Advises That HXs for Safety Injection & Centrifugal Charging Pump Oil Coolers Will Not Be Replaced During 1990 Outage,But Will Be Replaced During 1991 Refueling Outage Due to Delays in Procurement Process
ML20012E794
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/30/1990
From: Walt T
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004060305
Download: ML20012E794 (1)


Text

.

3 N M BBC$dC QlN15M1)f g

March 30,1990 1

Trojan Nuclear Plant Docket 50-344 f

License NPF-1 I

r U. 8. Nuclear Regulatory Comission Attn Document Control Desk Washington DC 20555 l

l Daar Sirs Replacement of Heat Exchangers for pafety injection pnd Centrifutal Chartine Psme 011 Coolers f

i By letters dated April 28, 1989 and June 2, 1989, Portland General Electric Company provided a description of the review of installed commercial-grade items that we were performing. This description included a list of items that would be replaced as a reruit of the review.

l 1

i The heat exchangers for the centrifugal charging pump lube oil and gear oil i

coolers and the safety injection pump lube oil coolers were identified for i

replacement during the 1990 refueling outage. Due to unanticipated delays l

in the procurement process these heat exchangers will not be replaced

{

during the 1990 outage.

This work has been rescheduled for the 1991 refueling outage.

l Sincerely, T. D. Walt, Acting Vice President, Nuclear l'

ct Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Comission

{

Mr. David Stewart-Smith l

f State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan Nucioar Plant J

l f

i f

t I

i 9004060305 900330 hg' i

PDR ADOCK0".OOp44 p

[

P C

p

,i i

L 111 SW Sanon Steet Riq.yd Oropi 97204

[

o