ML20012E164
| ML20012E164 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/02/1990 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20012E162 | List: |
| References | |
| NUDOCS 9003300150 | |
| Download: ML20012E164 (2) | |
Text
w.,s.n n..? w,um n-e-,+w,w n m.msnm,v v me~m
- y
... c:
.- 1
~
- )
...c
-j t
(i
- n 'i
{
t i
I t
ii f
i a
5t r
ANO-2 TECHNICAL SPECIFICATION.
.k PROPOSED CHANGE PAGE
.t1
\\
l' h*
{
G it I
a t-F 0e 3
t
.C s
y
(
y y,
i f'
C t.p.
tp ly; c.
y g-
.e T
s a
A 9:
t-5[
. n.
9003300150.900302
_q6 LPDR-ADOCK05.Og6, O
)
I P
'SN
' ij, [ }_
.a.
e _ - -
44>
9^
- SPECIAL TEST EXCEPTIONS s
GROUP HEIGHT. INSERTION AND POWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION 3.10.2 The group height, insertion and power distribution limits of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5, 3.1.3.6, 3.1.3.7, 3.2.2, 3.2.3, 3.2.7 and the Minimum Channels OPERABLE requirement of Functional Unit 15 of. Table 3.3-1 may be suspended during the performance of PHYSICS TESTS-provided:
a.
The THERMAL POWER is restricted to the test power plateau which
.shall not exceed 85% of RATED THERMAL POWER, and i
b.
The linear heat rate limit shall be maintained by either:
1.
Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on linear heat rate (when COLSS is in service); or 2.
Operating within the region of acceptable operation of Figure 3.2-1 using any operable CPC channel (when COLSS is out of service).
APPLICABILITY:
During startup and PHYSICS TESTS.
ACTION:
With any of the above limits being exceeded while any of the above l
requirements are suspended, either:
a.-
Reduce THERMAL POWER sufficiently-to satisfy the requirements of the above Specification,-or b.
Be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.10.2.1 The THERMAL POWER shall-be determined at least once per hour during PHYSICS TESTS'in which any of the above requirements are suspended and shall be verified to be within the test power plateau.
4.10.2.2 The linear heat rate shall be determined to be within its limits during PHYSICS TESTS above 5% of RATED THERMAL POWER in which any of the above requirements are suspended.
APKANSAS - UNIT 2 3/4 10-2 Amendment No. 37