ML20023C407
| ML20023C407 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/29/1983 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20023C408 | List: |
| References | |
| NUDOCS 8305170309 | |
| Download: ML20023C407 (2) | |
See also: IR 05000445/1983008
Text
_-
_
- . _ - . _ -
.
5/7
.
.
'f
E 20
In Reply Refer To:
Docket: 50-445/83-08
Texas Utilities Generating Company
ATT!!:
R. J. Gary, Executive Vice
President & Gmral t'anager
2001 Bryan Tower
Callas, Texas 75201
Gentlemen:
<
This refers to the inspection conducted under the Resident Inspection Program
by our Senior Resident Reactor Inspector, Mr. D. L. Kelley and Reactor Inspec-
tor, f:r. S. L. McCrory, during the period l' arch 1-31, 1983, of activities
authorized by URC Construction Permit CPPR-126 for the Comanche Peak facility,
Unit 1, anu to the discussion of our findings with I'r. J. T. f'.erritt
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included: (1) Initial Startup Procedure
Review; (2) Hot Functional Test; (3) Part 21; (4) Plant Tours; and (5) Plant
Status. These findings are discussed in the enclosed inspection report.
,
Within these areas, the inspection consisted of selective examination of pro-
cedures and representative records, interviews with personnel, and observations
by the inspectors.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
,
this violation, in writing, in accordance with the provisions of Section 2.201
of the llRC's " Rules of Practice," Part 2, Title 10, Ccde of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
j
by teleph.one, within 10 days of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
'
date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1).
8305170309 830429
_
-
PDR ADOCK 05000
/
omci > SRI
RPS-Ag,,
.RPB1,/4
bRRP&
.R.I.if. ,
ES ,4[,
,
ma*> DKe g.ey/.la.c. Tye.st.erman.
..0Madsen . , , .J.Qag.1. <
d.Q . . .EJghnson.,,,,
,
,
,
^ " > %1/83 .
..M/83
44S /.83
4/d/..........
4/ 0./83
4
l
.. ..
.
.
,,
,
, , ,
NRC FORM 318 (10-80) NRCM 0240
OFFICI AL RECORDi COPY
_ . , . . _ _ _ . _ . . . _ . _ . _ . . _ _ _ , _ _ _ , _ _ . _ , _ . _ _ _ _ _ _ .
. - . - .
_ . _ _ . . . _ . _ ,
_
Y
. = _ ,
.
.
Texas Utilities Generating
2
APR 2 91983
Company
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of t'.anagement and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
8 Original Signed DVB
'p. u. SAADsEN*
G. L. f.'adsen, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report 50-445/83-03
cc w/encls:
Texas Utilities Generating Company
ATTH: H. C. Schmidt, Project Manager
2001 Gryan Tower
Dallas, Texas 75201
bcc to DMB (IE01)
bcc distrib. by RIV:
RPB2
Resident Inspector
TPB
Section Chief
MIS SYSTEM
RIV File
RIV Reading File
Br. Reading File
C. Wisner
M. Rothschild, ELD
TEXAS STATE DEPT. OF HEALTH
Juanita Ellis
David Preister
3P.S .
, .RPB..
DRRP &EP/. . . V ,
" ' " > S R. . . .
.TWeste
n
GMad
JGag
do
,,
,
DKe1 y ac
sunuwep
,
,
,
o nTr > 4/
3
1/ /3
4/ /83
4/
3
.
.
. . .
.
.
... -
. ... .
.... . . .
.
l
nac r onu 3,8 . io..o, nacu 02'
OUICIAL RECORD COW