ML20023B389

From kanterella
Jump to navigation Jump to search
Forwards Const Project Evaluation for Catawba Nuclear Station.
ML20023B389
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/30/1982
From: Owen W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023B390 List:
References
NUDOCS 8305050008
Download: ML20023B389 (1)


Text

g* 1 DUKE POWER GoxmNY Powan BtnLntxo, Box 00189, CHARLOTrz, N. G. 28c42 W.14. C W E N gas m m pets 4.&

E88Sah(gghte$ & C(ges3?T.!(*g4 170 4 373

  • 2O December 30, 1982 James O'Reilly US Nuclear Regulatory Comission, Region II 101 Marietta St. N.W. , Suite 3100 Atlanta, Georgia 30303

Subject:

Self-Initiated Evaluation of Duke Power's Catawba Nuclear Station Please find attached a copy of the Duke Power Self-Initiated Evaluation perfonned at Catawba Nuclear Station. The evaluation was conducted by a team of individuals from Tennessee Valley Authority and Duke Power Company.

The team evaluated Design, Conctruction, and Quality Assurance functions for Catawba. The criteria used to perform the evaluation was developed by the Institute of Nuclear Power Operations (INPO) of which Duke is a member.

If necessary, we will be glad to meet with you or your staff to discuss this report.

l l

/

IUU% QBlazny;', .

W H Owen M uted W N, M yji % ii/W Executive Vice President Engineering and Construction hg WHO. M mld cc: G W Grier l H L Huggett gpl W 0 Henry P K Van Doorn fj/: N g6 l

attachment g@aol 8305050008 821230 PDR ADOCK 05000413 l A PDR

-. .-_