Forwards IE Insp Repts 50-373/83-11 & 50-374/83-06 on 830307-0408 & Notice of Violation
ML20023C519
Person / Time
Site: LaSalle  
Issue date: 04/28/1983
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20023C520 List:
References
NUDOCS 8305170398
Download: ML20023C519 (2)


See also: IR 05000373/1983011

Text

I

.

.

pyR 2 01983

.

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

R. D. Lanksbury and S. G. DuPont of this office on March 7 through

April 8, 1983, of activities at the LaSalle County Nuclear Station

authorized by NRC License No. NPF-11 and NRC Construction Permit No.

CPPR-100 and to the discussion of our findings with G. J. Diederich and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as specified in the enclosed

Appendix. A written response is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure (s) will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

If we do not

hear from you in this regard within the specified periods noted above,

a copy of this letter, the enclosure (s), and your response to this

letter will be placed in the Public Document Room.

8305170398 830428

PDR ADOCK 05000373

G

PDR

fE0/

.

.

.

2

Commonwealth Edison Company

The responses directed by this letter (and.the accompanying Notice)

are not subject to the clearance procedures of the Office of Management

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by R. L. Spessard (for)

J. F. Streeter, Chief

Engineering Branch 1

Enclosures:

1.

Appendix, Notice

-of Violation

2.

Inspection Report

No. 50-373/83-11(DE);

No. 50-374/83-06(DE)

cc w/encls:

D. L. Farrar, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Superintendent

G. J. Diederich, Station

Superintendent

R. H.'Holyoak, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Philip L. Willman, Esq.

Assistant Attorney General

Environmental Control Division

Reed Neuman, Esq., Assistant

Attorney General

RIII

RI J

RII

RI

-

DuV{ht

..

st

<

.

Reye

e

Stre

r

La

.u

/jp

04/26/83

g 24