ML20023C555

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-089/83-01 & 50-163/83-01 on 830404-08 & Notice of Violation
ML20023C555
Person / Time
Site: General Atomics
Issue date: 04/25/1983
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parker J
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML20023C556 List:
References
NUDOCS 8305170429
Download: ML20023C555 (2)


See also: IR 05000089/1983001

Text

-

,

.

.

,

. . .

.

-:6

'

~

- ,

'

APR 251983

'

Docket Nos. 50-89

50-163

,

n.

s

, ,

-

.

.

.

G. A. Technologies Inc.

2

,

P. 0.. Box 85608

<

~

'

San Diego', California 92138

Attention:

Mr. J..W. Parker, Director

, Quality Assurance and Compliance-Division

a

Gentlemen:

Subject: 'NRC Inspection of Mark I and Mark F Reactors

This refers to the inspection conducted by Mr. P. H. Johnson of this office

on April 4-8, 1983'of. activities authorized by NRC License Nos. R-38 and

R-67, and to the discussions of our findings held by Mr. Johnson with Messrs.

Parker, Pound, and Shoptaugh and other members of your staff at the conclusion

,

of the inspection.

Areas examined during this inspection are described in the enclosed

'

inspection report. Within these areas, the inspection consisted of selectivel

, examinations of procedures and representative records, interviews with

. personnel,'and observations.by the inspector.

Based on the results of this inspection, it appears that one of the

activities associated with your Mark F Reactor was not conducted in full

compliance with NRC requirements, as set forth in the Notice of Violation,

enclosed herewith as Appendix A.

~

Your response to-this notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this. office,

-by telephone, within ten days of the date of this letter and submit written

-

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the

'

requirements of 2.790(b)(1).

)

d

RV -

j

s

P. J

m/ dot

irsch

t

erg

A. Johnson

4/2Z

'

4/2t/83

4 ./83

4/ /83

)

0305170429 El30425

DR ADOCK 05000009

l

PDR

l-

'

__

1

'

'

APR 251983

G. A. Technologies ~Inc.

-2-

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

D. M. Sternberg, Chief

Reactor Projects Branch 1

Enclosures:

A.

Notice of Violation

B.

Inspection Report

Nos. 50-89/83-01

50-163/83-01

cc w/ enclosures:

Mr. W. R. Howry, GA

Licensing Administrator

bec: RSB/ Document Control Desk (RIDS)

.

1

Distributed by RV:

State of CA

LFMB (w/o enc)

Mr. Martin

.