Monthly Operating Rept for Apr 1983
ML20023C244
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/11/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20023C241 List:
References
NUDOCS 8305170014
Download: ML20023C244 (5)


Text

.-. - - .-_ - - - - - _ _

o 1 OPERATING DATA REPORT DOCKET NO. 50-336 DATE 5/11/83 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 OPERATING STATUS

1. Unit Name: Millstone 2 Notes Items 21 and 22
2. Reporting Period: April 1983 cumulative are weighted
3. Licensed Thermal Power (MWt): 2700 ave. unit operated at
4. Nameplate Rating (Gross MWe): 909 2560 MW thermal prior to
5. Design Electrical Rating (Net MWe): 870 its uprating to its
6. Maximcm Dependable Capacity (Gross MWe): 895 current 2700 MW thermal
7. Maximum Dependable Capacity (Net MWe): 864 power level.

i 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) i Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hou rs In Reporting Period 719 2879 64391
12. Number Of Hours Reactor Was Critical 719 2478.4 47713.2
13. Reactor Reserve Shutdown Hours 0 0 2205.5
14. Hours Generator On-Line 719 2342.8 45530.1
15. Unit Reserve Shutdown Hours 0 0 468.2
16. Gross Thermal Energy Generated (MWH) 1921628 6164769 11458974
17. Gross Elec. Energy Generated (MWH) 632700 2012630 37243478 i 18. Net Electrical Energy Generated (MWH) 610462 1932663.3 35694476
19. Unit Service Factor 100 81.4 70.7
20. Unit Availability Factor 100 81.4 71.4
21. Unit Capacity Factor (Using MDC Net) 98.3 77.7 66.5
22. Unit Capacity Factor (Using DER Net) 97.6 77.2 65.6
23. Unit Forced Outage Rate 0 16.9 19.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage, MAY 28, 1983, 16 weeks.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

(

8305170014 830512 PDR ADOCK 05000336 PDR R

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 5/11/83 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 MONTH APRIL 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 858 17 859 2 857 18 858 3 856 19 858 4 857 20 861 5 857 21 682 i

6 858 22 787 7 857 23 857 8 858 24 858 9 858 25 859 10 858 26 859 11 857 27 860 12 858 28 860 13 858 29 860 14 858 30 860 15 859 31 ----

16 859 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DOCKET NO. 50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 2 DATE 5/11/83 COMPLETED BY J. Gibson REPORT MONTH April 1983 TELEPHONE (203) 447-1791 Ext. 4431 1 2 Ij No. Date Type Duration Reason Method of Licensee Systeg l Compogent Cause & Corrective (Hours) Shutting 3 Event Code Code Action to l Down Reactor Report # Prevent Recurrence 4 830421 F 0 A 1 83-15 RB CONROD Dropped CEA #62.

Reduced power below 70% per tech spec.

requirement. Retrieved rod and proceeded with normal ramp up procedure See LER #83-15.

1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refuling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exihibit 1 - Same Source H-Other (Explain)

Docket No. 50-336 Date 5/11/83 Unit Name Millstone 2 Completed By J. Gibson Telephone (203) 447-1791 Ext. 4431 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT REPORT MONTH April 1983 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/19/83 CVCS 2-CH-326 Disassemble, inspect and repair valve.

4/26/83 CVCS 'C' Charging Pump Repack Pump.

4/26/83 CVCS 'A' Charging Pump Remove oil pump, tighten pump set screw, re-install 4/8/83 Main Steam Blowdown Piping Repair blowdown piping downstream of 2-MS-219.

4/22/83 Main Steam 2-MS-117B Replace body to bonnet gasket.

4/12/83 Fire Protection HELP-1 Replace panel batteries in help-l and repair and Deluge ground leads.

4/14/83 Fire Protection HELP-2 Replace panel batteries, and Deluge 4/25/83 Fire Protection 2-WW-149 Replace relief valve on Fire Pump P-51.

and Deluge ,

4/27/83 Process and Area Spent Fuel Pool Rad- Replace remote meter and perform calibration.

Rad-Monitoring Monitor 4/27/83 Process and area S/G Blowdown Monitor Replace probe assembly.

Rad-Monitor l

Docket No. 50-336 Date: 5/11/83 Completed By: J. Gibson Telephone: (203) 447-1791 Ext. 4431 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2
2. Scheduled date for next refueling shutdown: May 28, 1983
3. Schedule date for restart following refueling: September 17, 1983 (16 wks outage)
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

It is anticipated that Cycle 6 operations will require i Technical Specification changes or other License amendments.

5. Scheduled date(s) for submitting licensing action and supporting information:

Safety Analyses: April 13, 1983 Steam Generator Licensing Action: June 1, 1983

6. Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: Additional plugged steam generator tabes will result in potential reactor coolant flow reduction. Currently planning

, to install sleeves in steam generator tubes.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

l (a) In Core: 217 (b) 288 I 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.