Forwards Insp Repts 50-313/90-05 & 50-368/90-05 on 900201- 0315 & Notice of Violation.Violation Re Failure to Perform Tech Spec Surveillance on Containment Airlocks Is Repeat Violation
ML20012F472
Person / Time
Site: Arkansas Nuclear  
Issue date: 04/05/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20012F473 List:
References
NUDOCS 9004130247
Download: ML20012F472 (3)


See also: IR 05000313/1990005

Text

_

, < . [,

NR

5W

-

l

In Reply Refer To:

Dockets: 50-313/90-05

50-368/90-05

Arkansas Power & Light Company

ATTN: Mr. N. S. Carns,

Vice President Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

,

Gentlemen:

This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag

of this office during the period February 1 through March 15, 1990, of

activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas

Nuclear One, Units 1 and 2, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included followup on pmviously identified

items, followup of events, operational safety verification, surveillance,

!

maintenance, and in-office review of licensee reports.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

The

findings are documented in the enclosed inspection report.

l

During this inspection, it was found that one of your activities was in

j

violation of NRC requirements. Although we recoginize that the violation

.l

was identified and reported by your staff, it is a repeat of a continued

i

I

pattern of the failure to perfom surveillance tests within the required time

i

L

interval for which your corrective actions, to date, have not precluded

,

I

recurrence. Consequently, you are being cited in accordance with

j

paragraph V.G.I.e. Appendix C, Part 2. Title 10. Code of federal Regulation,

'

and you are required to respond to this violation, in writing, in accordance .

,

l

with the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

i

Title 10 Code of Federal Regulations. Your response should be based on the

,

spet.ifics contained in the Notice of Violation (Notice) enclosed with this

l

letter.

l

In addition, during the upcoming quarterly performance meeting scheduled for

t

April 26, 1990, you are requested to discuss the actions you have taken to

!

improve your surveillance test program controls. Also, because of the pattern

j

of recent problems with equipment controls, such as the failure to tag-out a

j

diesel generator prior to commencing maintenance, you are requested to discuss,

l

during the meeting, your equipment control program and the improvements in

!

controls that you have made or plan to make.

j

h

  • RIV:RI
  • DRP/A
  • C:DRP/A

D

RCHaag

CCWarren

RPMullikin

TFWesterman

5

ins

\\

l

0

4/ /90

4/ /90

4/ /90

4/ /90

> /S /90

f'

)

l

  • previously concurred

h [l

g

ggg5 _

ADOCK0500g3

i

FDR

. _ _ .

_

.-

.

--

.

i

a

O

.

.

.

,

h

Arkansas Power & t.ight Company

2--

.t

!

We have also examined actions you have taken with regard to previously

'

'

identified inspection findings.

The status of these items is identified in

Section 3.0 of the enclosed report.

,

Should you have any questions concerning this inspection, we will be

I

pleased to discuss them with you.

)

!

Sincerely.

'

OriginalShned By:

!

Samuel J. Collins

Samuel J. Collins, Director

Division of Reactor Projects

!

!

L"ck ;ures

1.

Appendix A - Notice of Violation

!

2.

Appendix B - NRC Inspection Report

!

50-313/90-05

!

50-368/90-05

l

,

cc w/ enclosures:

l

Arkansas Nuclear One

'

ATTN:

Early Ewing, General Manager

j

Technical Support and Asressment

i

P.O. Box 608

l

Russellville Arkansas 72801

!

Arkansas Nuclear One

!

ATTN: Jerry Yelverton, Director

Nuclear Operations

!

P.O. Box 608

,

Russellville, Arkansas 72801

[

t

Combustion Engineering, Inc.

!

ATTN: Charles B. Brinkman, Manager

j

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

i

Rockville, Maryland 20852

i

e

Honorable Joe W. Phillips

!

County Judge of Pope County

!

Pope County Courthouse

l

Russellville, Arkansas 72801

'

Bishop Cook, Purcell & Reynolds

ATTN:

Nicholas S. Reynolds. Esq.

j

1400 L Street, N.W.

Washington, D.C.

20005-3502

'

i

t

!

l

.

--

.. \\

i

,

l,

.-

-

.

i

)

Arkansas Power & Light Company

-3-

'

>

!

Arkansas Department of Health

,

ATTN: Ms. Greta Dieus Director

"

Division of Environmental Health

Protection

4815 West Markam Street

!

Little Rock, Arkansas 72201

Babcock & Wilcox

!

Nuclear Power Generation Division

ATTN

Mr. Robert B. Borsum

i

1700 kockville Pike Suite 525

.

.

'

Rockville Maryland 20852

I

U.S. Nuclear Regulatory Commission

ATTN

Senior Resident inspector

i

1 Nuclear Plant Road

'

Russellville, Arkansas 72801

l

U.S. Nuclear Regulatory Connission

ATTN: Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 2000

l

Arlington, Texas 76011

j,

bectoDMB(IE01)

i

bec distrib. by RIV:

  • R. D. Martin
  • Resident Inspector
  • DRSS-FRPS
  • SectionChief(DRP/A)

.

,

Lisa Shea, RM/ALF

  • RIY File

.

  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer (DRP/A)

!

'

  • T. Alexion NRR Project Manager (MS: 13-E21))
  • DRS
  • C, Poslusny, NRR Project Manager (MS:

13-D-18

[

  • w/766

.

i

i

!

'

!

!

!

l

l

!

!

i

t

l

5

i

.

,-

,

--