BOSTON lEDISO N COMPANY BDO BOYLETON STREET 80sTON, MABBACHUSETTs D2199 i WILLIAM D. HARRINGTON May 13,1983 BECo Letter No. 83 122

""5*""

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 License No. DPR-35 Docket No. 50-293

Subject:

Fire Protection Technical Specification Change Submittal

Dear Sir:

In a telephone conver. cation between Boston Edison and Mr. Eccleston (NRC Project Manager for Pilgrim Station), Boston Edison committed to supply a schedule for changes to Technical Specifications which would address requirements militated by the fire protection issue.

We herein provide a schedule to satisfy that commitment.

Although we expect NRC to issue this as a single amendment, we intend to submit it in segments to facilitate our preparation and your review processes.

The segments and their respective schedules are shown below:

i General Segmentation l

l SECTION 3/4.12 LCO's and Surveillances A.

Detection B.

Fire Water Supply and Distribution C.

Spray / Sprinkler System D.

Fire Hose Stations E.

Halon System F.

Fire Barriers G.

Alternate Shutdown Panels A.

DETECTION (SM0KE) o Turbine and Control Building o

Radwaste Control Area o

Reactor Auxiliary Building ( Aux. Bay)

-C)g)j, o

Diesel Generator Building o

Reactor Building o

A.0.G.

This will be submitted December 30, 1983.

8305170173 830513 PDR ADOCK 05000293 F

PDR

r COSTON EDI2ON COMPANY Mr. Domenic B. Vassallo, Chief May 131983 Page 2 B.

FIRE WATER SUPPLY AND DISTRIBUTION o

Elec. Pump o

Diesel Pump o

Tanks o

Interior / Exterior Loop and Associated Valves This will be submitted November 15, 1983.

C.

SPRAY / SPRINKLER SYSTEM o

Diesel Generator and Day Tanks Pre-Action System o

Diesel Fire Pump Day Tank o

Auxiliary Boiler Room o

Recire. Pump MG Set Room o

Standby Gas Treatment System i

o Hydrogen Supply 011 Unit o

Turbine Basement Addition This will be submitted November 15, 1983 D.

FIRE HOSE STATIONS o

Reactor Building o

Reactor Aux. Bay o

Turbine Building o

Retention Building o

Radwaste Area o

Diesel Generator Rooms o

Screenhouse o

Switchgear Rooms Elev. 23' and 37' and Stairwell This will be submitted November 15, 1983.

E.

HALON SYSTEM o

Cable Spreading Room (3.1.3 Gas Fire Systems) o Dry Chemical System This will be submitted October 17, 1983.

/

CORTON KDICON CO M PANY e

Mr. Domenic B. Vassallo, Chief May 13,1983 Page 3 F.

FIRE BARRIERS o

Active Dampers Doors o

Passive Penetration Seals This will be submitted September 16, 1983.

G.

ALTERNATE SHUTDOWN PANELS o

Core Spray M0V's o

LPCI MOV's o

RBCCW Pump o

HPCI Pump and valves o

RCIC Pump and valves o

ADS Operation o

SSW Pumps This will be submitted July 20, 1983.

We believe this satisfies our commitment to provide a schedule for Fire Protection Technical Specifications.

Should you require further information concerning this submittal, please contact us.

Very truly yours, b

,