ML20023C326

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/83-06 & 50-499/83-06 During Mar 1983.No Noncompliance Noted
ML20023C326
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/04/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20023C327 List:
References
NUDOCS 8305170212
Download: ML20023C326 (2)


See also: IR 05000498/1983006

Text

._. ..

.

,

MAy

4 1983

In Reply Refer To:

Dockets:

50-498/83-06

50-499/83-06

-

Houston Lighting and Power Company

ATTN:

G. W. Oprea, Jr.

Executive Vice President

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Mr. W. M. Hill of this office during the period March 1-31, 1983, of

activities authorized by NRC Construction Permits CPPR-128 and 129 for the

South Texas Project, Units 1 and 2, and to the discussion of our findings with

you, and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included review of previously identified

inspection findings; storage and maintenance of equipment; IE Bulletins and

Notices; construction deficiency reports; nonconformance reports; construction

activity packages; electrical systems; structural concrete and QA/QC procedures.

These findings are documented in the enclosed inspection report. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations were

identified.

Three unresolved items are identified in paragraphs 10 and 11 of the enclosed

inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the requirements

,

i

of 2.790(b)(1).

I

SRI W

RPS-B W

RPB1 W

DRRP&

V

hMadsen

[ WHill/dsm

WCrossman

"

'T"~

s/y'o

M c C] l

JGagl

s/3 /83

5/3/83

s u /83

B305170212 830504

$

PDR ADOCK 05000498

G

PDR

.

-.

v

.

a

,.--

t

t

7

r--

e

+ - "


y-

--

-=v

< =-

-'---&+-------r

r-r-

we-

w

  • * * - = + - -
  • --e

- - - - -

-w

ww

  • ii~r

w

w,

_ - - .

..

_.

..

.

.

NAY

E bO3

Houston Lighting and Power

-2-

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

s.ortsinal 51snod DVi

JurB6 CROSSMAN*

G. L. Madsen, Chief

.

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-498/83-06

50-499/83-06

bec to DMB (IE01)

bec distrib. by RIV:

-

RPB1

Resident Inspector

RPB2

Section Chief (RPS-B)

TPB

J. Collins, RA

C. Wisner, PA0

D. Sells, NRR

MIS SYSTEM

RIV File

TEXAS DEPT. OF HEALTH RESOURCES

,

i

l

I