May 13, 1983 c'
/2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
' hy 2
4 g
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD A
Noci
"\\
'ttf(., h s
JJ4 In the Matter of
)
y CAROLINA POWER & LIGHT COMPANY AND DI
NORTH CAROLINA EASTERN MUNICIPAL
)
Docket No. 50-400 OL POWER AGENCY
)
50-401 OL
)
(Shearon Harris Nuclear Power Plant,
)
Units 1 & 2)
)
APPLICANTS' RESPONSE TO WELLS EDDLEMAF'S REQUEST FOR PRODUCTION OF DOCUMENTS (CONTENTIONS 41 AND 65)
Pursuant to 10 C.F.R.
S 2.741(d), Applicants hereby respond to Wells Eddleman's Request for Production of Docu-ments as contained in Wells Eddleman's General Interrogatories and Interrogatories on Contentions 22A, 22B, 75, 80, 83/84, and 132 to Applicants Carolina Power & Light et al. (First Set) by stating that the documents identified on the attached Document List will be made available to Mr. Eddleman for inspection and copying in the following manner:
The requested documents will be made available at the Visitors' Center of the Shearon Harris Nuclear Power Plant during Plant business hours (or such other mutually agreeable time).
Because of the volume of documents involved in this request, the time required to assemble them, and because some documents are a part of currently active files routinely used at the Plant, the documents will not be assembled for inspection until an appointment is made for the inspection.
8305170450 830513 PDR ADOCK 05000400 G
,;- Consequently, an appointment must be made at least one week before the requested inspection, by telephoning Hill Carrow at 836-6839.
This response will expire on June 30, 1983.
Inspected documents which Mr. Eddleman wistes to have copied will be reproduced by Carolina Power & Light Company on a schedule compatible with other demands for duplicating equipment.
A Carolina Power & Light Company employee will be available during the inspection in order to receive any requests for copying.
Copies of such selected documents will then be furnished to Mr. Eddl3 man upon payment of 7 cents per page, to meet Carolina Power & Light Company's cost of reproduction.
/Im A.
Thomas A.
Baxter,LP.C.
SHAW, PITTMAN, POTTS & TROWBRIDGE 1800 M Street, N.W.
Washington, D.C.
20036 (202) 822-1090 Richard E. Jones Samantha Francis Flynn CAROLINA POWER & LIG,HT COMPANY P.O. Box 1551 Raleigh, North Carolina 27602 (919) 836-6517 Counsel for Applicants Dated:
May 13, 1983
r O
P DOCUMENT LIST INTERROGATORY DESCRIPTION 41-1(b)
CP&L Corporate Quality Assurance Procedure QCA-1, Rev. 11 (3/16/81) " Personnel Training and Qualification" 41-1(k)
Weld Data Reports on inspections of Seismic Category I pipe hangers since June, 1981, with some historical inspection information, in the form of 36 notebooks (over 12,000 pages).
41-3(e)
Field Change Requests, Permanent Waivers, and Design Change Notices for HVAC and conduit hangers listed in Exhibit 8 of the June 1981 Final Report.
Rework packages for HVAC, cable and conduit hangers.
41-7 Documentation on retraining of weld inspecto?s.
41-11 NRC inspection reports 50-400/83-05 and 50-400/82-03.
CP&L letter dated 3/24/82 (CQAD 82-519).
CP&L letter dated 9/13/82 (CQAD 82-1560).
i CP&L letter dated 3/31/83 (NRC-52).
65-4 (a)
Ebasco masonry and reinforcing steel drawings for containment base mat.
l l
.