- e
3e
o
,
.
In Reply Refer To:
gg 26 W
Docket:
$0-285/90 06
Omaha Pub)ic Power District
ATIN:
W. G. Gates, Division Manager
Nuclear Operations
444 South 16th Street Mall
Omaha, Nebraska 68102-2247
Gentlemen:
This refers to the inspection conducted by Mr. W. M. McNeill of this office
during the period February 5-9, 14-16 and February 26 through March 2, 1990, of
activities authorized by NRC Operating License DPR-40 for the Fort Calhoun
Station, and to the discussion of our findings with you and other members of
your staff at the conclusion of the inspection.
The area examined during the inspection was self-assessment capability. Within
this area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspector.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that the Safety Audit and Review Committe
had not reviewed recent plant modifications and their associated safety
evaluations.
However, in accordance with Section V.G,1 of the NRC's Enforcement
,
Policy, no citation is being issued for the violation described in
paragraph 3.1 of the enclosed inspection report.
Also during this inspection,
it was found that you were not in full compliance with standing order
requirements with respect to entry of Plant Review Committee (PRC) action items
into the station commitment tracking system, and submittal of the results of
l
reviews by a PRC subcommittee to the PRC for approval. However, in accordance
'
with Section V. A. of the NRC's Enforcement Policy, no citation is being issued
l
for these two violations described in paragraph 3.2 of the enclosed inspection
I
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
j
paragraph 2 of the enclosed report.
/D
RIV:RI:MQPS g
C:MQPS
4DR$
D: n
g
WMcNe111:nh
IBarnes
JCa lan
$J
' ins
'
3/to/90
3 /ao/90
g 90
gg/90
90o4o9oo88 900326
AoochoSGog.
1 }
.fLM
o
o
,
,
,
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we wi)) be pleased to
discuss them with you.
Sincerely,
OngnMiM U
somet J. comm
Samuel J. Collins, Director
Division of Reactor Projects
Ent 6 isure:
Appendix B - NRC Inspection Report
50-285/90-06
cc w/ enclosure:
LeBoeuf, Lamb, Leiby & M6cRae
ATTN:
Harry H. Voigt. Esq.
1333 New Hampshire Avenue, NW
Wtshington
0.C.
20036
Washington County Board
of Supervisors
ATTN: Jack Jensen, Chairman
Blair, Nebraska 68008
Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, MD 20852
Department of Health
ATTN:
Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509
Fort Calhoun Station
ATTN:
G. R. Peterson, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
U.S. Nuclear Pegulatory Commission
ATTN:
Resident inspector
P.O. Box 309
Fort Calhoun, Nebraska 68023
1
o
.
.
,
.
Dmaha Public P0wer District
-3-
U.S. Nuclear Regulatory Commission
ATTN: Re' tone) Administrator, Region IV
611 Ryan liara Drive $wite 2000
Arlington, Texas 76011
bectoDMB(IE01)
bec distrib. by RIV:
'R. D. Martin
' Resident Inspector
'DR$$-FRP$
'Section Chief (DRP/B)
' MIS System
- RIV File
'DRP
'RST$ Dperator
' Project Engineer (DRP/B)
Lisa $hea, RM/ALF
'DR$
- A. Bournia, NRR Project Manager (MS:
13 D-18)
- !
Barnes
'W. McNeill
'w/766
_