Text
_
, < . [,
NR
5W
-
l
In Reply Refer To:
Dockets: 50-313/90-05
50-368/90-05
Arkansas Power & Light Company
ATTN: Mr. N. S. Carns,
Vice President Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
,
Gentlemen:
This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag
of this office during the period February 1 through March 15, 1990, of
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas
Nuclear One, Units 1 and 2, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included followup on pmviously identified
items, followup of events, operational safety verification, surveillance,
!
maintenance, and in-office review of licensee reports.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
The
findings are documented in the enclosed inspection report.
l
During this inspection, it was found that one of your activities was in
j
violation of NRC requirements. Although we recoginize that the violation
.l
was identified and reported by your staff, it is a repeat of a continued
i
I
pattern of the failure to perfom surveillance tests within the required time
i
L
interval for which your corrective actions, to date, have not precluded
,
I
recurrence. Consequently, you are being cited in accordance with
j
paragraph V.G.I.e. Appendix C, Part 2. Title 10. Code of federal Regulation,
'
and you are required to respond to this violation, in writing, in accordance .
,
l
with the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
i
Title 10 Code of Federal Regulations. Your response should be based on the
,
spet.ifics contained in the Notice of Violation (Notice) enclosed with this
l
letter.
l
In addition, during the upcoming quarterly performance meeting scheduled for
t
April 26, 1990, you are requested to discuss the actions you have taken to
!
improve your surveillance test program controls. Also, because of the pattern
j
of recent problems with equipment controls, such as the failure to tag-out a
j
diesel generator prior to commencing maintenance, you are requested to discuss,
l
during the meeting, your equipment control program and the improvements in
!
controls that you have made or plan to make.
j
h
- RIV:RI
- DRP/A
- C:DRP/A
D
RCHaag
CCWarren
RPMullikin
TFWesterman
5
ins
\\
l
0
4/ /90
4/ /90
4/ /90
4/ /90
> /S /90
f'
)
l
- previously concurred
h [l
g
ggg5 _
ADOCK0500g3
i
FDR
. _ _ .
_
.-
.
--
.
i
a
O
.
.
.
,
h
Arkansas Power & t.ight Company
2--
.t
!
We have also examined actions you have taken with regard to previously
'
'
identified inspection findings.
The status of these items is identified in
Section 3.0 of the enclosed report.
,
Should you have any questions concerning this inspection, we will be
I
pleased to discuss them with you.
)
!
Sincerely.
'
OriginalShned By:
!
Samuel J. Collins
Samuel J. Collins, Director
Division of Reactor Projects
!
!
L"ck ;ures
1.
Appendix A - Notice of Violation
!
2.
Appendix B - NRC Inspection Report
!
50-313/90-05
!
50-368/90-05
l
,
cc w/ enclosures:
l
Arkansas Nuclear One
'
ATTN:
Early Ewing, General Manager
j
Technical Support and Asressment
i
P.O. Box 608
l
Russellville Arkansas 72801
!
Arkansas Nuclear One
!
ATTN: Jerry Yelverton, Director
Nuclear Operations
!
P.O. Box 608
,
Russellville, Arkansas 72801
[
t
Combustion Engineering, Inc.
!
ATTN: Charles B. Brinkman, Manager
j
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
i
Rockville, Maryland 20852
i
e
Honorable Joe W. Phillips
!
County Judge of Pope County
!
Pope County Courthouse
l
Russellville, Arkansas 72801
'
Bishop Cook, Purcell & Reynolds
ATTN:
Nicholas S. Reynolds. Esq.
j
1400 L Street, N.W.
Washington, D.C.
20005-3502
'
i
t
!
l
.
--
.. \\
i
,
l,
.-
-
.
i
)
Arkansas Power & Light Company
-3-
'
>
!
,
ATTN: Ms. Greta Dieus Director
"
Division of Environmental Health
Protection
4815 West Markam Street
!
Little Rock, Arkansas 72201
Babcock & Wilcox
!
Nuclear Power Generation Division
ATTN
Mr. Robert B. Borsum
i
1700 kockville Pike Suite 525
.
.
'
Rockville Maryland 20852
I
U.S. Nuclear Regulatory Commission
ATTN
Senior Resident inspector
i
1 Nuclear Plant Road
'
Russellville, Arkansas 72801
l
U.S. Nuclear Regulatory Connission
ATTN: Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 2000
l
Arlington, Texas 76011
j,
bectoDMB(IE01)
i
bec distrib. by RIV:
- R. D. Martin
- Resident Inspector
- DRSS-FRPS
- SectionChief(DRP/A)
.
,
Lisa Shea, RM/ALF
- RIY File
.
- DRP
- MIS System
- RSTS Operator
- Project Engineer (DRP/A)
!
'
- T. Alexion NRR Project Manager (MS: 13-E21))
- DRS
- C, Poslusny, NRR Project Manager (MS:
13-D-18
[
- w/766
.
i
i
!
'
!
!
!
l
l
!
!
i
t
l
5
i
.
,-
,
--