ML20023B090
| ML20023B090 | |
| Person / Time | |
|---|---|
| Issue date: | 12/08/1982 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20023B091 | List: |
| References | |
| FOIA-83-283 NUDOCS 8212230027 | |
| Download: ML20023B090 (21) | |
Text
I S
No:LYAR REGULATOMY COMMISSION
' f f ~ ~~ ~~~ ~
,i eso.masose.o. c. neees Y
h Q blLlat'
- w gy i
shta t;
vbe u
b MEMORAN9UM FOR: Rarrell 8. Eisenhet. NRR Db). bo/m b
Eduard L. Jorden. IE b
Ric.hard E. Cuentaphes.1985 t
.o e,t...or.oro, mi tL Clemens J. netteese.-Jr., AE00 Joseph 9 state. ELS FROM:-
Vister Stelle. *.. thelsener F
Cesarittee to Anviam Generls Angettements I
SWJECT:
CAA METIRB NWWER N y[
The Committee to Asview Generic Regsfrements will most en Teendey, setember 21, 1982, from 1-5 p.m. in Reem SOB 71855.
1:00 - 2:00 pn W. Mills (IE) wi11-brief tWttee concors m IE l
actions to address cheek velve fis11eres in dies i
[,
gesoreter engtno systees.
2:00 -'3:00 pm F. Nebden (AERD) and W. 91111s (IE) will-jointly l
brief the Consittee'concerning relemaktag actions ts -
address Licensee Event netification (19 Cpt ports
(
90.72 and $8.73).
1 3:00 - 5:00 pm R. Bernere (8ES).will respond to Committee geestions -
conceratag A1MS. These geestions resulted from the A1MB presentation given at CA R Resting #24 and are articulated in the minutes for that meeting.
(A-copy of the responses to these geestions.is enciesed.)
Persons making presentations to the CRGR are responsible for (1) assuring
+
that the inferimetion regbired for CRM review is provided to the Committee (CRGR Charter - IV.8), (2) coordinating and presenting views of other.
offices. (3) as appropriate,: assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRER contact (Walt Schwink, x24342) and others involved with the presentation. With regard to attendance at CRGR:
meetings.-'.! request that Office Directors limit attendance of their staffs at CRGR meetings to those, few senior staff needed to address the M?K
.,c wa
' A Copy Has Been Sent to PDR
- 3 p
-j<
K e
g q y 27 e2,2io-t
p,,.
/
.s.
DEC 8 FR nC41t Members
. 1 9
g
-agenda ites under discussion. As a minimus Sfwfsion Directors or Lhtg%er annegement should attend meetings eMsing agenda 1taas under
- thate'perview.
Oddoel alped tr.
y, mens Victor Stalle,- Jr., Chatsma Cosmetttee et Baview esseric Rogstrements
' Enclosare:- As stated
.ecis/ enc 1,:
' SECT-cc w/o enc 1:
cemetesten:(5) x E00--
T Office Directors hegtemal Aestnistrators
.8. Cunningham W.' Mills F. Nebden R.LBerners 1
DISTRIBUTION.
VStello
. TEMurley
- DEDR0GR staff -
~ DEDROGR cf Central File POR(MRG/CRGR)-
SStern
-WBrach' j
CCameron
-l
. Friebdon -
RErickson l
1Wl.i ttle "JGag11ardo -
- Jiwetzig 0Grimsely w -.
~1 l$ '
u,.a y :1DE b 5 $ E.._ N, J E. _.DE.DR0G L.
L _cf W5chwinkth; T&Murley:
- VStello
9 s
p s,
e o
t i
a t
n t
n t
a o
g
,c o
S w
r w
i
?
i n
i e
e ei t
t e
t t
i p
i a
a r
a 2
n v
o v
r r
r r
8 e
e r
e a
a u
a r
r p
r p
p c
p 0
r e
e n
e 3
u n
n n
nr nr no nr C
I I
I I p I p I c I p 11
.n o
k k
E
&e n
r n
t i
T n
i o
A Rto w
e e
l w
r i
a D
Gch x7 h2 n4 n4 y6 h2 x7 ed
)
0ap o5 c4 a6 a5 a5 c
o5 dr 3
0te C3 S3 K3 K3 T3 SM C3 ii 8
0nl 4
4 4
4 4
4 4
sh 9
Eoe 2
2 2
2 2
2 2
nT 1
DCT T x Wx Wx Wx Mx Wx Tx o
c-03 RC G
R R
R R;
r R
e N
R A
Cd b
I 5
M n
S M
ro m
e n
M E
E oc t
I I
n f e v
o u
o S
o e
s h
e' t
s N
&n p
r n
s s
r s
k-t e
m e
e l
l t
n e
g ceh o6 k7 s2 l1 l1 n6 h1 e8 n
acs h9 a8 i7 i9 i9 i6 o3 w
tie T6 B3 E6 M7 M7 M9 J3 i
d nfl 9
4 7
4 4
5 7
3t n
of e 2
7 2
2 2
3 2
s E
cot Nx Rx Dx Wx Wx Ax Wx sr A
d wi D
n
. n oF N
a l
E do l -
G 2
ei a,A A
8 tt l
9 se R
1 el 2
G upe 3
3 3
3 3
3 3
- t s R
qmt 8
8 8
8 8
8 8
sc
.C 1
eoa
/
/
/
/
/
/
/
yi RCD 1
1 1
1 1
1 1
al E
r G
e df N
b n
A m
.n 3o R
e o
c c
i n
G e
t ie N
D l
a l
.O aRr nu L
'a ftGe od n
otRd ie
. i iCi 2
2 2
2 2
2 2
uc th n
em s
8 8
8 8
8 8
8 l s n
tbrn
/
/
/
/
/
/
/
o auoo 2
2 2
2 2
2 2
se ie DSfC 1
1 1
1 1
1 1
er e
S ra d
se o
/+
er yy re ir rt ih e
oi ut P
gr q
eo ee h
ti A
A A
8 A
A 8
e
)
rr t
ar
/
/
/
/
/
/
/
,h 2
n CP 2
2 2
2 2
2 2
1W 4
o M
3 4
2 r
c y:
1 n
o e
a u
y ne 9
cs 2
(
o f
p ct r
rP ei 4
i i
t S
in t s aR gt
(
t f
ds f a r
se d5 ri p
di rn h
Ric a
nn n-er k
i el ai c
Fti l
Ii oy mo n
r ra da e
Cof u
L cr Ei i
c eu ng T
Ni c
n et r
w s
t qs aA 3
n r
og Ss P
h e
sem t
d 1
,g ei n
D iR a Sn r
2i vC ei f m sg S
i c
n x
o a
o7S l/
ds oe en r
ire
,i d
t.
an in hn o
mo 0t n
0f Vi ue ii t
dt n 2c a
e5os t
GS o
l C o rl l
e A ao e
t g
t k e rrs gd W
i ou a
l ri tt S
nt nn cl
.t t ei t
Cet ro aroe el gn nt v ee thL R pa ar E
haiv h u ee oae i
T l
CSGT:
f Oc PP C
CPtE CB Rm CWR ac C
p RR c
A
Octo of Submittal Requested Contact DEDA0GR Category /
for CRGR Completion Office &
Contact &
Priority +
Consideration.Date.
. Telephone Telephone Current Status g. Title'or Description Revision to ECCS 28 12/82 1/83 M. Fielshman, RES-M. Taylor in review.
Rules - Phase 1 x35M1 x243M Revision 2 of Reg.
2/A 12/82 1/83 R. Mennea11y, RES M. Taylor.
. Resolving Guide 1.12 "Muclear'
~
x35092 x243M '
review Pow 2r Plant Instru-comments mentation for Earthquake" Revision 1 of Reg.
2/A 12/82 1/83 T. Harpster, IE W. Kane In-Guide 1.33 QA Prog.
x24774 x24354 properation Rqmts. (Operations)
Revision 1 o(~ Reg.
2/A 12/82 1/83 R. Kornasfewicz, M. Taylor In Guide 1.23, Onsite RES x74394 x243M properation Meteorological Progralis MPA - 871 120 Vac 2/A 12/82 1/83
- 0. Eisenhut, MAR M. Taylor In Vital Instrument x27672 i
x24386 preparation Buses and Invertor Tech. Specs.
Reg. Guide 1.56, 2/A 12/82 1/83 C. Shulten, RES M. Taylor In review
" Maintenance of Water x28482 x243M Purity in BWRs" Revision of Reg.
2/A 12/82 1/83
- 0. Boehm, RES M. Taylor Resolving Guide 1.105, Instru-x35966 x24356 public comments ment Setpoints l
\\
~
~
Date of
~
'~
~
Submittal Requested Centact SGW10GR Category /
- for CRGR Ceapletion Office &~
Contact &-
to. Title or Description Priority +
-Consideration M
Telephone Telephone Current Status Notice of Proposed 2/A 12/82 1/83 J. Jenkins, MS
'M. Taylor In
-Rulemaking liuman x35942 x24356-preparation Factors General Design Criteria, 10 CFR 50, Appendix A
. Proposed Amendment 2/C 12/82 1/83 E. Seher. E$
T..Com-
.Sent to E00 to IG CFR 50,55a x3552 x24357-incorporating the Summer 1982 Addenda of the ASME Boiler and Pressure Vessel Code Effective Rule 2/C 12/82 1/83 E. Seher, MS T. Con In Incorporating the x30002 xM357 concurrence Winter 1981 Addendum (Office of ASME Boiler and Director)
Pressure Vessel Code s
Reg. Guide 1.8, Rev. -
2/A 12/83 4/04 E. Norschoff, MS T. Can In m30042 x24357 preparation Personnel Selection i
- and Training Final'LER Rule (Plus) 2/A
'12/82 1/83 F. Nehden, AEAD W. Schwink.
Resolving Status Report on M24400 x24342 50.72, 55.55(e) and Pa rt. 21)
Qualification of 2/A 1/83 2/83 J. Vera/
M. : Tayhr Resolving Electric Equipment S.
1, MS x24342 public f
.Important to Safety x
comments
(
Rev. I to R.G. 1.89 l
---__-----------------m
~.a.c g^ i :. ;
Q: y Date of UD Submittal Requested Contact DEDROGR ic$
Ca tegory/
for CRGR Corepletion Office &
Contact &
d"3, m
istie or Description Priority +
Consideration Oste Telephone Teleohone Current S g 9~
4.i" O b.'s Fere Step 2/8 1/83 2/83 A. Datta, RES T. Cox In WDP QuMirication x35946 x24357 prescratIon
$;h Steam Generator 2/A 1/83 2/83 D. Eisenhut, HRA W. Kane In A
-1 Generic Requirements x27672 x24354 preparation f7 Reg. Guide 1.13, 2/A 1/83 2/83 C. Schulten, RES W. Schwink In review.
k r.,
" Spent fuel Storage x28482 x24342 s'
i Facility Design Basis" g
- 3. t r Post-LP Change Rule 2/8 1/83 2/83 A. Dipalo, RES T. Cox In review x35981 x24357 l-Regulatory Guide on 2/A 1/83 2/83 H. Graves, RES W. Kane In review b.-
Ancharing Components x35982 x24354 and Structural Support 5 in Concrete f~
(MS 129-4)
,L.
10 CfR 50, Appendix J 2/A 1/83 2/83 G. Arndt, RES H. Taylor Preparing FRN General Revision x35860 x24356 statement of conciceration 5
1 h
Revision of Reg.
2/A 1/83 3/83 T. Harpster, IE T. Cox In review g
Guide 1.94, QA Prog.
x24774 x24357 K.n Ramts. for Instal 1.,
O Inspect., & Testing
$1g cf Structural Ccacrete f; e
@pg
!S Alternative Site Rule 2/8 1/83 2/83 P. Hayes, RES M. Taylor In x74318 x24356 prepars tion Tj J f Nh sq
}g '.
kc.'
W
.k wn S}) k V
Date of
~
Submittal Requested Contact DEDROGR Category /
for CRGR Completion Office &
Contact &
9 Title or Description Priority +
Consideration Date Telephone Telephone Currvent Status Revision 3 of Reg.
2/A 1/83 2/83 H. Ashar, RES T. Cox Resolving Guide 1.35. ISI of x35812 x24357 public comments ungrouted tendons in prestressed con-
{
crete containments
}
[
Reg. Guide 1.35.1 2/A 1/83 2/83 H. Ashar, Res T. Cox Resolving x35892 x24357 publir Determining Pre-coments g
stressing forces for ISI of Pre-stressed concrete contain.ments Revisio;. of Reg.
2/A 1/83 3/83 T. Harpster, IE W. Kane In x24774 x24354 preparation Guide 1.28. QA Proc. Ramts (Design
& Construction) 10 CFR 50.55(e) &
2/A 1/83 2/83 F. X. Cameron, RES W. Kane In x24354 preparation x35981 i
i 10 CFR Part 21 reporting of defects r
& noncoepliance
,2 Final Rule, Trans-2/A I/83 2/83 D. Hopkins, RES W. Schwink In x35825 x24342 cor errence portation of Radio-
.i.
active material O
corrpatibility with IAAA Regulations, 10 CfR Part 71 Final Rule on 2/A 2/83 3/83 H. Fleishman, RES M. Taylor Final Draft.
x35981 x24356 in preparation Hydrogen Control 10 CT4 Part 50.44(c)
I h
+
??YM W:.
'fkh Date of Submittal Requested Contact DEDROC.R O
I Category /
for CRGR Corpletion Office &
Contact &
g Title or Description Priority +
Consideration Date Telephone Telephone Cyrrent statys
["s k :
Decc:raissioning 2/A 2/83 3/83 C. Mattsen, RES W. Kane In rewlew
[
7 Sp Criteria for Nuclear x35910 x24354 i
% l4 facilities (Rule Amendments)
GE Standard 2/A 2/83 3/83 D. Eisenhut, NRR W. Kane In Tech. Specs.
427672 x24354 preparation,
051 A-12 (F racture 2/A 2/83 3/83 F. Schroeder, NRR M. Taylor In Toughness of SG A x27303 x24356 peeparation RCP Supports) Final NUREG 50.55a update 2/A 2/83 3/83 A. Taboada, RES W. Kane Resolving incl. Class 2 & 3 x35903 x24354 review comments y
3 Proposed Rule on 2/A 2/83 11/83 E. Herschoff, RES T. Cox In 7
Reactor Operator x35942 x24357 preparation
[
Qualifications I
Part 55
?, :
E Reg. Guide on 2/A 2/83 3/83 A. Hintze, RES.
W. 5ctwink Resolving
(
Installation of x35966 x24342 public comments Transducers s
Reg. Guide on 2/B 2/83 4/83 L. Hendricks, RE$
W. Schwink Resolving Q
Prenatal Exposure x35970 x24342 public comemnts g
1, N
Final Rule, fitness 2/A 2/83 3/83 T. Ryan, RES W. Schwink Resolving pob11c 2,
for Duty 10 CFR x35942 x24342 comments c
Part 50 x
j (4452 M-
+q:
nm -
l&j YE yq
t Date of
~
Subelttal Requested Contact 0(8000R Category /
for CRGR Completion Office &~
Centact &,
Item Title or Description Priority +
Consideration g
Telegatene
_Tvigsteeny Current Statq 43 USI A-1 (Water Hammer) 2/A 3/83 4/83
.F. Schroeder, NAS.
W.- Eens In Draft NUREG for Public x27303 284364
^ preparation Comment 44 Reg. Guide on Response 2/A 3/83 5/83
- 8. Lowls, NES W. 5ctwink Awaiting Time Testing of Prot.
x35006 metatt p elication System Instrument ChanneIs of IM.
atenderd 45_
Prcposed Rule to 2/8 3/83 4/83 J. Philipe, W W. $ctwink In Close Open Ended m27005-a84342 preparation Record Retention Requirenents 46 Revised Auxiliary 2/8 3/83 4/83 R. Mottaen. M M. Taylor In Feed Water System M27373 380956 preparation Acceptance Criteria 47 Palo Verde PRA for 2/8 3/83 4/83 R. M64 teen, M M. Taylor In ultimate Heat Sink m27373 x24356 preparation 48 Insider Rule Revision 2/A 3/43 4/83 A. Sermett.. M S W. Estmink in held pending i
.m24342 Safety / Safeguards Committee Report 49 SEP Phase III/NREP 2/A 3/83 4/83
- 9. Eisenhut, W M..Tay!er In preparetfoc.
x27672 mf4306 50 Reg. Guide on 2/A 4/83 6/83 R. Felt, MS M. Taylor In Endor5ing IEEE Std. x36965 x84306 preparatios on Criteria for Electrical Instrue.
& Control Portions of Safety Systees
D:to of Submittal Requested Contact.,
- 0EDROGR
- Category /
for CRGR.
Completion
' Office &
. Contact &-
tem Title or Description Priority +
Consideration Date Telephone Tele Current Status' 1
Diesel Generator 2/A 4/83 5/83 R. Mattsen, NRR W. Schwink.
In Reliability (B-56) x27373.-
x24342 preparation
$2 Mechanistic Fracture 2/8 5/83 6/83.
W. Johnston, NRA M. Taylor In Evaluation of Reactor X27331 X24356 preparation Coolant Piping-Leak B2 fore Break
>3 Adequacy of DC 2/A 5/83 6/83 R. Mattson, NRR W. Schwink In Power Supplies x27373 x2434_2 preparation Commission Paper 2/A 5/83 6/83 H. Thompson, NRR M. Taylor In x29595 preparation on Plant-Specific Sir.ulators
>5 Station Blackout 2/A 6/83 7/83 F. Schroeder, NRR M. Taylor In (USI A-44)
.x27g;-
preparation x2 EE 412-4 Diesel 2/8 6/83 7/83
- 8. Sullivan, RES W. Schwink To be x24342 prepared x39946 Gen _ Selection, 0: sign & Qualiff-cation Rev. to RG 1.9 h7 EE 050-2 2/8 6/83 7/83 A. Detta, RES M. Taylor To be x35946 x24356 prepared Cable Qualification, Rev, to RG 1.131:
EE 004-5 2/B 6/83 7/83 J. Vora, RES M. Taylor To be x35946 x24342 prepared connector Qualification
)9 50.55a update 2/A 6/83 7/83 A. Toboada, RES W. Kane In x35903 x24354 preparatio.
incl. ASME XI I
+
?
3
?
t
..m
Oste of Category /
for CRGR.
Completion Office &.
DEDROGR Subaittal Requested Centcet.
Contact &
43 IjtjeorDescription Prio ri.ty+
Consideration' Date Telephone Telephone.
Current _ Status i
Fiacture Toughness 2/A 6/83 7/83 P. N. Randall, RES M. Taylor To be during actidents x28075 M 8186-prepired (new regulation)
.. W iJ
..% E Reg Guide on 2/8 6/83 8/83 D. Boehm, RES W. Schwink In Criteria for Pro.
x35966 x24342 preparation
.granacble Digital Computer.5ystems in Safety Systems (G.1. A-19)
Mark III Containment 2/A 6/83 7/83 R. Mattson, NRR M. Taylor In LOCA-Related Hydro-x27373 x24356 preparation
. dynamic Load Definition i
USI A-40 (Seismic 2/A 7/83 8/83 F. Schroeder, NRR T. Cox In Design Criteria) x27303 x24357 preparation DrafL NUREG for Public Commeat GEIS.for High Burnup 2/B 7/83 8/83 R. Grill, RES T. Cox Commission x74666 x24357 Paper en Fue1 Petition is in preparatica
.Ctiapter 10 SRP 2/B 8/83 9/83 H. Thompson, NRR T. Cox In
-Revision x29595 x24357 preparation Reg. Guide 8.14, Rev. - 2/A 9/83 11/83 M. Federline, RES W. Schwink In Neutron Surveys and x35970 x24342 preparation Dosimetry Chapter 13.2.1 & /i1.7 2/8-9/83 10/83 H. Thomp5vn, NRR
- i. Cox in x35970 x24357 preparation j e.:
4
4 A-
+
c
.. c TJ
-g D3te of Substttal_
Requested
Contact:
DEDROGR Catagory/
for CRGR Completion Office &
Contact &~
t_em iitle or Descrir. ion Priority +
Consideration
.Date Telephone Telephone Currept status
- 0. Nuller, NRR
.M. Taylor IMef inite 3
--Generic tetter.
2/8
'Regarding Suomittal x24845 x24255 hold-
.(
of Environmental Protection. Plans R. Mattson, MRA
.M. Taylor.
In review i9 Reg. Guide 1.33 Loose-2/B Parts Datection Pro-x27373 x27303 gram for Primary System of LWRs.
R. Mattson.:NRR M. Taylor In 0
Interim Source Terms 2/A x27373 x27303 preparation P
F D. Guzy, RES W. Kane Resol-ing l1 Snubber Qualification 2/A x35860 x24354 oft 1ce/CRGE-Guide coments R. Seer, IE T. Cox In
- 2 Bulletin _- Inspection 2/A x24780
-x24357 preparation 13 of Steam Generator Secondaryd Side (Ginna 7
' Event) 8 M. Taylor Resolving R. Baer, IEL f3 Bulleti.n - ASCO 2/A x24700 x24356 CRGR comments Solenoid Valve.
?
b-k h
K k
ve q
LONG RANCE CRGR AGENDA.
DATE: :11-30-82'
~.'
(12-Month Period Beginning December 1, 1982 and Endian November 30,'1983)
Date of.
Subalttal Requested Contact DE000GR Category /
for CRGR Completion Office &-
Contact &
ten Title or Description
' Priority +
Consideration Date
' Telephone Telephone current Status NRC Administered
'2/A 12/82-1/83 H. Theapson, M T. Cox In' review Operator Requalifi-x29995 x24357 cation Exams Part'20, Standard for 2/A 12/82 1/83 R. Baker, RES W. Schwink In preparation Protection Against x74387 x24342
~
i CE Standard Tech Spec 2/A 12/82 1/83
~ D. Eisenhet, W W. Kane Ir. review x27672 x24364 i
Ch'ange to 10 CFR 2/8 12/82 1/83 W. Mills,'IE W. Kane In Part 50.72, NotifIca-x24791 x24354 preparation tion of Significant Events Check Valve 2/A 12/82 1/83 W. Mills, IE M. Taylor In Bulletin / Circular x24791 x24356 preparatico
.f,.
Reg. Guide-on Instru-2/A 12/82 1/83 A. Hintze, RES '
W. Schwink In-ment sensing Lines x35966 x24342 concurrence *%
Control of Secondary 2/B 12/82
'1/83 W. Johnston, NRR T. Cox In Water Chemistry-SRP x27331 x24357 preparation Revision RGR Categories:
Emergency; -1, requires resolution in 3 days; 2, allows 3 weeks fw CAGR consideration.
RGR Scheduling Priorities:
Where there are schedule conflicts, A First; 5 - Second; C - Third.
NW.
I
~
^
NTACT:
Walt Schwink (492-4342)~
C
..a_
.a-
p f
Date cf Substttal Requested
. Contact-DEDROGR Category /
for C4R-
. Completion-Office &.
- Contact'&
(tem. l Title' or Gescription Priority +
Consi Mration-Date.
Telqshens Teleoewne,.
Current _ Status, 4 -
' Revision to ECCS 28
'12/82
,1/83 M. Fleishman, M S M.' Taylor In review
' Rules - Phase I x38981
.x243M F
Revision 2 of Reg.
2/A 12/82 1/83 it. Kenneelly, itES M. Taylor Resolving
~ 35892 s243M
' review Guide 1.12 " Nuclear x
Power Plant Instru-comments mentation for Earthquake"
,0 Revision 1 of Reg.
2/A 12/82 1/83
- f. Norpster IE W.' Kane In Guide 1.33 QA-Prog.
x24774 x24354 preparation Rqmts. (Operations) il
. Revision 1 of Reg.
2/A 12/82 1/33 R. Nerna61ewicz, M. Taylor In Guide 1.23, Onsite llES x74394 x243M-preparation Meteorological Programs
,2 MPA - 871 120 Vac 2/A 12/82 1/83 D. Eisenhut. M M. Taylor In-Vital Instrument x27672 x243M preparation Buses and Invertor Tech. Specs.
i+
- 3 Reg. Guide 1.56, 2/A 12/82 1/83 C. Shulten. RES N. Taylor In review
" Maintenance of Water-x28482
. x24356' Purity in BWRs"
.4 Revision o'f Reg.
2/A 12/82 1/R D. Seehm, RES M. Taylor Resolving Guide 1.JOS, Instru -
x35866
' x24356 pubile.
ment Setpoints comments I
s
~
Date of.
Submittal Requested Contact!
DEDROGR Category /
for CAGR Completion 0ffice &
Contact.&
ten ' Title or Description Priority +
Consideration Date
' Telephone Telephone
. Current Statuj,. -
!S.
Notice of Proposed 2/A 12/82 1/83 J. Jenkins, RES M. Taylor
.. I n
'Ruiemaking Human x35942 x24356 preparation Fcctors General Design Criteria,.
10 CFR 50,-Appendix A L6 Proposed Amendment 2/C 12/82 1/83 E. Baker, RES T. Cox Sent to EDO
.to 10 CFR 50.55a x35982 x24357 incorporating the Suawr.er 1982 Addenda of the ASME Boiler and Pressure Vessel Code l7 Effective Rule 2/C
~12/82 1/83 E. Baker, RES T. Cox In Incorporating the x35982 x24357 concurrence Winter 1981 Addendum (Office of ASME Boiler and Director)
Pressure Vessel Ccde i
8 R:g. Guide 1.8,.Rev. - 2/A 12/83 4/84 E. Merschoff, RES T. Cox In-Personnel Selection i-x35942
- x24357 preparation and Training -
.9 Final LER Rule (Plus) 2/A
~ 12/82 1/83 F. Hebdon, AE00 W. Schwink Resolving Stctus.ReRort on x24489 x24342 50.72, 55.55(e) and Pcrt 21) 10-Qualification'of 2/A 1/83 2/83 J. Vora/
M. Taylor Reselving Electric Equipment
- 5. Aggerwal, RES x24342 public Important to Safety x35946 comments Rev. I to R.G. 1.89 I
b t
Oste of Submittal Requested Contact DEDROGR Category /
.for CRGR Completion 0ffice &,
Contact'&
Item Title or Description Priority +
Consideration Date Telephone
' Telephone Current Status 21 fire Stop-
-2/8 1/83 2/83 A. Detta, RES T. Cox In Qualification x35946 x24357
. preparation 22 Steam Generator 2/A 1/83 2/83 D. Eisenhet, NRR.
W. Kane In.
3 Generic Requirements x27672 x24354 preparatico 23 Reg. Guide 1.13, 2/A 1/83 2/83 C. Schulten, RES W. Schwink In review.
" Spent Fuel Storage Facility Design Basis" x28482 x24342 74 Post-CP Change Rule 2/8 1/83 2/83 A. Dipalo, RES T.'Cox'
-In review x35981 x24357 25 Regulatory Guide on 2/A 1/83 2/83 H. Graves. RES W. Kane
'In review Anchoring Components x35982 x24354 and Structural Supports in Concrete (MS 129-4) t6 10 CFR 50, Appendix J 2/A 1/83 2/83 G. Arndt, RES M. Taylor Preparing FRH General Revision x35860 x24356-statement of consideration pf Revision of Reg.
2/A 1/63 3/83 T.-Harpster, IE T. Cox In review Guide 1.94, QA Prog.
x24774 x24357 Rqmts. for Install.,
Inspect., & Testing of Structural Concrete ir Alternative Site Rule 2/8 1/83 2/83 P. Hayes, RES M. Taylor In x74318 x24356 preparation l
s i
n
-/
V 1-
' Subelttal Requestcd Contact' DES 40GR Category /
for CRGR Completion
.0ffice &
Contact &-
tem htte or Description Priori ty+
Consideration Date; Telephone Telephone Current Status 9
Revision '~of Reg.
' 2/A' 1/83.
2/83 H. Asher',:MS T.-Cox Resolving 3
Guidet1;35, 151 of
.x35892 x24357 public-ungrouted tendons in ccaments prestressed con-crete containments O
Reg. Guide 1.35.1 2/A-1/83 2/83 H. Asher, Aos-T..Cox.
Resolving Determining Pre-x35032 x24357 p elic ra==ents stressing forces for ISI of Pre-stressed concrete containments 1
Revision of Reg.
2/A 1/83
~ 2/83 T. ~ Navyster IE W. Kane Ir.
Guide 1.28, QA-x24774 x24M4 preparation Prog. Rgats (Design-
& Construction) e 10 CFR 50.55(e) &
2/A
-1/83 2/83 F. X. Cameren, RES W. Nano
'In 10 CFR Part 21 x39BS1 m24354 preparation reporting of defects
. & noncompliance h
Final-Rule,'Trans-2/A 1/83 2/83 D. Nepkins, MS W. $ctasink In portation of Radio-xMM5 x24M2 concurrence active material compatibility with IA&A Regulations, 10 CFR Part 71 final Rule.on-2/A 2/83 3/83 M. Fleishmen, MS M. Taylor Final Draft Hydrogen Control x39901 x24356 in preparation 10 CFR Part 50.44(c)
I g
y 4_,
A s t's-'
- 4 1
"*d'
Dcto of,
~
Subalttal Requested Contact DECROGR.
Category /
for CRGR Completion. Office &
Contact &
2 Title or Gescription Priority +
Consideration Date Telephone.
-Telephone Current Status
~
Decommissioning 2/A 2/83 3/83 C. Mattsen. RES W. Kane In review Criteria for Nuclear x35010 x24354 facilities (Rule kr.codments)
~
GE Standard 2/A 2/83 3/83
- 0. Eisenhet, MAR
. W. Kane In Tech. Specs.
x27672 x24354 preparation USI A-12 (Fracture 2/A 2/83 3/83 F. Schroeder. NRR M. Taylor in Toughness of SG &
x27303 x24356 preparation RCP supports) Final NUREG
$0.55a update 2/A 2/83 3/83 A. Tabeeds. RES W. Kane Resolving incl. Class 2 & 3 x35903 x24354 review ceaments Proposed Rule on 2/A 2/83 11/83 E. Merschoff, RES T. Cox In Reactor Operator x35942 x24357 preparation Qualifications a
Part 55 Reg. Guide on 2/A 2/83 3/83 A. Hintze, RES.
W. Schwink Resolving Installation of x35986 x24342 pubife Transducers ccaments Reg. Guide on 2/8 2/83 4/83 L. Hendricks, RES W. Schwink Resolving Prenatal Exposure x35970 x24342 public comments Final Rule, Fitness 2/A 2/83 3/33 T. Ryan, RES W. Schwink.
Resolving pubite for Duty 10 CFR x35942 x24342 consents Part 50 I
Dato of submittal R: quested Contact SE840GR Category /
for CRGR Completion-Office &
~ Contact &
em Title or Description Priority +
Consideration Date Telephone Telephone Current Status U51 A-1 (Water Hammer) 2/A 3/83 4/83 F. Schreenier, MAR W.' Xane In Draf t fiUREG for Public x27303-x24354 preparation Coment
)
Reg. Guide on Response 2/A 3/83 5/83 G. Lewis, NES W. Schwfak Awaiting-J Time Testing of-Prot.
x35956 m24342 p$1icat(en System Instrument Channels of ISA standard Proposed Rule to 2/B 3/83 4/83 J. Philips, ASM W. Schwink In i
Close Open Ended x27006 x24342 preparation Record Retentioi1 Requirements Revised Auxiliary 2/8 3/83 4/83 R. Mattseh, m M. Taylor In Feed Water System x27373 x24356 preparation.
Acceptance Criteria Palo Verde PRA for 2/8 3/83 4/83 R. Mattson. MM M. Tayisr In Ultimate Heat Sink x27373 x24366 preparation Insider Rule Revision 2/A 3/83 4/83 R. Burnett,1955 W. Schwink In held pending 5
to 10 CFR Part 73 x24342 Safety / Safeguards Ceamittee Report SEP Phase III/NREP 2/A 3/83 4/83 D. Eisenhut,NAR M. Taylor In preparation x27672 x24356 Reg. Guide on 2/A 4/83 6/83 R.-Feit, RES M. Taylor In Endorsing IEEE Std. x35966 x24356 preparation on Criteria for Electrical Instrum.
& Control Portions of Sofety Systems l
l
[
y~
~
^
~
- Date of
.e
~
Submittel
_ Requested
}Contacti DED40GR.
Category /
- for CAGR
- Completion ;0ffice 4;
. Contact &
L D' Current Statsi
,g Tit.ie or 0escription Priority +
consideration Date '
'M Triophone
. G
.Diese1 Generator.
2/A 4/83
.5/83 Rl. Mattson, ISR
-W. Schwick-In RH iability (B-56)
- 27373 x24342-preparation o
" : Mechanistic Fracture 2/8 5/83 6/83-W. Jessisten, ISR' N.. Taylor In Evaluation of Reactor X27331 Xf4356 preparation Cooiant Piping-Leak Before Break
^
Adequacy of.DC' 2/A-5/83
~
6/83 R. Mattsen IMIt W. Schwink.
In-Power Supplies x273731 x24342 preparation
~
Commission Paper ~
2/A
$/83 6/83 N. Theepsen, NRR' N. Taylor In.
on Plant-Spectfic x29695 preparation
' Simulators Station Blackout 2/A 6/83 7/83 F. Schroeder. HRk M. Taylor In (USI A-44) x2g g{g preparaticro EE 412'-4 Diesel-2/8 6/83 7/83-D. Sellivan, MS
.W. 5ctiwink To be Gen. Selection, x35M6 i
x24342 prepared L0esign &'Qualift-
< cation Rev. to AG 1.9 i.-
-EE-050-2 '
2/8 6/83 7/83 A. Detta,.RES N. Taylor-To be Cable Qualification, x35M6 x24356 prepared Rev, to RG 1.131
'EE 004-5 2/B 6/83 7/83
- J. Vora, RES M. Taylor To be Connector x39946 x24342 prepared
_ Qual i fi. cation 50.55a update 2/A 6/83 7/83
.A. Tobcada, MS W. Kane In incl; ASME'.XI
-x35903 x24354 preparation
[
.}
G jg p
L_ j '
0:ta of Submittal Reque sted Contact DEDROGR Category /
for CRGR Completion Office &
Contact &
I tem. Title or Description.
Priority +
Consideration Date Telephone Telephone
, Current Status ;
'60 Fracture Toughness 2/A 6/83 7/83 P. N. Randall, RES M. Taylor To be during accidents x28075 x28186-prepared (new regulation)
N/f4 s.Joji, <
61 Reg. Guide on 2/8' 6/83 8/83 D. Boehr, RES W. Schwink In Criteria for Pro-x35966 x24342 preparation grammable Digital h
Computer Systems in Safety Systems (G.1. A-19) 62 Mark III Containment 2/A 6/83 7/83
, R. Mattson, NRR M. Taylor in LOCA-Related Hydro-x27373 x24356 preparation dynamic Load Definition
,63 USI A-40 (Seismic 2/A 7/83 8/83 F. Schroeder, NRR T. Cox In, Design Criteria) x27303 x24357 preparation Draft NUREG for Public Coment i
64 GEIS for High Burnup 2/8 7/83 8/83 R. Grill, RES T. Cox Commission x74666 x24357 Paper on Fuel Petition is in preparation ChapterId.SRP 2/8 8/81 9/83 H. Thompson, NRR T. Cox In 65 R; vision x29595 x24357 preparation 66 R:9. Guide 8.14, Rev. - 2/A 9/83 11/83 M. Federline, RES W. Schwink In Neutron Surveys and x35970 x24347 preparation Dosimetry 67 Chapter 13.2.1 & If.1.2 2/B 9/83 10/83 H. Thompson, NRR T. Cox In x35970 -
x24357 preparation g
. ?: *l3
}
L
Q s.
Dato et
r
- Subaittal Requested
~ Contact
- DEDROGR ~
Category /
for CRGR Completion Office &
Coni.act &
,.e
'I t_em Title or Description Priority +
Consideration.
Date Telephone Telephpne Current Statsrs_ c
D..Muiler, NAR M. Tayisr Indefinite 68 Generic Letter 2/B s
Regarding Subeittal x24M5 x24256 hold of Environmental Protection' Plans R. Mattson, MAR M. Taylor In review d
69 Reg. Guide l.33 Loose- :2/8 Parts Detection Pro-x27373 x27383 i
gram for Primary System of LWRs R. Matteen, NAR M. Taylor In 70 Interim Source Terms 2/A x27373 x27303 preparation
- 9. Guay, RES W. Kane Resolving 71 Snubber Qualification 2/A Guide xM000 m24354 0ffIce/CRGR coerents R. Beer,.IE T. Cox
-In 72 Bulletin - Inspection 2/A-of Steam Generator
' xM700 ~
x24357 preparation Secondaryd Side (Ginna Event) 1 M. Taylor Resolving-R. Beer, IE 73 Bulletin - ASCO 2/A Solenoid Valve x24700 x24356 CRGR comments O
I t
G. h._ -
i.
_ _ _ _ _ _ _