Forwards IE Insp Rept 50-341/83-04 on 830214-0317 & Notice of Violation
ML20023C386
Person / Time
Site: Fermi 
Issue date: 04/27/1983
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20023C387 List:
References
NUDOCS 8305170294
Download: ML20023C386 (2)


See also: IR 05000341/1983004

Text

~ ..

_ . _ _

__

__

_ _ _ _

__ _

..

.

i

-

O

APR 2 71983

I

i

Docket No. 50-341

The Detroit Edison Company

j

ATTN:

  • fr. Donald A. Wells

4

Manager, Quality Assurance

2000 Second Avenue

Detroit, MI 48226

,

i

j

Gentlemen:

This refers to the routine preoperational test program inspection conducted by

F. W. Reimann of this office on February 14 through March 17, 1983, of activi-

ties at Fermi, Unit 2, authorized by NRC Construction Permit No. CPPR-87 and

to the discussion of our findings with Mr. F. Agosti at the conclusion of the

inspection.

The enclosed copy of cur inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel,

i

,'

During this inspection, certain of your activities appeared to be in non-

,

compliance with NRC requirements, as specified in the enclosed Appendix.

1

A written response is required.

,

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

,

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

'

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to file a

request for withholding; and (b) submit within twenty-five (25) days from the

date of this letter a written application to this office to withhold such in-

formation.

If your receipt of this letter has been delayed such that less than

,

seven (7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

i

i

claim that the information should be withheld from public disclosure. This

section further requires the atatement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4) . The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, a cooy of this letter, the enclosures, and your response to this letter

will be placed in the Public Document Room.

8305170294 830427

gDRADOCK 05000341

PDR

-

. -- -.

- . -

-. - . - - - .- --

--

SEC./

.

.

.

2

Detroit Edison Company

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

c L

NC*'

ng. ; n :

1

1.,

_ ) .. ;

R. L. Spessard, Director

Division of Engineering

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-341/83-04(DE)

cc w/encls:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

RII

RIIT

RI$ I

RII

RIII

'

//

i

-

/

-

'i

,

i

Se e ter

Spessard

cima /sv

6

Rey } }}