ML20012D937
| ML20012D937 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/20/1990 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kaplan A CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20012D938 | List: |
| References | |
| NUDOCS 9003290116 | |
| Download: ML20012D937 (2) | |
See also: IR 05000440/1990002
Text
D CD /De(6C RT DS)
z.
2
,.
I
-
,
l
<
.
N 2 01990
i
F.
)
'
!
Docket No. 50-440
,
The Cleveland Electric Illuminating
l
Company
1
t
b
ATTN: Mr. Alvin Kaplan
,
Vice President
t
.
Nuclear Group
10 Center Road
!
'
Perry, OH 44081
j
Gentlemen:
!
"
This refers to the routine safety inspection conducted by Messrs. P. L. H11and,:
1
G. F. O'Dwyer, B. Drouin,'and W. Liu of this office and G. West, of NRR on
i
.
January 3, through February 28, 1990, of activities at Perry Nuclear Power
Plant, Unit 1, authorized by NRC Facility Operating License No NPF-58 and to
the. discussion of our findings with Mr. S.-Kensicki'and others of your staff
i
at the conclusion of the. inspection.
!
>
The enclosed copy of our inspection report identifies areas examined during.
the inspection. Within these areas, the inspection consisted o' a selective
examination of procedures and representative records, observations, and
. interviews with personnel,
f
During this inspection, certain of your activities appeared to be in violation
!
of NRC requirements as identified in the enclosed copy of our inspection
report. The inspection showed that the violations met the test of 10 CFR 2,
Appendix C,.Section V.G.1; accordingly no Notice of Violation was issued. No
reply to the violations is. required and we have no further questions regarding
these matters at this time.-
!
a
In accordance'with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and'the enclosed inspection report will be placed in the NRC
,
Public Document Room.
,.
l
.
5
j
4
!
l'
t
.
!I
L
.
9003290116 900320
ADOCK 05000440
.
c
Q
,
,
0 1!
-
.
.
p.
i
e
.
.*
,, ,
L
The Cleveland . Electric Illuminating
2
MAR 2 01990
,
Company
L
,
!
We will gladly discuss any questions you have concerning this inspection.
!
,
Sincerely,
L$u& C YW(
Richard C. Knop, Chief
,
Reactor Projects Branch 3
1
Enclosures:
1.
Inspection Report
No. 50-440/90002(DRP)'
2.
January 18, 1990 Enforcement
Conference handouts
cc w/ enclosure 1 (Inspection Report
No. 50-440/90002(DRP)):
i
F. R. Stead, Director, Nuclear
Support Department
-
M..D.- Lyster, General. Manager,
<
Perry Plant Operations Department
R, A. Newkirk, Manager,
Licensing and Compliance Section
S. F. Kensicki, Director, Perry
>
Plant Technical Department
H. Ray Caldwell, General
Superintendent Nuclear Operations
,
DCD/DCB-(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
-
' Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio,
Public Utilities Commission
t
G. West, NRR
W. Regan, NRR
W. Liu, RIII
t
cc w/ enclosure 2 (January 18, 1990
Enforcement Conference handouts):
-
NRC PDR
.
.
RIII
RI{I
..
R
RII
,
D
n/kje
obe
- )7/'n
=$"b
K
qp
ay
33l#
,\\n
.
.
.