F b.
J.
1*
-,at.,1,..
s\\
. $$DCLE AR REOULATORY COMidl88600d ate ii-l tet enAmit7YA stagg,,W.UU.
ATLANYA,640 Atla 3 833 N.....Y MAR ' 31990 t
Docket No. 50-424 License No. NPT-68 L
Georgia Power Company ATTN: Mr. W. G. Hairston, !!!
Senior Vice President -
Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 Gentlemen:
$UBJECT:
CONflRMATION OF ACTION LETTER On March 20, 1990, a Site Area Emergency was declared due to a loss of offsite power with a concurrent loss of onsite emergency diesel generator capability.
Because of the potential significance of this incident to public health and safety, the NRC's Executive Director for Operations has fomed an incident Investigation Team (!!T) to investigate the circumstances surrounding the incident.
This !!T will replace the Augmented Inspection Team (AIT) presently on site in an orderly transfer of team authority. Unit 1 was in cold shutdown at the time of the incident for refueling.
Unit 2 tripped from 100 percent power.
'c This letter confims the conversation on March 23, 1990, between R. P. Mcdonald and myself related to this incident. With regard to the matters discussed, we understand that you have agreed to cooperate with the !!T and you have taken or will promptly take the following actions necessary to support this investigation:
1.
Unit I will not be taken critical until the Regional Administrator is satis,fied that appropriate corrective action has been taken and the plant can safely return to operatic,n.
2.
Equipment involved in the incident may be quarantined by the !!T.
Personnel access to areas and equipment subject to this quarantine will be minimized, consistent with plant safety.
The licensee is responsible for quarantined equipment and can take action involving this equipment it deems necessary to:
(1) achieve or maintain safe plant conditions, (2) prevent further equipment degradation, or (3) test or inspect as required by the plant's Technical Specifications.
9004050409 900323 ADOCK 0500 4
l
{DR o
ZZO
o, e
Georgia Power Company 2
ggg g 3 )ggQ To the maximum degree possible, these actions should be coordinated with the lli team leader in advance or notification made as soon as practical.
The lli team leader may authorize a release, in whole or in part, of those areas or equipment subject to the quarantine upon a determination that the
!!T has received sufficient information concerning the areas or equipment requested to be released, or to pemit necessary troubleshooting of the equipment, required testing or maintenance to be performed.
3.
All records or damaged equipment will be preserved intact that may be related to the event and any surrounding circumstances that could assist in understanding the event.
Records shall be retained for at least two years following the event whether or not required to be retained by regulation or license condition.
4.
The licensee will make available to the !!T for questioning such individuals employed by the licensee or its consultants and contractors with knowledge of the event or its causes as the lli deems necessary for its investigation.
5.
The licensee will ensure that any investigation to be conducted by the licensee or a third party will not interfere with the !!T investigation.
The licensee will advise the !!T of any investigation to be conducted by the licensee or a third party.
Reports of such investigation will be promptly provided to the llT.
Issuance of this confirmatory action letter does not preclude the issuance of an order fomalizing your comitments.
The above comitments may be relaxed for good cause.
If your understanding differs from that set forth above, please call me immediately.
Sincerely, t
Stewart D. Ebneter Regional Administrator CAL-50-424/90-01 cc:
lli Leader l
NRC Office Directors Regional Administrators (cc cont'd - See page 3) l
[
m
[.
Georgia Power C(spany 3
19R 2 3 8 l
l I
cc:
R. P. Mcdonald r
Executive Vice President Nuclear Operations i
Georgia Power Company P. O. Box 1295 Bimingham, AL 35201 C. K. McCoy Vice President Nuclear l
Georgia Power Company P. O. 1295 Birmingham, AL 35201 G. Bockhold, Jr.
General Manager, Nuclear Operations i
Georgia Power Company P. O. 1600 Waynesboro, GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. 0. Box 1295 Bimingham, AL 35101 Ernest L. Blake, Esquire i
Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C.
20037 l
J. E. Joiner, Esquire Troutman, Sanders, Lockerman, and Ashmore 1400 Candler Building 127 Peachtree Street, NE Atlanta, GA 30303 i
D. Kirkland, !!!, Counsel Office of the Consumer's Utility Council i
Suite 225, 32 Peachtree Street, NE l
Atlanta, GA 30302 Office of Planning and Budget i
Room 615B 270 Washington Street, SW Atlanta, GA 30334 j
(cc cont'd - See page 4)
F
~
3, I
E 23N Georgia Power Company 4
t I
Office of the County Comissioner Burke County Commission
)
Waynesboro, tiA 30830 J. Leonard Ledbetter, Director Environtrental Protection Division Department of Natural Resources
[
20$ Butler Street. SE Suite 1252 l
Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 l
r State of Georgia I
f L
[
i-f t
i l
l I
i l
l l
i 1
t
7 i
~;
Georgia Power Gonpany 5
MAR 2 319N Office of the County Cornissioner Burke County Connission Waynesboro, GA 30830 J. Leonard Ledbetter, Director-Environmental Protection Division Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 State of Georgia bec: J. Taylor, EDO J. Lieberman, OE T. Reid, NDR E. Reis 060 J. Hopkins, NRR C. Jenkins, Rll K. Brockman, Ril A. Herdt, Rll Document Control Desk NRC Resident inspector U.S. Nuclear Regulatory Corrnission P, O. Box 572 Waynesboro, GA 30830 Rllft?f' Ril AHerdt LR H i toan 3/23/90 23/90 3/2 3/90