ML20022A336
| ML20022A336 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 08/31/2020 |
| From: | Joel Wiebe Plant Licensing Branch III |
| To: | Bryan Hanson Exelon Generation Co |
| Wiebe J | |
| References | |
| EPID L-2019-LLE-0022 | |
| Download: ML20022A336 (3) | |
Text
August 31, 2020 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2, EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.61 AND 10 CFR 50, APPENDIX G (EPID L-2019-LLE-0022)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission has approved the enclosed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.61, Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events, and 10 CFR Part 50, Appendix G, Fracture Toughness Requirements, for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2. This action is in response to your application dated September 30, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19275E307), that requested an exemption from these requirements to allow use of an alternative methodology to determine reactor coolant system pressure-temperature limits. The new methodology is described in AREVA NP Topical Report BAW-2308, Revisions 1-A and 2-A, Initial RTNDT of Linde 80 Weld Materials (ADAMS Accession No. ML032380449 and ML081270388).
A copy of the exemption is enclosed. The exemption has been forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457 STN 50-454 and STN 50-455
Enclosure:
Exemption cc: Listserv
LTR: ML20022A336 EXMPT: ML20022A330 FRN: ML20022A323
- vis e-mail OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DNRL/NVIB/BC NAME JWiebe SRohrer HGonzalez*
DATE 8 / 25 /2020 1 / 27 /2020 4/ 20 /2020 OFFICE OGC NRR/DORL/LPL3/BC NRR/DORL/DD NAME STurk/NLO*
NSalgado RFK*, for CErlanger GFS for, DATE 2 /13 /2020 7 / 8 /2020 8/31/2020 OFFICE NRR/DORL/LPL3/PM NAME JWiebe DATE 8/31 /2020
ENCLOSURE EXEMPTION