ML20023B727

From kanterella
Jump to navigation Jump to search
Application to Amend License DPR-71 Revising Tech Specs to Complete Third Refueling Outage & Begin Cycle 4 Operation. Proposed Changes Revise Control Rod Scram Insertion Time Requirements
Date released: 02/06/2020 Download: ML20023B727


Proposed Tech Spec Changing Control Rod Scram Insertion Time Requirements to Complete Third Refueling Outage & Begin Cycle 4 Operation
ML20023B728
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/02/1983
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML20023B728 (30)
Application to Amend License DPR-71 Revising Tech Specs to Complete Third Refueling Outage & Begin Cycle 4 Operation. Proposed Changes Revise Control Rod Scram Insertion Time Requirements
ML20023B726
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/02/1983
From: Howe P
CAROLINA POWER & LIGHT CO.
To: VASSALLO D B
Office of Nuclear Reactor Regulation
References
Download: ML20023B726 (2)