ML20023B999
| ML20023B999 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/05/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 830503, NUDOCS 8305090472 | |
| Download: ML20023B999 (1) | |
Text
,
DUKE POWER Go>n%NY l'.O.HOX 3318D CIIAllLOTTE. N.G. 28242 IIAL 15. TUCKEH Ter.renoxe vu:s ear. ament (704) 373-4531 May 3, 1983 mm.,-cm."
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Our letter of April 18, 1983 contained a report on the reactor trip breakers (RTB) for McGuire. This report included a discussion of RTB problems. One problem was identified, however, which was not contained in the report but was discussed in the April 19, 1983 meeting with the NRC staff.
During investigative testing on March 31, 1983, Unit 1 train B RTB was found to have no gap between the undervol-tage device trip arm and the breaker trip shaft pin.
This problem was similar to one discovered on March 19, 1983 on Unit 1 train A RTB and reported in our April 18, 1983 letter. As stated in that letter, the proper gaps have since been veri-fied for all McGuire RTB's.
We regret any inconvenience caused by this inadvertent omission from the April 18, 1983 letter.
Very truly yours, C gX$4x Hal B. Tuckcr REH:jfw cc:
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station g/
0305090472 830503 PDR ADOCK 05000369 p