Forwards Response to Generic Ltr 82-16 Re Tech Specs Required by NUREG-0737 Items
ML20023B191
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/17/1982
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-1.A.1.3, TASK-2.E.1.1, TASK-2.E.1.2, TASK-2.E.4.1, TASK-2.E.4.2, TASK-2.K.2.08, TASK-2.K.2.13, TASK-2.K.3.03, TASK-2.K.3.12, TASK-TM 5211-82-263, GL-82-16, NUDOCS 8212270134
Download: ML20023B191 (3)


Text

-. - -

e GPU Nuclear Corporation

>i ? Nuclear

=rs:48o 8

Middictown. Pennsylvania 17057 717 944-7621 TELEX 81-2386 Writer's Direct Dial Number Decater 17, 1982 5211-82-263 Office of Nuclear Reactor Regulation Attn:

D. G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.r-20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 l

NUREG 0737 Technical Specifications Response to Generic Letter No. 82-16 The enclosure to this letter is GPUN's response to Generic Letter 82-16.

Sincerely, i

L H. D. Hukill Director, Hil-1 HDH:CWS:vj f Enclosure cc:

R. C. Haynes I

J. Van Vliet

(~ 8212270134 821217

~ ~ ~

~

AL I PDR ADOCK 05000289 MMY P

PDR_

GPU Nuclear Corporation is a subsidiary of the General Pubhc Utiht,es Corporation

)

n Response to Generic Letter 82-16 NRC Staff Guidance Concerning Technical Specifications (TS) Required by NUREG 0737 1.

STA Training (I.A.l.l.3)

Resolved by TS 6.2.2 and 6.3.3 issued with Amendment 77 to the TMI-l TS.

2.

Licit Overtime (I.A.l.3)

See GPUN Letter 5211-82-295 dated December 16, 1992.

3.

Short Term EFW Evaluation (II.E.1.1)

Resolved by TS 3.4 and 4.9 issued with Amendment 78 to the TMI-l TS.

1 i

4.

Safety Grade EFW Initiation and Flow Indication (II.E.1.2) 1 l

TMI-l is upgrading the EFW System to safety grade during Cycle 6 refuelin;.

Additional TS changes, if necessary, will be filed at that time for EFW initiation and control.

j l

l EFW flow indication is covered by TS 3.5.5 and 4.1 (Table 4.1-1 item 50) issued with Amendment 78 to the TMI-l TS.

5.

Dedicated Hydrogen Penetrations (II.E.4.1)

TS Change Request (TSCR) 109 filed January 26, 1982 addresses the Hydrogen Recombiner.

TSCR - 113 filed April 21, 1982 addresses the Appendix J requirements for the Hydrogen Recocbiner valves.

6.

Containment Pressure Setpoint (II.E.4.2.5)

Existing TS cover this item as documented in the SRC evaluation for this ite forwarded to GPUN by NRC letter dated April 21, 1981.

7.

Containment Purge Valve (II.E.4.2.6)

Proposed TS addressing the containment purge valves were forwarded by TSCR 116 filed August 13, 1982.

S.

Eadiation Signal on Purge Valves (II.E.4.2.7)

Resolved by TS 3.5 (table 3.5-1 item C.3.f) and 4.1 (table 4.1-1 item 19.e) issued with Amendrent 78 to the TMI-l TS.

9.

Upgrade B6W EFW System (II.K.2.8)

See response to item 4 above (II.E.1.2) 10.

(Enclosure 1 to Generic Letter 82-16 does not list an item 10) 11.

B&W Thermal-Mechanical Report (II.K.2.13)

GPUS responded to this item by letter dated June 1, 1982 (5211-82-132) and July 7, 1982 (5211-62-163).

No Technical Specifications were deemed necessary and none were proposed.

12.

Reporting of SV and RV Failures and Challenges (II.K.3.3)

Resolved by TS 6.9.1.B.4 and 6.9.2.A.10 issued with Amendment 77 to the TMI-l TS.

13.

n\\nticipatorv Trip on Turbine Trip (II.K.3.121 Resolved by TS 3.5 (Table 3.5-1 item B.1 and B.2) and TS 4.1 (Table 4.1-1 items 45 and 46).