Monthly Operating Repts for Apr 1983
ML20023C680
Person / Time
Site: McGuire, Mcguire  
Issue date: 05/13/1983
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20023C674 List:
References
NUDOCS 8305170540
Download: ML20023C680 (7)


Text

..

OPERATING DATA REFORT DOCKET NO. 50-369 DATt 5-13-83 COSIPLETED BY J. A. Renvis TELEPil0NE 704-373-7567 OPEllATING STATUS Notes

  • NOTE: Nameplate Rating McGuire Unit 1
1. Unit Nane:

(Gross MWe) calculated as April 1, 1983 - April 30, 1983

2. Reporting Period:

1450.000 MVA x.90 power 3411

3. Licensed Thennal Power iMWO:

factor per Pay 111, 1305*

4. Nameplate Ratin;(Grow MWel-NUREG-0020.

1180

5. Design Electrical Rating (Net MWei:
6. Maximum DependaNe Capeity (Grow MWe):

1180

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratinp titems Number 3 Throu;h 7) Since Lad Report.Gne Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

i This Month Yr..to.Date Cumulative

11. liours in Reporting Period 71 9.0 2 879.0 12 383.0 0.0 494.9 7 633.0
12. Number Of liuan Reactor Was Critical
13. Reactor Resene Shutdown flours

~

~

~

14. Ilours Generator On.Line 0.0 494.9 7 RR7.1
15. Uriit Resene Shutdown flours 0

857 172 14 359 590

16. Gross Thermal Ener;y Generated (MW}i) 17 293 867 4 920 458
17. Gross Electrical Energy Generated (MWil)

-66 90-~~, _,

257 412 4 578 735

18. Net Electrical Ener;;y Generated (MWii) 0.0 17.2 61.3
19. Unit Senice Factor 0.0 17.2 61.3
20. Unit Availability Factor 0.0 7.6 31.3
21. Unit Capacity Fa: tar (Using MDC Neti 0.0 7.6 31.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.8 21.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:

None

25. If Shut Unwn At End Of Report Period. Estimated Date of startup:

2h. Units in Test Status (Prior to Commercial OperationJ:

Forecast Achiesed INITI \\ L CRITICA LiTY INI TI A l. EL EC l RICI T Y CO\\lMI.RCI A L Ol'!~.R A flON 1

R

50-369 DOCKETNO.

(JNIT McGuire 1 5-13-83 DATE AVERAGE DAILY UNIT POWER LEVEL MONT11 Aoril. lona AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (hiWe-net)

DAY (htWe.ne t) 1 17 2

18 3

19 4

20

'5 21 6

22 7

23 8

24 9

25

~

10 26

~

11 27 12 28 13 29 l

14 30 15 31 16 DAILY UNIT POWER LEVEL FOR\\1 INSTRtR'TIONS On this form, hst ths averare daily unit power le el in h!'Ne net for each day in the reporting n.onth.

Compute to the nearest wnole megawatt.

These figures will i e used to plot a graph for cach reporting montti. Note that by usinsi maximum dependable capacity for the net electrical ratin : of the umt there may be..s easions when the daily average power leve euceds the It>O.i hoe (or the restricted power lesel knel.,In such c.ises, the average daily unit power output sheet should be footnoted to aplain the app.uent anomaly.

e i

l 50-369 UNITSilUTDOWNS ANI) POWER REDUCTIONS DOCKET No. McGuire 1 l

UNIT NAME DATE 5-13-83

-1.

A. Reavis COMPLETED hY REPORT MONTil April. 1983 TELEPJIONE 704-373-7567

't

.] y 3-Y Licensee

,E-r, Cause & Coereceive j

No.

Date g

3g i

j g $-

Event g,7 91 Action to y5

[o ;y, =

Repmt u in U gU preven Recurrence H

^

E 3

O g 01 S

104.00 H

RA PIPEXX Completion of thennal sleeve work.

{

18 83 1C 83-04-05 S

168.00 H

CH HTEXCH Eddy current test steam, generators lD 83-04-12 S

72.00 B

CF SUP0RT Residual heat rem'cval hanger repairs.

j lE 83-04-15 S

96.00 B

SA ZZZZZZ Integrated;1eak rate test-1 1F 83-04-19 S

72.00 H

CB PUMPXX IB NCP #1 seal replacement I

1G 83-04-22 S

71.00 H

ZZ ZZZZZZ Fill and vent primary 1

i lH 83-04-25 S

60.00 H

CH VALVEX Steam generator blowdown valve repairs 1

j 1I 83-04-27 S

76.00 H

ZZ ZZZZZZ Normal heatup i

i I,

I j

2 3

4 i

F: Forced Reamn:

Mettu>ti:

Exhibit G. Instenesions A li uipment Failure (Explain) 1-Manual for Preparation of Data S: Scheiluted l

fl Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee 1 Autori.atic Sciam.

Event Report (LER) File INtIREG.

j C Refueling D Regulatory Restriction

-1 Other (lixplain)

O!bl) 3 i

I: Ope.ator Training 1 License Examination I Administrative 5

i.

G Opciational listor (lixplain)

Exhibit i.Same Sonsee 1

19/77)

Il Other (l!xplain) l I

1

DOCKET No: 50-369 UNIT: McGuire 1 DATE: 5-13-83 NARRATIVE SIDDIARY Month: April, 1983 McGuire Unit I remained shutdown the month of April. The critical path job varied through the period.

Fuel loading following the inspection of the vessel internals for a missing thermal sleeve, eddy current testing, residual heat removal system hanger repairs, integrated leak rate testing, reactor coolant pump seal replacement, primary fill and vent, steam generator blowdown valve repairs, and normal heatup all were critical path work for portions of the month.

e e

I

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

McGuire Unit 1 2.

Scheduled next refueling shutdown:

December, 1983 3.

Scheduled restart following refueling:

February, 1984 4.

Will refueling or resumption of operation.hereaf ter require a tectinical specification change or other license amendment?

N/A If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

N/A t

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

27 8.

Present licensed fuel pool capacity:

500 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

DUKE POWER COMPANY Date:

May 13, 1983 Name of

Contact:

J. A. Reavis Phone:

~

~

~

OPERATING DATA REPORT DOCKET NO. 50-370 DATE 5-lJ-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373-.7567 OPERATING STATUS McGuire Unit 2

  • Notes : Nameplate Rating
1. Unit Name:
2. Reporting Period:

April 1.-1983 - April 30, 1983 (Gross Mwe) calculated as 1450.000 MVA x.90 power

3. Licensed Thermal Power (> lwr): 1 factor per page iii, 05*
4. Nameplate Rating (Gross MWe):

NUREG-0020.

5. Design Electrical Rating (Net MWe): 1180
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1180 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted !f Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr. to Date Cumulative

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor iUsing MDC Net)
22. Unit Capacity Factor (Using DER Net) l
23. Unit Forced Outage Rate 24.' Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY 6/83 COMMERCIAL OPER ATiON 1/R4 (0/77) i

. ~- -- -

McGuire Nuclear Station Operating Status Report 1.

Personnel Exposure For the month of March, 39 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 2.030 rem, which represents approximately 16.9%.of that person's allowable annual limit.

f 2.

The total station liquid release contribution to whole body dose for March has been compared with the Technical Specifications annual value of 3 mrem; the total release for March was less than 10 percent.

The total station gaseous release contribution to any organ dose for j

March has been compared with the Technical Specifications annual value of 15 mrem; the total release for March was less than 10 percent of this I

' limit.