Text
I
.
.
pyR 2 01983
.
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R. D. Lanksbury and S. G. DuPont of this office on March 7 through
April 8, 1983, of activities at the LaSalle County Nuclear Station
authorized by NRC License No. NPF-11 and NRC Construction Permit No.
CPPR-100 and to the discussion of our findings with G. J. Diederich and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as specified in the enclosed
Appendix. A written response is required.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure (s) will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter. Such application
must be consistent with the requirements of 2.790(b)(1).
If we do not
hear from you in this regard within the specified periods noted above,
a copy of this letter, the enclosure (s), and your response to this
letter will be placed in the Public Document Room.
8305170398 830428
PDR ADOCK 05000373
G
fE0/
.
.
.
2
Commonwealth Edison Company
The responses directed by this letter (and.the accompanying Notice)
are not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by R. L. Spessard (for)
J. F. Streeter, Chief
Engineering Branch 1
Enclosures:
1.
Appendix, Notice
-of Violation
2.
Inspection Report
No. 50-373/83-11(DE);
No. 50-374/83-06(DE)
cc w/encls:
D. L. Farrar, Director
of Nuclear Licensing
D. L. Shamblin, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Superintendent
G. J. Diederich, Station
Superintendent
R. H.'Holyoak, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Philip L. Willman, Esq.
Assistant Attorney General
Environmental Control Division
Reed Neuman, Esq., Assistant
Attorney General
RIII
RI J
RII
RI
-
DuV{ht
..
st
<
.
Reye
e
Stre
r
La
.u
/jp
04/26/83
g 24