ML20023C565

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/83-12 on 830301-31.No Noncompliance Noted
ML20023C565
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/26/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20023C566 List:
References
NUDOCS 8305170436
Download: ML20023C565 (2)


See also: IR 05000397/1983012

Text

[g{.gMAo,k

UNITED STATES

NUCLEAR REGULATORY COMMISSION

[

REGION V

g

-l

1450 MARIA LANE,sulTE 210

0,

%.. . . . . . 'g

WA LNUT CRE E K, CALIFORNI A 94596

,o

APR 2 61983

.

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

.-

Richland, Washington 99352

Attention:

Mr. C. S. Carlisle

Director of Operations

.

Gentlemen:

Subject: NRC Inspection of WNP-2 (Preoperational Test Phase)

This refers to the inspection conducted by Messrs R. A. Feil and A. D. Toth of

this office during March 1983 of activities authorized by NRC Construction

Permit No. CPPR-93, and to the discussion of our findings held by the

inspectors with Mr. G. K. Afflerback and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

.

/E0 /

e

.

APR '* 1981

'

"

Washington Public Power Supply System

-2-

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

te

D. M. Sternberg, Chief

Reactor Projects Branch No.1

i

Enclosure:

Inspection Report

No. 50-397/83-12

cc w/o enclosure:

R. B. Glasscock, Licensing and Assurance

Director

cc w/ enclosure:

J. D. Martin, Plant Manager

W. C. Bibb, Director Power Generation

bcc: RSB/ Document Control Desk (RIDS)

Distributed by RV:

JBM

State of Washington

Resident Inspector

J.Elin

D.Willett

N

RV

,,

R. Feil:dh

A.Toth

R.Doddy

D.Sternberg

4/ p /83

4/ g 83 4/0#- 33 4/ 95 /83

~

j