Forwards IE Insp Rept 50-382/83-16 on 830328-31.No Noncompliance Noted
ML20023C233
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/29/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maurin L
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20023C234 List:
References
NUDOCS 8305170004
Download: ML20023C233 (2)


See also: IR 05000382/1983016

Text

_

- .

-._

.

.

N4l 2 91983

In Reply Refer To:

Docket:

50-382/83-16

'

Louisiana Power and Light Company

ATTN:

L. V. Maurin, Vice President

Nuclear Operations

142 Delaronde Street

New Orleans, Louisiana 70174

Gentlemen:

This refers to the inspection conducted by Mr. C. R. Oberg of this office

during the period March 28-31, 1983, of activities authorized by NRC Construc-

tion Permit CPPR-103 for Waterford Steam Electric Station, Unit 3, and to the

discussion of our findings with Mr. L. L. Bass, and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection included safety-related records of the

reactor vessel internals; site related design activities; and a reported

potential construction deficiency on the emergency feed water system.

These

findings are documented in the enclosed inspection report. Within these areas,

the inspection consisted of selective examination of procedures and representa-

,

tive records, interviews with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were

identified.

Three unresolved items are identified in paragraphs 2b, 2c, and 4b of the

enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

,

!

will be placed in the NP.C Public Document Room unless you notify this office,

!

by telephone, within 10 days of the date of this letter, and submit written

l

application to withhold information contained therein within 30 days of the

l

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

RP -

RPS-B

RPB1

DRRP&EP,

V

C0

/dsm

WCr ssman

GMapsen

JGagli rdo

'

'

4/ /83

4

/83

4/p/83

4/ef/

T

\\ 8 01

r

.

G

____

., _ . . . - _ . -

.

. -

-~

_

_ _ _ . . - _ , _ _ . _ _ . _ . . . ~ . _

_ _

_

.

.

Louisiana Power and Light

-2-

lW4t 2 91983

Company

Should you haveiuly questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

"Orlaines sinned by,

G. u,ad40SE *hief

G. L. Madsen,

Reactor' Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-382/83-16

cc w/ enclosure:

Louisiana Power and Light Company

ATTN:

F. J. Drummond, Project Support Manager

142~Delaronde Stree.t

New Orleans, LA 70174

Mr. T._F. Gerrets, QA Manager

(same address)

Louisiana Power and Light Company

ATTN:

R. P. Barkhurst, Plant Manager

P.O. Box B

Killona, LA 70066

bcc to DMB (IE01)

bcc distrib. by RIV:

RPB1 (Debbie)

Resident Inspector

RPB2

Section Chief (RPS-B)

TPB

C. Oberg

RA

C. Wisner

MIS SYSTEM

RIV File

RIV Reading File

Br. Reading File

LOUISIANA DIV. OF RAD. CONTROL