valve lifted, and following a decrease in pressure, the safety valve returned to the closed position.

The following safety-related maintenance was performed in the month of l

April:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repaired flange leak on code safety valves Q1N11V012D and Q1N11V010D.

l 3.

Repacked #4 and #8 River Water Pumps.

4.

Repaired RCDT discharge valve Q1E21V375.

5.

Repaired IB hydrogen inlet isolation valve Q1G22V057B.

l l

i 8305200327 830512

{DRADOCK 05000340 i

PDR

~..

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 5/02/83 COMPLETED BY W.G. Hairston, III TELEPHONE (70s) R99-5156 OPERATING STATUS Notes

1. Unit Name:

J scoh M. Farley - Unit 1

2. Reporting Period: - April, 1983
1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 12/01/77, date'of 860 commercial operation..

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):

844.6

(

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:

N/A l

l N/A

9. Power Level To which Restricted,If Any (Net MWe):

I

10. Reasons For Restrictions.If Any:

N/A l

1 This Month Yr.-to.Date Cumulatise

11. Hours In Reporting Period

""2879 47.447

12. Number Of Hours Reactor Was Critical 693.9 1116.2 29.263.7 25.1 25.1 3,639.6
13. Reactor Reserve Shutdown Hours 28,311.8
14. Hours Generator On.Line Ann 7 inA2 A
15. Unit Reserve Shutdown Hours o

o n

16. Gross Thermal Energy Generated (MWH) 1.489.953 2.317.745.

70.80 7.794 i

17. Gross Electrical Energy Generated (MWH) 472.400 734.454 22.508.002
18. Net Electrical Energy Generated (MWH) 443,462 669,960 21,110,180 94.7 36.2 59.7 l
19. Un's Senice Factor
20. Unit Availability Factor 44 7 16 7 so 7
21. Unit Capacity Factor (Using MDC Net) 76.8 29.0 55.4 74.4 28.1 53.7
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 17.7 l
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:

N/A l

N/A

25. I Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 8/06/77 8/09/77 INITIAL ELECTRICITY 8/20/77 8/18/77 12/01/77 12/01/77 COMMERCIAL OPER ATION (4/77)

L

DOCKIT NO.

50-348 1

WIT DATE 5/02/83 COMPLETED BY W.G.Hairston. III TELEPHONE (205) 899-5156 A ril P

510tml DAY AVERAGE DAILY l'0WER LEVEL DAY AVERACE D AILY POWER LEVEL plwe Net)

(31We Net) 432 I,

g7 199 2

610 13 100 3

621 gg 201 4

700 20 592 790 810 5

21 6

803 n

811 805 80 8 7

3 g

804

4 809 9

Rns 25 81 t, 811 816 10 26 i

11 807 7

815 809 12 3

13 11 3

808 14 G

30 194 31 15 16 200 CGTRUCUCNS On this form:t. list the. :vens: dsily unit power !cvelin MWe Net for c:ch d.:y in the reporting inonth. Campute tu j

, the nest::t whuie rnes: watt.

(9p7)

_ _ = _ _ _ _.. _,. _ -... - - - _ _. -

N J

~

UNITSillflDOWNS AND POWER RED 110110NS DOCK ET NO.

S'0-348 UNIT NAhlE J.M.Farlev-Unit 1 DALE 5/02/83 COMPl.ElED sy

_u.c unfreinn_ yyy HEPORT hf 0N111 Anri1 TEl.Li'llONE (205) 899-5156 t w5 c

r.

c No.

1)aie E.

-S _$

j g$3 5't g%

Cause l Conseceive C"5CC y

Sy 0

55%

I'C"'

f,3 gu3 Action to 3 Di j Reinni u g

p,, yen, g,,,,,,,c, mo o-M d

013 830413 S

38.3 B

1 N/A N/A N/A Turbine overspeed trip test; i

maintenance outage.

{

l l

i 1

l l

1 i

't I

2 3

4 l': 1 osted 1(cason; hiethod:

lixinhit G. Instsuctions S. Stheduled A l'quipincn Failure (Explain) 1 -hlanual fos Psepasation of Data i

11 hiaintenance of Test 2 Alanual Serain.

linsey Sheets for I i<cusee C l(efueling 3 Autunutic Scsani.

Esent llepos e il !!R) file INUltlE D Hegul.isoay 1(essension 1 Olher (limplain) 01611 1 -Opesator Isaining & Iicense Exaniination F Adniinisiunive 5

Is (I C JiltHid! l.18o8 ll[xplalll)

P j

(9//7) 11 Othes (!!xplain) l: xlllhl41

  • SJ8He Sontie t

1 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1983 During the month of April there was one unit shutdown on April 13, 1983, for performance of the turbine overspeed trip test followed by a scheduled maintenance outage. When the main steam isolation valves were closed, fol-lowing the unit shutdown on April 13, 1983, the 1A and IB steam generator atmospheric relief valves failed to open. As a result, the IB steam gen-erator #1 safety valve lifted, and following a decrease in pressure, the safety valve returned to the closed position.

The following safety-related maintenance was performed in the month of April:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repaired flange leak on code safety valves Q1N11V012D and Q1N11V010D.

3.

Repacked #4 and #8 River Water Pumps.

4.

Repaired RCDT discharge valve Q1E21V375.

5.

Repaired IB hydrogen inlet isolation valve Q1G22V057B.