ML20023C818
| ML20023C818 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 05/05/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20023C819 | List: |
| References | |
| NUDOCS 8305180058 | |
| Download: ML20023C818 (4) | |
Text
.
t DUKE POWER _ COMPANY DOCKET NO. 50-369 MCGUIRE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Mendment No. 21 License No. NPF-9 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station Unit 1 (the facility) Facility Operating License No. NPF-9 filed by the Duke Power Company (licensee) dated February 3 and April 28, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, as amended, the provisions of the Act, and the regulations of the Com-mission:
C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; l
D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the l
public; 1
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 l
'of the Commission's regulations and all applicable requirements have been satisfied.
t Accordi.,9 y, Facility Operating License NPF-9 is amended as follows:
2.
1 i
A.
Add paragraph 2.C.(12) to read:
(12) Steam Generator Design Modification The licensee shall conduct the inspection, testing and l
monitoring program as described in the attachment to l
8305180058 G30505
~
l PDR ADOCK 05000369 P
PDR l
........**-*-..aa ma****-****a-*
I OFFICE )
sunnmak
............ ~.......,
.... -... ~........
...... ~.. ~...... -
OFFICIAL RECORD COPY useo:imi-4mme unc ronu m ooapacu oua
4 p
Hal B. Tucker's letters of February 3 and April 23 (revised),1983.
The licensee shall not make any raajor modifications to this program unless prior flRC approval is received.
Major modifications are defined as:
a.
Elimination of any identified testing, inspection or r.nonitoring,
~
i b.
Changes in the frequency of performing the iden-l tified testing, inspection or monitoring, and c
c.
Reduction in the scope of any of the identified testing, inspection or monitoring.
.f C
3.
This license amendment is effective as of its date of issuance.
s FOR THE HUCLEAR REGULATORY COMMISSIO!!
)/
Darrell G. Eisenhut, Director Division of Licensing Date of Issuance:
May 5, 1983 l
\\
s v' l
.F
- NOTE: SEE PREVIOUS WHITE FOR CONCURRENCE p
f
)
..gt [4...
omer>.LA:.DL:.LB. 44....DL.LB.. #4....
. 0 ELD.......
- PE)uncanf
- RBirke
'47f7/83,hmc. 4713755.l.,,,.. Cu,tchi.n...
...EMeas.am..
...5 /..J..../. 83.... l5../..f..../.
i.senhut.....
suRaue)
...../.<)'../83 4/18/83 5
om)
I NRC FORM 318 00-80)NRCM ONQf -
OFFICIAL RECORD COPY usam asi-us-om j w_
t
^
t.
..y.92
.K g
,s i
DUKE POWER COMPANY DOCKET N0. 50-369 MCGUIRE NUCLEAR STATION, UNIT 1-AMENDMENT TO FACILITY OPERATING LICENSE
)
/
Amendment' No.
License No. NPF-9
/
1.
The Nuclear Regulatory Conadssion (the Commission) hasefound that:
/
A.
The application for amendment to.the McGuire clear Station Unit 1 (the facility) Facility Operating License N NPF-9 filed by the Duke Power Company (licensee) dated Febru y 3,1983, complies with the standards and requirements of the A' ic Energy Act of 1954, as amended (the Act) and the Commission' gulations as set forth in 3
10 CFR Chapter I; B.
The facility will operate in con rmit;y with. the application, as
> amended, the provisions of the t, and the regulations of the Com-mission; i
C.
There is' reasonable assur e: (1) that the activities authorized by this amendment can be onducted without endangering the health.
and safety of the publ
, and (ii) that such activities will be conducted in complia e with the Commission's regulations _ set forth in 10 CFR Chapter I-r' D.
The issuance'of is. license amendment will not be inimical to the common defense security or to the health and safety of the public; E.
The issuanc of this amendment is in accordance with 10 CFR Part 51 l
of the Co ssion's regulations and all applicable requirements have been satisfied.
4 2.
Accordingly, Facility Operating License NPF-9 is amended as follows:
1 A.- Add p,aragraph 2.C.(12) to read:
(12) Steam Generator Design Modification The licensee shall conduct the inspection, testing and j
monitoring program as described in the attachment to h
cmce) '......................
sunname) oan >
..........m..........
- nne ronu :ns oo-somncu o24o -
OFFICIAL RECORD COPY esom m wasmo
e g
.% p'
~
_2_
Hal B. Tucker's letter of February 3,1983. The Itcensee shall not make any major modifications to this program unless prior NRC approval is received.
Major modifications are defined as:
a.
Elimination of any identified testing, inspection or monitoring, j
b.
Changes in the frequency of performing the iden-tified testing, inspection or monitoring, and c.
Reduction in the scope of any of t identified f
testing, inspection or monitor g.
3.
This license amendment is effective as of ts date of issuance.
F THE NUCLEAR REGULATORY COMMISSION Darrell G. Eisenhut, Director Division of Licensing Date of Issuance:
l l
l-i
.N f
(v 7
.....QEkD[.......
omce, kh.;E/ B...fi...Rk.tk#..f4
......D,(;,(B,,,fi,,,ADi(I (,,,,,D,11;DL,,,,,,,,,,,
D
.....b3.t.........
suaname > & a aa!bac....RBirke.1......
...... fade.nsam......INoxak.......DEisenhut.....
4.8.2/.8,3.,,,,,,,,,,,,4,/,Q/Q,3,,,,,,,,,,,,,41,,$/g 3,,,,,,,,,,,41... 18.3....... 4/...../.83......4/...../83........
oan p
! Nac ronu sie 0040) NACM ONO OFFICIAL RECORD COPY use.eja -mea
_