Forwards IE Safeguards Insp Rept 50-247/83-08 on 830228-0304 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21 & 10CFR2.790)
ML20023B566
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/20/1983
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Otoole J
COMMONWEALTH EDISON CO.
Shared Package
ML20023B567 List:
References
NUDOCS 8305050187
Download: ML20023B566 (2)


See also: IR 05000247/1983008

Text

'

.

hNb

.

20 APR 1983

Docket No. 50-247

pzsicyAED CF.IGIKAL

c -.+ 1ne.1 F7

-

-

~'

.

Consolidated Edison Company of

New York, Inc.

ATTN:

Mr. John D. O'Toole

Vice President - Nuclear

Engineering and Quality Assurance

4 Irving Place

New York, New York 10003

Gentlemen:

Subject:

Inspection No. 50-247/83-08

.

This refers tc the routine safeguards inspection conducted by Mr. R. J. Bailey

of this office on February 28 - March 4,1983 at Indian Point Nuclear

Generating Station, Unit 2, Buchanan, New York, of activities authorized by

NRC License No. DPR-26 and to the discussions of our findings held by Mr.

Bailey with Mr. C. Jackson and members of his staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the

inspector.

.

Our inspector also verified the steps you have taken to correct the violations

brought to your attention in the enclosure to our letters dated March 19,

1982, April 23, 1982, August 24, 1982, November 19, 1982, December 30, 1982,

January 17, 1983, and January 18, 1983. We have no further questions

regarding your actions at this time.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC reycirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

This

violation has been categorized by severity level in accordance with the NRC

Enforcement policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (47 FR 9987) dated March 9, 1982.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations. Although Section 2.201 requires you to

submit to this office, within 25 days of your receipt of this notice, a

>

written statement of explanation, we note that this violation was corrected

prior to the completion of our inspection, and therefore, no response with

respect to this matter is required.

Sections of the enclosed inspection report contain details of your security

program that have been determined to be exempt from public disclosure in

accordance with either 10 CFR 73.21 (Safeguards Information) or 10 CFR 9.5(a)(4) (Commercial or Financial Information). Therefore, the sections so

0FFICIAL RECORD COPY

8305050187 830420

_dj

J

l

PDR ADOCK 05000247

g

PDR

_ _ _ -

-- -

-.

,

.

. _ .

--

.__

.-_-__ .

e

,,

0 Uk 199y

Consolidated Edison Company of

  • . .

2

New York, Inc.

identified in the inspection report and Appendix A will not be placed in the

The

NRC Public Document Room and will receive limited distribution.

inspection report cover sheet and any remaining portions of the inspection

in accordance with 10 CFR

report will be placed in the Public Document Room,

2.790(a), unless you notify, be telephone, the Supervisor, Files, Mail and

within 10 days of the date of this

Records, USNRC Region I, at (215) 337-5223,

letter and submit written application to withhold information contained in the

Such application must

report within thirty days of the date of this letter.

be consistent with the requirements of 10 CFR 2.790(b)(1).

Your cooperation with us in this matter is appreciated.

Sincerely,

f

g

CM 8=1 sic:aay,

T. Martin, Director

Division of Engineering ard Technical

Programs

Enclosures:

Appendir A, Notice of Violation (Contains Safeguards Information)

50-247/83-08 (Paragraphs 3.f end 13

1.

NRC Re2 on I Inspection Report Number

i

contain Safeguards Information and Paragraphs 3.c and 3.g contains

2.

Commercial Information)

cc (w/o Encl. I and Paragraphs 3.c, 3.f, ~3.g and 13 o f Encl . 2):

l

C. W. Jackson, Vice President, Nuclear Power

M. Blatt, Acting Director, Regulatory Affairs

W. D. Hamlin, Assistant to Resident Manager (PASNY)

F. Matra, Resident Construction Manager

R. L. Spring, Nuclear Licensing Engineer

-

Thomas J. Farrelly, Esquire

K. Burke, General Manager, Administrative Services

Brent J. Brandenburg, Assistant General Counsel

t

l

Director, Power Division

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

!

NRC Resident Inspector (w/encis)

State of New York

bec (w/o Encl.1 and Paragraphs 3.f and 13 of Encl. 2, and Paragraphs 3.c and 3.g

contains Safeguards or Commercial Information)

,

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

Section Chief, DPRP

i

h

%l

.

II:0ETP

@:mP

R

TP

!

T.

artin

Aonerufm-

ailey/

Gody

yf9 As

4124n

AL RECORD COPY

0FFI

.