Responds to to Hj Miller,Informing of Status of Review of Leak Testing Performed at Plant.Changes in Revised Rept Were Editorial & Did Not Delay Review of Issues
ML20012E878
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/23/1990
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Gillmor P
HOUSE OF REP.
Shared Package
ML20012E879 List:
References
NUDOCS 9004060491
Download: ML20012E878 (7)


Text

-

t

%\\.

unnisostAres NUCLE AR CEGULATORY COMM68860N

  • /

q i

naonesioevow.o. c. ssma 6 I

GAR tI #

I i

i I

The Honorable Paul E. Gillmor United States House of Representatives Washington, D.C.

20516 i

Dear Congressman Gillmor j

1990, to Hubert J. Miller, to

! am responding to your letter of February 26, leak testin1 perfomed by inform you of the ctatus of our review of the H.A.F.A. International, Inc., at the Davis Besse Nuclear i>ower Station. To review allegations concerning acoustic leak testing perfomed by H.A.F.A. at i

these nuclear power plants, the NRC staff conducted an inspection at Davis.

Besse, three other nuclear power plants, and at the H.A.F.A. facility. The NRC

{

staff had approved the H.A.F.A. leak testing method in a letter dated November j

7,1985, that accepted H.A.F. A. Topical Re> ort HAFA 136(P). The results of the inspections at the nuclear plants and at tge H.A.F.A. facility substantiated some of the allegations and led the staff to question the implementation of the H.A.F.A. leak testing procedure at the nuclear power plants and to question the validity of the test method itself. The NRC informed the Toledo Edison Company 1989 that the staff considered the testing per.

byletterdatedNovember2,fofYoledoEdisonCompanytobeinvalid.

By letter formed by H.A.F.A. on behal dated December 8, 1989, the staff sent the findings of the inspections to the Toledo Edison Company. The Toledo Edison Company was cited for a violation from the results of the inspection. The Toledo Edisori Comp >ny has responded to our letter and inspection repo'rt. Their response it under reytow.

At the cone.lusion of the staff's September 1989 inspection at the H.A.F.A.

facility, the NRC staff informed H.A.F.A. of the concerns stated in the preceding paragraph. By letter dated December 21, 1989, H.A.F.A. was formally notified of the staff's concerns with their testing and was requested to respond in writing within 30 days.

H.A.F.A. requested to schedule a meeting witi the staff before they would submit a written response. The staff held the l

mceting with H.A.F.A. on February 1, 1990.

In this meeting H. A.F.A. comitted I

to respond to our letter of December 21, 1989, and to revise their topical l

report by March 19, 1990. The staff was informed by telecon on March 8, 1990, I

that H. A.F. A. would respond to our letter by March 19, 1990, but would not provide the revised topical report until March 26, 1990. Upon receipt of the l

revised topical report from H.A.F.A., the NRC will provide a timely review of i

l this report and of the H.A.F.A. response to our letter.

I l

1h

'8R98suLB83$h6 l

gg(g L

m

f, p

The Monorable Paul E. Gillmor,

At the meeting on February 1,1990, the staff discovered that after the staff l

I approved the topical report, H.A.F.A. retyped and reissued the report to the

[

staff. The changes in the revised report were editorial with the exception of l

one change that increased the number of types of pressure testing that could be t

L performed using the H. A.F.A. leak test metiod. Any differences between the reports were negligible and have not delayed the review of this issue.

I trust this reply satisfies the concerns expressed in your request.

I will l

inform you when this issue is resolved.

Sincerely, i

Origir.el Signd Up 1

hmes M.T0 0f James M. Taylor Executive Director for Operations j

t DISTRIBUTION' CLN1 MAL FILE GMizuno, OGC i

EMCB RF OCA DET RF SECY EDO - GT5214 TWambach RHermann HMiller, RIII CYCheng 0Danielson, RIII i

JRichardson DMossburg GT5214 FMiraglia CPaul 90-6 r

TMurley/JSniezek EDO RF

[

JPartlew JTaylor

[

DCrutchfield BHayes FGillespie PDR i

l i

  • SEE PREVIOUS CONCURRENCE i
  • DET:EMCB
  • DET:ENCB
  • DET:D
  • NRR:ADT
  • 01:D
  • NRR:D i

RHermann CYCheng JRichardson FMiraglia BHayes TMurley 3/12/90 3/12/90 3/13/90 3/14/90 3/15/90 3/16/90 t

(

OCA 8 i

E4} jkr DRathburt.

JT 3/ g/90 3/.Q/90 t

- s

/

l

[

o' I

The Honorable Paul E. Gillmor,

r L

/

At the inecting on February 1,1990 the staff discovered that its copy of the H.A.F. A. topical report was the original copy of the report that was used to evaluate and subsequently approve the test method. After the staff approved the topical report, H.A.F.A. retyped and reissued the report to the staff.

Apparently, the staff had not received a copy of the retyped report. The changet in the revised report were (titorial with the exception of one change that increased the number of types of pressure testing that could be performed using the H. A.F. A. leak test inethod. Any differences between the reports were negligibleandhavenotdelayedthereviewofthisissue./

i I trust this reply satisfies the concerns expressed in,y'our request.

I will inform you when this issue is resolved.

/

l Sincerely, l

James M. Taylor Executive Director f d Operations l

DISTRIE,UTION.

CENTRAL FILI GHiruro, GC i

EMCB RF OCA DET Rf SECY EDO - G15214 TWarnb6ch t

RHermann HMiller, R!ll i

CYCheng DDa'nielson, Rill JRichardson DHossburg GT5214 FHiraglia

'CPaul 90-6 l

TNurley/JSnierek EDO RF JPartlow JTaylor DCrutchfield BHeyes

\\.

f

@yY.-

FGillespie PDR t

  • SEEPREV10p$ CONCURRENCE h

'DET:EMCB /

  • DET:EMCB

'DET:D

  • NRR:ADT
D 1

aye k ly RHermannytsp CYCheng JRichardson FMiraglia

/g/

5

/90 J/)

/90 3/12 /9 3/12 /90 3/13 /90 3/14 /90 EDO /

OCA JTaylor DRathbun l

3/

/90 3/

/90 b

g The Honorable Paul E. Gillmor i I trust this reply satisfies the concerns expressed in your request.

I will inferin you when this issue is resolved.

Sincerely, l

1 i

James M. Taylor Executive Director for Operations

(

DISTRIBUTIO_N:

CENTRAL FILE GMizurio. OGC EMCB RF OCA DET RT SECY EDO - GT5214 Th'ambach RHermann HMiller, R!ll CYCheng DDanielson/RIII JRichardson DMossburg/GT5214 TMiraglia CPaul 9046 TNurley/J$niezek rg,% @

JPartlow h\\ d*

DCrutchfield FGillespie Sf, 4

  • SEE PREVIOUS CONCURRE CE
  • DET:EMCB
  • DET:EMCB
  • DET:D flRR:D RHermann: csp CYChi JRichardson I

ia TMurley 3/12 /90 3//ng/90 3/13 /90 3

' 90 3/

/90 EDO A

i JTaylor Rathbun l.

3/

/90

/3/

/90 1

l l

1 l

r l

I Congressman Gillmor -

7

,/

l

/

I trust this reply satisfies the concerns expressed in your request.

1 w111 inform you when this issue is resolved.

7

/

Sincerely,

/

/

/

James M. Taylor r

Executive Director i

for Operations

,/

/

(

t

)

.4 DISTRIBUTION:

CENTRAL FILI GMizuro,/OGC

}

EMCB RF OCA i

DET RF SECY EDO - GT5214 TWarnba'ch i

RHermann HMiller, RIII CYCheng DD6nielson, Rill JRichardson

,DHossburg GT5214 FMiraglia

'CPaul 90-6 TMurley/JSnierek JPartlow i

DCrutchfield

/

FGillespie

/

i

/

i

  • SEE PREVIOVS CONCURRENCE
  • DET:EMCB/
  • DET:EMCB
  • DET:

NRR:A0T HRR:D RHermann3 csp CYCheng ORicha son FMiraglia TMurley i

3/12 /9 3/12 /90 3/13 / 0 3/

/90 3/

/90 EDO OCA JTraylor DRathbun 3// /90 3/

/90

./

i i

i' I

[

Congressman Gillner /

/

i I will inform yoy/

1 trust this reply responds to your request.

when this issue is resolved.

/

/

L Sincerely.

Janes M. Taylor Executive Dirgetor for Operat ons l

I DISTRIBUTION:

Oth1RAL FILE CMizuno 000 EMCB RF OCA DE1 RF SECY EDO - GT5214 TWan6ach RHermann HMi/ler, Rill CYCheng 0Danielson, R111 JRichardson DPfossburg GTS214 FMiraglia

' Paul 90-6 TMurley/J$niezek JPartlow DCrutchfield FG111espie l

0k DET:E

,3 DET:D HER:ADT NRR:D ermann: csp CYCherg JRicha son FMiraglia TMurley 4

3/t t/90 3/ ( v/93 3/1$/ 0 3/

/90 3/

/90 EDO OCA JTaylor DRathbun 3/

3/

/90

f i

s 'l%

P, b

e'/'g##8Sg\\

UNITED $ TATE S l:

,;['

  1. p(

NUCLEAR REGULATORY COMMIS$lON l

4 waswsNGTON,0. c. tnu i

J

%*****/

[

EDO Principal Correspondence Control FROM:.

DUE: 03/21/90 EDD CONTROL: 0006214 r

DOC DT 02/26/90 FINAL REPLY:

Rep. Paul E. Gillmor TO:

H.J. Miller. RIII FOR $1GNATURE OF:

j i

Ex cutive Director DESC:

ROUTING:

CEOUEST THOROUGH EVALUATION OF A TOPICAL REPORT Davis, RIII ON ACOUSTIC LEAK TESTING METHODS DEVELOPED BY OCA H.A.F.A.

INTERNATION, INC. WHICH INVOLVES SECY TCLEDO EDISON'S DAVIS-BESSE NUCLEAR POWER PLANT DATE: 03/06/90 ASSIGNED TO:.

CONTACT:

NRR Murley SPECIAL INSTRUCTIONS OR REMARKS:

NRR RECEIVED: MARCH 6, 1990 i

ACTION:

pDET: RICHARDSON *

(

r NRR ROUTING:

MURLEY/SNIEZEK MIRAGLIA PARTLOW CRUTCHFIELD GILLESPIE ACTION MOSSBURG DUE TO NRR DIRECTOR'-

BY dh6 /9 o

(

l i

I f

(

i L