Forwards Latest Info Available Re NRC Oversight of TMI Action Plan Item Implementation by Licensees.Nrc Plans to Provide Periodic Status Repts on Effort Until Implementation of All TMI Action Plan Items Satisfactorily Completed
ML20012D925
Person / Time
Issue date: 03/20/1990
From: Carr K
NRC COMMISSION (OCM)
To: Markey E
HOUSE OF REP.
References
NUDOCS 9003290097
Download: ML20012D925 (2)


Text

F g f'

/

N o,,

UMTED STATES

?

NUCLEAR REGULATORY COMMISSION g

i wanwiwoTow. o. c. roess March 20, 1990 CHAIRMAN The Honorable Edward J. Markey United States House of Representatives Washington, D. C.

20515

Dear Congressman Markey:

In view of the interest you expressed in previous corres-pondence regarding the Nuclear Regulatory Commission's (NRC's) oversight of TMI Action Plan item implementation by our licensees, I am writing to provide you the latest information available to me on the status of this effort.

This information reflects the NRC staff's most recent review of licensae actions and commitments in this area and is current through February 1990.

A copy of the staff's February 22, 1990 report to the-Commission on this matter is enclosed.

Over 98 percent of the TMI Action Plan requirements have been implemented at the 113 currently licensed facilities.

Of 19,436 possible TMI Action Plan items,13,744 were found applicable when reviewed against each licensed reactor.

These figures have increased since our last report to you as a result of the addition of Limerick 2 to the list of licensed reactors.

Of the currently applicable items, 13,537 have been implemented.

Only 207 remain open, a reduction of 18 percent from the 254 open items identified in the Commission's June 1989 letter to you.

About 70 percent of the remaining 207 open items are expected to be implemented by the end of Calendar Year 1991.

From a plant perspective, the TMI Action Plan has been fully

{

implemented at 24 of the 113 licensed facilities.

Six plants i

account for about one third of the remaining open items:

Browns Ferry 1, 2, and 3 (53 items), Salem 1 and 2 (10 items),

1 and San Onofre 1 (6 items).

In addition, two plants Rancho Seco (3 items) and Shoreham (4 items) have indefinitely suspended all TMI item schedular commitments in conjunction with the decision to cease operations.

The remaining 81 facilities have from 1 to 4 unimplemented items.

i OD i

ho3%0097)XApr

0 Although significant progress has been made in implementing TMI Action Plan requirements since June 1989, continued effort is needed to resolve the remaining open items.

I can assure you that the NRC will continue to monitor closely licensee actions and commitments at facilities with unimplemented items.

I plan to provide you periodic status reports on this effort until implementation of all THI Action Plan items has been satisfactorily completed.

Sincerely, Kenneth M. Carr

Enclosure:

SECY-90-061,

" Implementation of the TMI Action Plan" l

e

m I I e

    • e*

gel w gE* M February 22, 1990 g

SECY-90-061 F,or:

The Commissioners From:

James M. Taylor Executive Director for Operations

Subject:

litPLEMENTATION 0F THE TMI ACTION PLAN

Purpose:

To inform the Commission of the status of implementation of Tit! Action Plan requirements.

Discussion:

The enclosed information presents the implementation status of the Till Action Plan and highlights progress made since the June 1989 response to Congressman Markey and the nemorandum of Hovember 14, 1989, to the Commission, subject as above. presents the overall status and progress achieved to date. Enclosure 2 presents estimated implementation time-frates for the renlaining open items. Enclosures 3 and 4 provide the number of open items by plant and by major area respectively. details the items listed as open in the response to Congressman Markey and identifies their current status.

4 Over 90 percent of the TMI Action Plan requirements have been implemented at the 113 currently licensed facilities. As shown in Enclosure 1, of 19,436 possible TMI Action Plan items, 13,744 were found applicable when reviewed actinst each specific.

licensed reactor. The number of total and applicable items increased since the June 1989 report to Congressman Markey as a result of the addition of Limerick 2 to the list of licensed reactors. Of the currently applicable items,13,537 have been implemented and only 207 remain unimplemented.

Progress is being made on closing the remaining open items.

Specifically, the number of open itens has been reduced by 18 percent from the 254 identified in the response to Congressman Markey to the 207 itenis currently unimplemented.

The Corr.ission should note that the current list of open items shown in Enclosure 5 includes one item that was previously listed as completed. This issue involves issue number II.D.I.3,

" Block Valve Testing," for Ft. Calhoun. Further review by the 1

NOTE:

TO BE MADE PUBLICLY CCHTACT:

AVAILABLE IN 10 WORKING L. Barnett, HRP, DAYS FROM THE DATE OF 49-21217 THIS PAPER I

The Commissioners [

staff found that the valve testing data previously referenced by the licensee was for valves that are not similar to the Ft.

Calhoun block valves. The licensee has committed to test i

similar valves by December 31, 1990. With regard to the plant safety parameter display system (SPOS) console, the staff is i

currently reconciling differences in status that may exist-between licensee responses to Dr. Murley's letter of April 14, 1989, which requested licensees to review and report THI item implementation status and Generic Letter 89-06, " Safety Parameter Display System," which required licensees to certify compliance with SPDS design criteria.

As shown on Enclosure 2, about 70 percent of the remaining 207 open items are profected to be implemented by the end of calendar year 1991. Although some slippage in dates has occurred, all schedule changes for implementation of all TMI Action Plan items remain within the tineframe stated in the response of June 15, 1989, to Congressman liarkey. There are currently eight items that have not been assigned implementation dates by licensees.

f Seven of these items are associated with two plants Rancho Seco and Shoreham, whose licensees have indefinitely suspended all Tit! item schedular commitments in conjunction with their decision to cease operations at these facilities. The remaining item without a date is associated with Haddam Neck where the licensee is evaluating procedures to satisfy the requirement, but has not established an implementation schedule.

From a picnt perspective, the TMI Action Plan has been fully, imp'lemented at 24 of the 113 licensed f acilities. As shown on, six plants account for about one third of the 207 remaining items: Browns Ferry 1, 2 and 3 -- 53 items, Salem 1 and 2 -- 10 items, and San Onofre 1 ---6 items. The remaining l

83 licensea facilities have one to four unimplemented items.

From an issue perspective, four major areas account for about three fourths of the 207 remaining items, as shown in Enclosure 4: detailec control room design review -- 77 items, plant SPDS console -- 45 items, technical specifications -- 17 items, and accident monitoring -- 15 items.

l In summary, over 98 percent of the TMI Action Plan requirements j

have been implemented at licensed plants and significant progress has been made on closing the remaining open items.

i

/

h~

es M. Tay r ecutive Director for Operations

Enclosures:

DISTRIBMIOm As stated Commissioners EDO OGC ACRS 1

OIG ASLBP LSS ASLAP GPA SECY REG OFFICES

s TMi ACTION PLAN REQUIREMENTS IMPLEMENTATION STATUS AT LICENSED REACTORS ammmmmmmmmmmmmmma 2S.000 300

[

PeoonESS Ma0E OVERALL STATUS i

e

,/

j 240 294 20.000 y

(

E i

M taf I

E D

19'436

/

=

r o

223

] 19.000

/ ' ~ ~,' '

/ 207 /

'80

(

/

/

180T IMP /

Z p

w o

2 U 03I 13,744 i

10.000 g

g 120 E

~

S.000

'\\

60

+$

s q.l ?

'f x

3

/

/

- /

^

/

' ::3 - : /

d:

/

n.

s t

i i

1 I

TOTAL

  • APPLICABLE
  • Cuent'sef stEPosti TO 900v 89 my ITE MS ffEMS STATUS CO8eGmESSMA88 OtsAftTEnty graygg MesmEv mEPoni MPLEMENTED NOT IMPLEMENTED
  • Number of total and applicable items increased since the Jesne 1989 Report to Congressman Markey due to the addition of Limerick Unit 2 as a Neonsed reacter.

ENCLOSURE 1

s PROJECTED SCHEDULES FOR 207 REMAINING ITEMS i

250 UNIMPLEMENTED ITEMS AT END OF CALENDAR YEAR MARMEY REPORT SCHEDULES i

200 CURRENT m

SCHEDULES 2

l m

h s

O 150 s

W H

Z W

E E

100

's

_.I g

s, h

z i

3

's 50

}

l!

's' l

l 0

g g

i g

g g

g g

f 12/89 12/91 12/93 12/95 NO DATE

-12/90 12/92 12/94 12/96 1

i 12/89 12/90 12/91 12/92 12/93 12/94 12/95 12/96 NO DATE j

MARKEY REPORT SCHEDULES

  • 163 110 57 31 19 15 14 12 12 f

CURRENT j

SCHEDULES.

207 116 62 27 14 10 8

S

  • Based on dates of items currently listed as unimplemented.

EMN 2 4

4

l 1

4

SUMMARY

OF THE 207 REMAINING ITEMS BY PLANT

~

PLANT OPEN PLANT OPGs PLANT m

Prairie gegend 1 1

Arkansas 1 1

Grand Gulf 1 1

i Prairto Belend 2 1

Arkansas 2 1

HeddeneNeck 3

Quod CMies 1 2

Beaver VaNey 2 2

Hatch 1 1

Quod CMies 2 2

Big Rock Pt 3

Hatch 2 1

Rh he 3

"raidwood 1 1

Indian Pt 2 1

3 l

draidwood 2 1

Kewaunee 2

Sh1 5

l j

Browns Ferry 1 17 LaSalle 1 1

Salone 2 5

f Browns Ferry 2 15 LaSaNo2 1

"* I 8

Browns Ferry 3 21 McGuire 1 2

he2 2

f Brunswick i 1

McGuire 2 2

SanOnofre3 2

l l

Bresnswick 2 1

MtHstone 1 2

i

    • k 1 2

1 Byron 1 1

IWIllistone 2 1

2 Nine MIIe Pt 1 2

Byron 2 1

3*geeyah 2 2

Calvert CNffs 1 2

Nine Mile Pt 2 2

Shorehene 4

e II A""* 1 1

Calvert CNffs 2 2

I 1

North Anna 2 1

Cooper 2

St. Lucio 2 1

ge,,,, 1 1

3 Crystal River h

1 i

Oconee 2 1

DC Cook 1 3

1 DC Cook 2 3

1 Y '*' I 2

Sorry 2 1

Davis-Besse 1

l Diable Canyon 1 1

2 Tre >

1 Pale Verde 1

(

Disblo Canyon 2 1

y 78th'Y Pt 3 2

Palo Verde 2

[

Dresden 2 2

1 TMg Pt 4 2

Dresden 3 Pale Verde 3 1

Verement Yankee 2

2-j Duane Arnoht 2

Peach Bettene 2 3

I i

Farley 1 2

Peach Bettesse 3 2

VW2 1

2 f

Farley 2 p,,,,1 1

Fernei 2 Pligrien 2

1 1

2 l

FMrpetrick Point Beach 1 2

Ft Catheun 3

Zion 2 2

P*t hm 2 2

esCtoSBRB.

j l

SUMMARY

OF THE 207 REMAINING ITEMS BY AREA AREA i

OPEN j

o Shift Technical Advisor 1

e o Plant SPDS Console 45 o Post-Accident Sampling g

o Relief & Safety Valve Test Report 7

o Containment iso!ation Dependability 5

o Accident Monitoring 15 l

o Instrumentation for Detection of inadequate Core Cooling

-12 o B&O Task Force issues 12 o Control Room Habitability 7

o Technical Specifications - NUREG -0737 17 o Detailed Control Room Design Review 77 TOTAL 207 ENCLOSURE 4 i

t 4

e

_.r

..--,y_

-r

.-w

+ -

-,--r-,

--.----m-m

=---

i e

Fagehe.

01/:4/10 UN!MPLEMENTED IM! !!!UE SCHEDULE EVALUATION J

PLANThant ISSUENUMf!F 1]ILE/DESCRIPil0N 5 19 09 NEW STATUS DATE ARLANSA!!

MPA-F071 DETA! LED CONTROL R03M REVIEW 01/31/91 06/30/92 i'

FOLLOWUP 10 MFA F006 ARrAh!AS2 MPA FC71 DETA!LEDCONTROLROOMREVIEW 08/30/92 FOLLOWUP 10 MPA-F008 DEAVERVALLEY1 MFA-F071 DETA! LED CONTROL ROOM REVIEW !!/30/09 COMPLETED FOLLOWUP 10MPA-F008 PEA \\tt VALLEY 2

!.D.2.3 PLANT SPDS CONSOLE FULLY 05/31/89 12/31/90

!MPLEMENTED PEAVEFVALLEY2 MFA-F07!

DETAILED CONTROL ROOM RTVIEW 09/30/9012/31/90 FOLLOWUP TO MPA F000

!!680:5 PO!ni 1.t.0.2 PLANT Sett CONSOLE IN!TALLED 10/30/90!!/01/90 i

919FC:rF0!NT 1.0.:.3 PLANTEPDSCONSOLEFULLY 10/30/90!!/01/90

!MPLEMENTED P!S E::/ F? N MF A '071 DETA! LED CONTE 0L ROOM REVIEW !?/31/90 FOLLOWP 10 MFA F0OR PEA!!W2001

!.D.I.!

PLANT SFtS CCN!DLE FULLY 12/30/E9 COMPLETED IM*LEMINTER PFAltt02:

F A-FE'!

PETALLED CONTFDL ROOM REVIEW 03/30/91 FOLLOWUPTOMPA-F00E

!EA! r20: :

!.D.2.3 PLANT SFD! CONSOLE FULLY 03/30/90 COMPLETED IMFLEMENTEI PE4!!s00t :

MFa F071 DETAILED CONTF::' F00M REVIEW 08/31/91 FOLLDFUF 10 McA F00E IR0n!FEFH !

1.D..1 PLANT S'!S CONSOLE DESCRIFi!0N 12/31/92 PPCW65FIF:Y!

!..1.:

PLANT $PD! CONSCLE INSTALLED 12/31/92 fotn! FIF:' !

1.!.0.7 PLANT EF!S CON!CLE FULLY 12/31/9:

IPFLEP!Nitt iPMI FEF8V !

!!.f.7.3 F AS FROCEDLE!

12/31/92 IRCuiFE8' !

!!.i..4 FA!-FLANT MODS (LL CAT !)

12/31/92 iMe! 8im :

1.E.4.2.1 4 CONIA!N ISOL 12/31/92 DEFENDAllLITY-lMPLEMENT D!VER!! !!0L BR06%i FEE U !

II.F.1.1 ACCIDENTMONITORIN6-FRDCEDURES 06/30/9112/31/92 l

IRE HS F!**y 1

!!.F.1.0.A ACCIDENT MONITOR!NS-N0fLE 6AS 12/31/92 MON!iOF FROH! FEERY !

!!.F.1.2.1 ACCIDENT 12/31/92 MONITORING-10 DIN!/ PAR 11CULATE SAMPLING BR0HSFEftY!

!!.F.1.0.C ACC10ENT MON!TORIN6-CONTAIN 12/31/92 H16H RANSE MON!10R i'R0eN! FEFFY !

!!.F.1.2.E ACCIDENT 12/31/92 COMPLETED MON!!ORIN6-CONTAINMENT PRESS fE0WNS FIF8Y !

!!.F.1.2.r ACCIDENTMONITORING-CONTAINH212/31/92 COMPLETED PROMS TEftY 1 II.F.2.4

!NST FOR DETECT OF INA0 CORE 12/31/92 COOLING-!NSTALL FDD'l INST IF0H! FEE 5i 1

!!.t.7.13.1 140 TASK FORCE-HPCI & RCIC EYS 10/31/92 INIT LEVEL - MODS It0HfFitFY:

!!.t.7.!f.C B40 1 Aft F0E:E-ADS MODE 12/!!/92 f t.Cn! FE5: :

!!.l.:.??

fl0 1ASK FCR:E-CCEM0N 12/31/92 8.ETEREN:ELEVELF0EIWF!

ENCLOSURE 5

s Fett kc.

2 01/4/90 UNIMPLEMENTED IMI !!!UE SCHEDULE EVALUl 10N PLANT h8ME ISSUE NUMPER

!!ILE/DESCRIPT10N 5 19 99 NEW

$1ATUS DATE PROWNSFERRY!

!!.R.3.:t P401ASR FORCE 4UAL OF ADS 12/31/92 ACCUMJLA10RS PROWNSFERRY!

MFA4:23 IE COVERED BY 6L 83 36 L E3 3712/31/92 (NURES0737)

PRDWNSFERRY!

MPA F071 DETA! LED CONTROL ROOM REVIEW !?/31/92 FOLLOWLt 10 MFA F000 BROWNSFERRY2 1.D.2.1 PLANT SPDS CONSOLE DESCRIFil0N 06/30/9112/01/91 PR0wNSFERRY2 1.D.0.2 PLANT SFDS CONSOLE INSTALLED 06/30/91 12/01/91 PPOWNSFEF.RY2 1.t.:.2 PLANT SPDS CONSOLE FULLY 06/30/91 12/01/91 IMFLEMINTED idROWN!FEFR):

!!.I.3.!

FA! FPD EDURE!

06/30/91 06/30/90 FFCWNSF!FFY2

!!.I7.4 FA!-PLANT MODE (LL CAT P1 06/30/91 06/30/90 IR0ns FE5RY :

!!.E.4.:.1 4 CONTAIN!!0L 12/31/09 04/01/90

[*PENDAllLliY !MPLEMENT DIVEF!E!!0'.

IRCA! FEt.RY 2

!!.F.2.1 AOCltENT MONiiCRINS-FRCCE!,RES 12/31/29 04/01/90 IRO*N! FERRY 2

!!.r.!.:.A ACCIDENT MONif0 RING-N0fLE 6A! 12/31/29 04/01/90 MMITCr_

Pr,0WN! FERRY 2

!!.F,1.:.!

AttttENT 1 /31/g9 04/01/90 MONITORINS-10 DIN!/PARilCULATE SAMPLINS tR0n! FERRY :

llF.1.:.!

ACCIDENTMONITORINSCONTA!N 12/31/8904/01/90 HISH RANSE MON!iCR PF0WNS FIRRY :

! !. F.1.

. I-ACCl!ENT 1 /31/89 04/01/90 MON!!DRINi-CONTAINMENT FRESS PROWh!FE8FY:

!!.F.1.0.F AClDENTMONITORIN!-CONTAINH212/31/89 COMPLETED IEWNSFEtFY2 ll.t.:.!!.!

fit TASK FOR E-HFCI 4 RCIC SY! 12/21/29 COMPLETED INIT LEVEL - MOIS fR0rN! FEF'Y 2

!!.t.:.it.C 510 TA!r FORCE-A0! MODI 12/21/09 04/01/90 PP:n! *E55Y :

!!t.3.:'

!!0TA$rFORCECDMMON 06/30/91 04/01/90 i

REFERENCE LEVEL FOR BWR!

PRC n! rErry :

1,r,3,t

$te TAgt terrg.0 VAL OF ADS 06/30/9112/01/91 i

ACCUMULATORS i

lR0pk! FERRY:

PFA F0?!

DETAILED CONTROL ROOM REVIEW 12/31/6908/01/93 I

FOLLOWUF 10 MPA-F006 fRDWNS FERRY 3 f.D.2.1 PLANT SPDS CONSOLE DESCRIFil0N 06/30/91 PPtW E FEM Y :

1.t.2.0 FLANT SFDS CONSOLE INSTALLED 06/30/91 l

PRDWW! FEFRY !

!.D.2.3 PLANT SPDS CONSOLE FULLY 06/30/91 12/30/91 1

IMPLEMENTEI l

PROWNS FERt.Y 3

!!.E.3.2 FAS CORRECTIVE ACTIONS 06/30/91 i

BRO W S FEfhY :

!!.l.:.3 PAS-FRDCEDURES 06/30/91 liR0hNS FERTY 3

!!.B.!.4 FAS-PLANT MODE (LL CAT !<1 06/30/91 l

PR0n3 FERTY 3 11.E.4.2.1 4 CONTAIN ISOL 06/30/91 i

DEFENDA!!LITY-lMPLEMENT i

DIVERSE ISDL PT.CH ! FIF.RY !

II.E.4.2.6 CONTAIN!!DL 06/30/91 DEPENDAllLITY CONTAIN FURSr i

VALVES PRCC.! FErR: ?

!!.F.I.1 ACCIDChi MONITORINS-PROCDURE! 06/30/91 ItR0n! FIFt.V :

!!.F.1.2.A A CIDENT M0hl10R!h6-NOPLE 6AS 06/30/91 06/30/90 MON!iOR l

I i

Patt be.

01/!4/10 Un!Wl9tht[! I'l 1150( $tH(l'Utt tvALUA110h PLAninAP!

!!$0[W.*l[I 1!fLt/tt$tFlit!0h 3 19 tt W(t

$1ATV$ !*1t litMI filly 3

!!.f.1.2.1 Attitth!

06/30/t!

MDhl10l]N610t!N(llAtiltUi&Il ll#'tINI PRDWW! FttiY 3

!!.T.l..t AttibikiMDN110RIN$t0NTA!E 06/30/91 H!$H fanft MDhltp ICWh$fitti3

!!.F.1.:.1 Att!tthi 06/30/91 MDh!i0t!N6 CONT &!MMth'i filt!

Pt0WL3 f(tit !

11.F.1..!

A: tit [W1M?h!TORlWit0n1AIN 06/30/91 6A?!fLIVIL PIDWWI FittY 3

!!.8.1:.F AltitDi MDhltMlWi t0W1A!n W? N!30/t! COMFLtilt litek! tttty !

!!.F.:.t ht? f 3 ttitti Dr utst COtt 06/30!t:

100L!h! !K!1A'L &!FL Inti It06kl FE8'F) !

!!.r.:.:1 140 f t!t F0 tit wit] 4 R !C it! 0t!30/91 N ' Liv!!

M;!!

li M t FittY ?

!!.i.' !!.

140 TA!r F0t;t A!! Pri!

06/30/91 ItM! 8tF8V :

!!.I.. '

lt0 til' T00 [ 00M0h N/30/91 I!F(Ilk:tLIV[LFDLte!

itM! Filh

!!.'.. i 16018tr 50p;g O', int Dr it!

06/30/41 Att'JMAA10t!

Fl?th! f[lli 3 F.le Kl:

'l COV(((t lY $L (136 4 (3*37 04/30/91 BUtif 07??)

Ittn} TitlY 3 MIMP:

((1&nt!(thit0Lt00Mt[yl[g 04/;0/91 FD; LOW # 10 MFA F009 IF:;h!4l:r i r8& Fr:

![18.!it!> C0kitDi LOOM ((VI[g 02/;[/970!/30rt; FOLLOv# 10 MFA F001 IkUK!6104 M88 i(*:

((T&!!!D CthikDL 700M ttV![W 0$/$h'D2t7!!!/41 TOLLOW# 10 MFirF00t IGh 1

  • 8& f '.

(( TAIL [P CONTLD( E00M ((V![W 01/31/90 FOLLOW.T10MFA-F002 te.:

P8& 8:'

(leltti (OW!FDL RDDM f ryl[i 09/30/90 FDLL0r.'t it MF A F006 (ALY[*'CLrrt:
  • ! COVlftt lY Bi 43 3! 4 (3 37 0!/30!!i 07/:!!90 (NJl[$07}7)

(ALY!st CLIFT 5 1 M84T(?!

tt1A! Lit 00W170L I:00M ttvlty 07/01/t107/01/t; FDLLOWN 10 M56 F002 CALVIL1CLIFFt2 mal (!:

15C0Vit[ttYEL 33 36 4 63 37 Ot/30/tt 07/31/90 (N#f6 0737)

CALViti CLIFF 5 2 RIAFli!

0[1 AIL () 00 Nit 0L ROOM ((Vl[W 07/01/91 FDLLOW# 10 MFirF008 CA1AWlAi 1.1.!.!

PLAW1$ft$CONLDL[FLILLY 12/0t/t1COMPL(1[t

!MPL(M[hi[t th1Abit!

1.1.2.!

PLANT $Fi! CON $0L( FULtY

!!/0B/[iC09tL[ fit

!MPL(P.[Ki[I C008 tf.

l.A.l.l.*

$FIFT T!(HFICAL ADVl$Dt

!!/30/tt 0;/2(/90

'ICHhltAL EFE !FltA110K!

C00*E!

M! A F(7:

Il1A! Lit CONTLDL LOOP.f.tvith 12/31/91 FOLLOW # TO MF A F00t OtV!1A' t!VI5

.t.?.?

PLANT !!!! CCN!DLt FULLY

!!/7!itt06/30/t!

!WlEENTII LY!TA;f!VCl

!!.!.l.:.i IIL!tF 4 St,rtiY VALVI it$1 L3/30/92 EEC-FLAC 18ECIFIC REF0FT

h Fett he.

4 01/24/10 Uh!WLIMIkif t it! It$st $CO/.! (VAttiAi!DE plant h8At ll$)t N.mi'IF f!TLt/Mt;A!Fi!DE M t DT Ntt 11 Af t'5 !dit tty!1ALtivtt

!!.t.4.2.6 CDET A!A 15DL 06/01/ttCMPLtitt MPtOA!!LITY CDWTA!N PUR6l v4LVil (KY!TALR!vit

!!!.t.3.4.3 COhitDL IDD*.

03/30/90C5/30/90 hat!!AllLlit !MPLtMENT MDtl (til1&L F!Vit MI A 10C3 il C0VIR[t il CL 13364$33706/30/t9CDMPLiitt (N?tt60737) t.C.tD0t1 1.D.:.3 PLAK16fil CDh$DLt FULLY

!!/30/90

!MPLtMtkTI) t.C.000r!

M'AItt!

15 C0Vitt) IV 6L $3 36 4 83 37 06/30/tt 02/tt/90 IN?tti(7:71 t t, t00L !

P,*A'071 ItTA! Lit' tDNitDL LD3 Riv!!b 12/31/10 FDLLt*V810 MM00!

!. *. C006' !

1.!.i.3 PL8Niit!!00hfDLtF'.*.Li 08/21/90

!M*LtMikitt D. t. ;D0f 9Htt t! 00 Vill! IY IL !! 76 4 83 !? N/30/tt V;/Off90 (N?t!60'!?)

t. t00t :

M H t'l M1Alltt t0htt0L 003 ttVitt 12/31'90 FDLLOWF 10 MFM00t ts'.'ll Itt!!

WA-F071 MTAILit CCWitDL RDDM ttV!!W 06/30/90 FDLLOOP 10 PFM00%

!lAl".0 CANYON 1

  1. AF071

!!1A!L[t CDhitDL RODM LEV!!W 03/31/t!

FOLLOOP 10 MM005

!!tt0CLKYDA MF M 0?!

DilAlitt (DhitDi RD0M LIV!te 10/31/t!

FOLL00t TO MA F006 Itt!!!K!

!!.F.:.4

!k!1 FCR MitCT OF INAt C0FI 12/31/90 CDDLIN! !L!iALL Att'l !hti

!tt!:th:

MTM(!!

MTA! Lit CONTPDL PDDM ttvit6 12/31/90 FDLLOWF TD MtW000 Ltt!NA 3

!!.!.!.4

W!1 FOR Mit
10F lhAt C0f t 06/30/91 CDDLINS !N!T8.'L AtD'l !Wii Ltt!!!k3 rF M (71 ill8! Lit CONTFO' t00M ttVlts 03/71/90 FOLLOW 710 MPN006 PDANI (AND'I M HDI) 1$ COVill) if $L $3 36 4 $3 37 0$/31/tt 02/1$/90 (nut!60737)

PL'ANI (ANDit MF H 0?!

Mit!Ltt CONitDL 003 REV!!W 05/31/9006/01/90 FOLLOW P 10 M' H 008

'AR'!V !

11.0.1.2.1 tilltf 4 $4 Flit VALVI itti 06/!!/91 P(0PLAK1IPitlFICktPDFT F AF:LI) 1 MF H 071 MTAIL(li CDNilDL RODM itvlts 06/21/91 IDLLDNUP 10 MFA F00t FALLtY 2 ll.!i.l.0.t t[LIIF 4 $ArtTY VALVI flli 12/21/90 f t0-PLAWT $FIClFIC RtP0ti F&titi M56107!

Itf81LI) CDNTRDL ROOM RIVltW !!/21/90

)

FOLLOW 110 MFM00t FILM 1:

II.T.l..!

Att! MET 12/01/ttCDMPLifft 1

  • .0N!!Dt!kE 10t!Nt/PARilCULisit

!AMri!kt I

Ft811 :

!!l..1!.

(LO TA$r F0tst Att MXI 12/01/ttCOMPLtit.-

FliM1 :

1 :.t.!.4.!

C0kiF0;00t li/01/tt06/30/90 t

HAlliAllLITV !MFLEMIK1 MD:!

N Fett ht.

l (1/;4/90 Uh!MittMltitt it! Ittut Ittit!,0Lt tv4LttA110N PLlAt hist ltt?! OtMt fiftt/Mstt!Fi!0N

$ 19 99 mit

$14105 147t Fttt!2 MtA4071 Mit! Life COWif 0L LODM Rivilt 06/30/91 FOLLOW # 10 MFH000 Fil!F Att! t MrA!072 Nutr6 073718 It0Vlftt if $L 05/31/ttCOMPLlitt t21/,AND$302)

Flf!! Aft!tt MFi50t3 15 COntRt! ly 6' 83 36 4 83 37 05/31/t9 COM'ttitt (NLft!60737)

FlillAikltf P.I A4071 MTAILt!C0hfROLR00Mtivitt 06/30/9004/30/90 IDLLOWUI 10 Mf M00t F1. CliLH%'h 1.l.*.

Finki!.it!(DWt0LtFULtY 06/30/90

!MPLEMikitt Ft. ( A' hM

!!.!.;..I ttL!!F 4 ItJtTV tALVI tili 01/30/t9C09titti titPlani1,8ttiftttit071 F1 Ct!.6t;'t FTLitt 4 $4tify t&'Vt it!!

// 12/31/90

  • Note 1 3

f!HLO;t vi VItiillWI Ft. CA;WOLS tf/ 8t?

MTA!LtD C0 kit 0L $03 IIV!!6 06/30/90 FOLLOW)F 10 R8 H 0(t Ft.!!.VIAlh 1.C.J.!.&

$H0f f itf E A*C!pthi i It00Et 09/30/09 COMPLiitt IIV Ikki C0tt COOL tithi..'

f'JIDE

  • 1. 51, tuis
.t.l.:.t

$H0ti+ Tire Attit[Ki 4 F10;tt 09/30/tttptLiftp l

FtV lhAt (0tl C00L4tV!!! FE0t r.11,vu!n

!.:.: !.A IOT1[trA(!!!NT4ft0Ci!> 09/30/ttCOMrttitt fivitt.k!4Att!!tht!4tuAL

$L'!!!

Fl. St. Vit!!-

!.;. !.i

$NttiiltMAttitthi4ft0It 09/30/ttCOMPLtitt irritull!N!!IAttf[Ylit FF 0t ilkG Ptilf !!!! 00h!%! FULL 1

// C09ttitt IMPLEPtWitt 6!N

"; i:':

M1Alltt (OhitX f 03 Liv!!6 12/!!/t9CDettitt' FOLLOW # 10 MFH008

$8 tN: l ;f H MP:

Illaltit CONilt LOM ttvitt 10/30/9012/31/90 FOLLOWJ5 TO MFM001 Nattia httr ll,F.1. '

AttlttW1 M0hlf0K!Wi 00W18!N H212/31/90 COMPLill!>

hADIAth!Cr

!:.'.0.2!I 1601ASK F0f tt40stR ON tunt

// NODAft

  • Note 2 5 tall - M0!$

HrttfA Ntti

!!! t.7.4 :

C0htt0L RODM

// 12/31/93 NAlliAllLlit lMPLtMENT M0t$

Ns.!!ta Wttr Hl471 M TA! Lit CONit0L RDOM REY!tW 12/31/95

  • Note 3 70LLOW7 TO Mf H00t HAftp!

r.8 M (71 MTA! Lilt 0 Nit 0LR00MRtvitW 12/01/92 FOLLOW # TO MP H ON Hist:F2 FFl f !!

MTA! Lit CONit0L RDOM RIVl[W 12/01/t2 FDLLOWJF 10 MFH000 INtit.K00!(i*

.F.:.;

IN!iFDP.ItittiOfthAtC0F:t 12/31/9004/30/91 (0%!N6 SUIC0% Mtitt int!ANttiki*

' 2.4

!W51 FOR Mitti 0F lhnt C0tt 06/05/09COMPLtitt t00LINE-IkfiALL k!!'l !kii int!t.N Fl!ki ;

m4071 Mif.!LCP CON 1FDL RODR t[Vltk 01/05/89 COMPLt1[I FAL0rJ8 10 M8 H 001 Refer to notes on Page 11

, I.l

\\

et Int 60, a

tl't:90

41FttMIK11t IFl !!$pt 6:HtMt Eth@illk PLM1 h8+t

!!DtNWitR flitt/!.lsit!Fil0N

$ lbtt Wtv 6

ti&fu$ 14tt INil H filhi l M H lf!

!!!A!Ltp CONTROL ROM PlV!!W 06/30/H C9MPLtIQ 10Lt0d# 10 FA F008 t!DA'.fNt!

l.t.2.7 FtAni$Ft!CM60ttFElf 42/31/tt!!/31191 IFLtMint[D ifHUNil M N 0?!

!(TAILit (Mit0L PDDR F:Ef!It 05/31/10 6

FDLLOW# 10 FA-F00F LA$tLt.t 1 UAF0?1

!(it! LED C0ntROL t00R LEV!IW $1/30/9008/01/90 FDLt0WLt 10 FtrF006 i

LA$ALLt!

  • l H f?!

DITA!LtDC0hiROLRODEF.IYitW 05/30/900$/01/90 F0n W.T 10 Pf'8 F00$

F*klFI1

!.!J.?

Flui Irt! C0h30Lt FKtY 09/30/tt05/31/t0 JMitMINit!)

R: Rift!

'84101

!!!Aftti Confit 003 RivltW Ot/30/ H C$/31/10 F0ttttui 10 M8A F0,f r:6;!tti

1. ! J. !

Flui $8tl CONB0Lt FL'LLY 09/30/tt(1/31/90 1PFLIMikit) h:6Ull.!

48 8:?!

ItTAllt!' (ONIF A R00R FI'J1tW 09/30lti$!/31/90 FDLt0rs 10 MrA.F006 RlLLifMC1 PF A 4.t il (Wit [D tY SL (3 36 413 3711/15/tt 03/31/90 (NAft 07373 a

plt!t0ht2 68 f r:

!'tfA! Lit (Mit0; R0pp. ItVl[W

// 12/31/95

' Note 3 1% L0 08 10 F M 0(6 P!LLithi:

68 f F1

!!14! Lit COhiFR F:00F ttvitW 1:/71/90 i

FQLLiv $ TV M A F00t P!LLiiONE:

1.!..!

FLRT SFt! CON!0Lt TELY 07/31/ItCtMPLtitt IP,tLIMINTt!

nnt R!it F0 WT : ::.t.4.:.t t0hiAIN !$0L !!FENtA!!Ll!Y it !!/31/tt (4/30/90 nME F:LtF::NT ! Hi-T:0 Ptiti: LID C0 Nit 0L E00r. LIVl[E (6/30/13 FOLLOWU810 FA F0DI N;kE Fltt Fi!NT : :..:.:

PLiiNT (FIS CON!0LE FULLY 01/30/1012/30/90

!MPLir.tkt[0 n:htP!LEIt!v' P :.r: t plig tte tcylp0L ROM FIV1.k 06/30/9312/30/90 FDLLOWJ 10 FA F002 NOTTH m t 1 P8td0' l'!1A!LtD C0 kit 0L R00M It'ltW 1;/31/94 FOLLWF 10 MFA F00t N0LTHANNA0 Mi'80?!

It1Allt) CONTROL 000MF.VltW !!/31/94 F0Lt0WF 10 M8H00%

DCMI!!

III.!.3.4.3 CONitDiR00M Ot/30/ttCOMPLtitt HA!!ii4!LITY!MPLEMENTMODI 0:0 Nil 1 P.8 A 1001 1$COVERIDIVBLL3364$33709/30/81 COMPLtift (N$tt 0737) 0:0Ntt1 M H 06!

[0F 05/23/t900MrttitD OtMIt 1 M8 it71 DtiA!LEDCONTPDLR00Mtty![W 05/31/93 t

FOLLOWS TO FH001 000K![

!l1.t.3.4.3 C0Kil:0L K00?

01/30/M COMPLtitt HAlliAi!LliV!MPLthENTN0!!

000NIE2 MA 10!:

il COVtFit if GL [3 26 4 23 37 09/30/t9 COMFLtitt (N!*It0737) 0 XII l P:N):!

IDF 05/23/tt COMPLiit!

0;Mt! ;

U M (';

IIIA!Lt! CONTEDL tt X tiV!!k 10/31/13 F0a0WF 10 Mr. F001 Refer to notes on page 11

tan he.

?

t1/:4/90 Un!M81tMIki!! iM1 !!$UI $CHIDULt (VALDA110h I'L Ani hhti libut Wel6R f!TLt/!!$0t!!!!0W b it it Nis itAft'$ !4t!

000Mit3

!!!.!>.3.4.3 CMit0LP00M 09/30/ttC04PLtitt hAl!TAl! Lily.!MottMtEl M01's 00 Nit!

MrA40!3 is t06tttt if 6L tb36 4 f3 37 Ot/30/tt COMPLiitt (Nukt$ 0737) 0:0N!!3 M8 A-F0t t (0F 05/23/ttCOMPLiitt Ot06tt}

NFAf(71 DtTA! Lit COW 1ROL ROOM RIVl!W !!/30/92 F%LOWUP 10 MH006 Otlitt CFlif 1 M* A l@t?

15 00Vil:It if $L $3 36 4 t>37 !!/31/09 06/30/90 (Natt$ 0737)

Pr$1[ttt((F1 MF A FPA M 1Allt? C Mit0L R00M tty!!E 10/!!/90 F %LOWUT 10 W A Fo?!

81Lllt!!!

!!.t.i.:.)

f!LitF 4 IAftTY VALVI T!!!

C7/1!/1103/15/90 i

t[0PLf17tttt!FICFIPDFi IAL!!stil PJ! Itt:

il COVttti ly I; ( bst 4 t>37 !!/30/90 tEstIt 07:7i f A;f \\Tff! 1 1.!.0.3 PLf.k1 $f t$ C0k!DLE FULLY 10/30!!!10/31/92

!MPLEMthitt i ALD Vill! !

P.FAFD?!

MIA! Lit C0htth ROM f.IVlty

// completed FOLLOWLt 10 M A F006 FAtt Vill!

1.!..:

PLAhi IF!$ C0h!at FULLY 10/30/0910/31/92 1MPLEM[Nitt FALDVit!!!

M8 A FPJ

!!1A!Lt!' C0KifR IOM t[Vlib

/! Completed FDLtCWUF10M*A-F003 F ALD VIf!!

1.t..?

ILAki litt C0ht%t FL'LLY 10/30/t910/!!!92 19ttMikit!

FR0 VUlf 7

'8& rP1 MTAILit C0 Kit 0L t0CM ttvlts

// completed FOLLOWUt it MF A F00!

f!A;E Mit:P2

!.!.0.;

FtANT$tt!C0K!% TIN $1ALLtt 07/31/90 Fil:WICli:M0 PLAhi $tt! CONEOLE FULLY 07/31/92 IMPLEMIAltD

![Atk I:11M :

t*;4P:

kVt[6 0737 T! (C0Vitti tY 6L !!/31/tt04/30/90 (Ni 8.0 $!4:1 PIA;H trifM 3 1.!'.i.0 FLthi$Fi!C0k$%&IN!fALLit 10/30/09 COMPLit((

tili:Hl'110'!

1.f.!.3 PLAki $Fl$ CON $0Lt FULLY 06/!0/11 IMFitMikitt itACH ttt1M 3 MF t.4072 NUtt$ 073716 (COVit[D [Y FL 12/31/0904/30/90 8216 A@ B342)

Ntly 1 MFAF071 Mit.!LtD C0hTFDL ROOM ttVl[W 01/30/91!!/30/90 F0;LOWUP 10 MF A F00t FIL6 tit 1.F.2.3 PLANT Siti CONS 0Lt FULLY 12/3!/9907/31/90

!MPLEMEKitt FIL6f1P WAF071 MTA! Lit C0 Wit 0L R00M Riv!!v 03/31/t1 FOLLOWUP 10 MFA F000 F0!Ni !!#04 !

1.1.2.3 PLANT $FM CONT %t FULLY

// 07/11/91 IMFttMENitt F0!N1 lIA:H 1 MtA F(?!

NTA! Lit CONTROL f.0M IIV!!W !!/31/9312/21/90 FOLLOWUP 10 MPA F008 P0lki!!A!v2

!.t.2.!

Pli.h1 $f t$ COW!Mt FULLY

// 07/31/91 IMettP.thitt

![!K1lif!H2 9AFC71 M1AlltD C0W1ROL R00M tivltk 12/31/93 12/31/90 FOLLOWUP 10 M' A F002

e Put he, t

t1/;4/90 UnlMPLIMin't!' hl It$'I $tHtt'J.! (Vatt*tIDW J

PL Mi hAMI

!!$Ut WPIU 11TLt/Ntlt!FiltW M949 Ntt 514105 0Att FR&lt!! !$th? !

MI M 071 NTAILill(ONTROL ROM ktV!!W !!/31/96!!/31/90 FOLLOWJP TO MFA F000 FEA!F!t !$LAht 2 Mf M 071 NTA!Lt) C0kTROL RDOM htV!!W 12/31/9612/31/90 F0iLOWuf 10 MFA F00t 0;4tt!!!!!!

II.F.i.

IN!1 Fl* Nitti 0F lh4!' C0tt 01/31/91 t00L!n6 !Wl1ALL AWL Ikil DUA)Clf!!!!

MI N 071 N TAILit CONTROL ROOM Rivl!W 01/30/91 FOLLOWp 10 MF H 006 034 Clf!!i.'

!!.F.I.4

!k!1 F0F MitCT OF thAD CORE 12/31/91 (0OL!k H k! TALL Att't ! Nil Dutt Cll!!! :

VI F07!

!!TA! Lit 00EttDL ROM REY!!W t!/30/90 F itivu810 MF A F00t F.wMDtit0

!!.F.O.(

!stifoitrit:ter!NAtC0tt

!!/31/P9 no date

  • Note 4 (00tlkt !NIVALL A!P't lk!1 flWM0!!!!

Il!.t.3.4.!

(00t0LF00*

0!/30/39 no date ' Note 4 Millfillt:1V !MFitMINT M0tl FA O : litt rn M?)

It1FILt! C0 kit 0L 000M Rivlth 04/30/91 no date ' Note 4 F0. LOW. 10 M8M00!

Milk!0n

!!).l.3.4.3 CONTFDL t00?.

12/31/90 NA!!1t!!L!1y !MPLIMINT M0t!

I:l!N!M PFi l?!?

!! C0i'iti! fY ft 13*364133706/30/t9(4/30/90 (08t60737)

I:lik!0%

M8 A R*!

Mif!Lt! C0KTKOL ROOM F.[V![W !!/31/91 FDL'.06Ut 10 MFH00$

ft;t?!

1.t.*.3 FLAni Itt! CON 50Lt FULLY 03/30/90 l9.trtht!!-

EAL!r:

!!.I.3.8 F A! ttui Mt! (LL CAT i) 03/10/90

!Atr:

!!.F.2.

Ik!T F05 N TICT OF 1hAD Ct+t

// 10/31/90 000.!k H cPC00L Mtift

!A'tr!

E8 M (!3 15 00ittil' !Y 6L (3 36 4 63 37 09/30/ft 03/31/90 (NU8.It0737)

! ALIT. !

$4 FDi!

1!

10/30/t9 COP #Ltil!

I A'.t? 1 C H 071 NTA! Lit C0hTROL RtiDM ttvltu 01/31/9203/31/92 FOLLOW F 10 M8A F00f SAtte2

!.!.0.3 Flint $Fr! COW 50Lt FL'LtY 03/01/9003/30/90 IMPLEMihi!D IAttM2

!!.l.:.

FAl PLui M0t! (LL trit I) 03/30/90 talte ;

ll.F.:.;

IW!! FM Mitti 0F Inti!> cott

// 03/30/90 000L!hMUK00L M!TIR tAttP2 MI M 0f3 18C0Viitt!Y6L(3364633709/30/R910/31/91 (WRil07371 EALIP2 MFAF063 T!C 10/30/99 COMPLiitt,

$4'.[M2 MI M 071 IttA! LID CONTROL 000M REV!!W 03/31/9106/30/91 FDLLOWF 10 MFH00t

$ ANON 0ft!!

D.4.!

00FTFIF 09/30/91 COMPLtitt f u OOFFI !

!.P.O.*

Ftt,W1 SFl<t CONS 0Lt INSTALLED 06/30/9302/09/93 tu OCFLt 1 1.1.2.7 PL41 $Fil CON!D't FL'LLY 06/30/93C2/(9/93

!"it!P! Kit!

$4 00FLt !

!!.F.:.;

IKi1 t!F MitCT OF INAt C0tt 12/01/!902/09/93 000;!hHt!tDitti Refer to notes on page 11

d f4p u.

I t!!:4 tp Uh!PritMtwitD fel l$$U! $lHI!1.t (VALWilp 1137 but 1t$U! WMitt flittIlit$ttif f!M 6 It tt NtW 11 Alp 6 Hit

$nntort!!

II.F.2.4 IWlf FOR Pit!CT OF lliA!' CORE 09/30/9102/09/93 C00LIN6 install AfD't INil IM 00FRt i 111.F.3.4.3 C> TROL RDOM 06/30/9302/09/93 HiliAllitiV lMPLtMlWT M305 IM 00FFi 1 M8A f071 PitAILit 00 hit 0L RDOM RIY!tu 06/30/9302/09/93 F0; LOW # 10 MtH00t lE DNOFFI 2

!.D.2.3 PLui $tt! C0tt0;t FULLY

// 01/31/92 IMPLEMIWitt

$3 COfft 2 Mt H 071 b(1Allti 00 Nit 0L ROM tiV!!W 12/31/91 FDLLOW# 10 M!ie F006 96terft3 1.t.:.:

rtat $ Pts t0x60;t rUat

// 01/31/t:

IMPLEMtWitt LANth;rl!

MI N 0'l ttfA!LitC0kif0LI:00Mt[V!!W 07/!!/t:

FOLLekt'P 10 MFH006

!!Al8'F 1 1.!..

PLET $P!$ CW!DLE FULLt 0!/ll/fl IMFitMINT!I

$tA!!:;l 1

!!!.8..!

UF6MDt IFIF Att!Nt$$ UPiti!! 09/!0/$9COMPLtit!

letti!CY t;ns TO Alf tht!! E 10tFt5(

![Al*G 1

!!!.!.?.4.3 00 kit 0L K00R 09/30/t902/1$/91 hillfAi!L!1t lMPLEMthi C DI

!!DJN 1

!.t.:.3 PLui !Fi$ COWbtLE FULLV 07/31/10 IMPLinthilt

!!0s:W; WAl.013 15 00VtFIt lY 6L 13 314 63 37 05/31/tt COMPLET!t IWWI607:7)

!!DsN 1 MF H (71 DETA! LED t hTF R t0 3 I!vilW 10/31/93 F030k# TC PFH00t

!!D'.N 6 1.!..3 PLIXT $101 C0k!0't FultY 1C/!!/90 1MPLEMtWitt

!!0pMF:

9 H 0t?

16 COVittt lY 6L t 36 6 (3 37 05/31/B9 COMPLtitD (NUFt6 0737)

!!LL';9

  • Mf M 071

((TA!Liti C0Kifa LD;M I,[V!!W 10/21/93 FDLLOW# TO MFH006

$Q8tka 1.t.2.1 PLui $Fil C0h!Dit tittt!F110W 10/15/tt no date ' Note 5

$H0Pim 1.15. :.

PL ui $FC$ CON $0LE INSTALLit 08/31/90 no d8te ' Note 5

$ctim 1.t.2.3 FLui$FISCONSOLEFU;ti 08/31/90 no dote ' Note 5 1MPLEMthi!D SCFim MF M 071 tilfAlltL CONTEDL R00M f tV!!W 08/30/90 no date ' Note 5 FOLLOWUt 70 MFH000

$1 LL'Ut !

MF H 071 ItfA! Lit 00 Nit 0L 000M kivltu 12/30/90 FDLLOW # TO MP H 000

$f LL'Ut 2 MF M 071 t'ITAlltD COWit0L ROOM Rivl!W 12/30/90 FOLLOOP TO MFM00t

!#f.I8.1

!.t.2.3 fini tit $ CON $0LE FULLY 09/30/9006/31/90 IMPLEMEWitt

[#b 1 MFt-r071 tilfiillt!. 00 Kit 0L ROM ttVltW 12/31/94 FOLLOW # 10 Mt H 009

!JF 8

  • 2 9t-F071 Otti.!Ltt CONTFDL ROM F:Ev!!W !?/31/94 FOLLOWUF 10 MF M 00!

1RDA 9 N 071 I(fallt! C0 Kit 0i LOM ttvilW 09/30/10 FOLLCW# 10 prl.F00!

Refer to notes on page 11

e 4

Fett he.

10 01/4/90 Un!MPLIMtWitt IRI 1$5UI $;Hll' ult IVALUA110N Flut htMt

!!$st NJmlitt fifLt/MSCt!I110N

$ it it hit

$1AfD$ DAtt tuuttFt!W13 1.t 2,3 PluiSt!'lCON$0LtFULLY 07/31/tt04/30/91 lhtttMiki!!>

TUfftVP0lki3

!!.t.!.t.1 ICLitF 4 6Affir VALVI titt 07/31/tt06/30/10 Pt0FtM15 Fit!TitR[t0t1 TUM!riClki4 1.t..3 l'LAhi $Pfl CON $0Lt FULLY 07/31/$904/30/91 IMPLLM(Etti TUR[iPClWT4

!!t'.l.?I RIL!!F46AFlifVALVIt[li 07/31/tt M /30/90 tt0 71M1 $t!CIFlt ktf t*1 VitM?nttutt!

!.t.:.2 PLM1 SFil (0W50Lt lkl1Atttt 10/31/90 COMPLiitt VilM0htTANrit

!t.:3 PLM1 $ttS CDN$0Lt FUltY 10/31/90

!PPLEMIh1[I vit.RON1 tant!

Mis FPI l'tf allit t0 kit 0L E00t try!!6 10/!!/90 FOLLOWUt 10 MF A-F002 Clitt i E'A F(?1

!!TAllti (thit0L 100P ((Vitt 10/31/90 TOLLOWL'F 10 MT A-F006 Wif.!2 m'af(71 I!1Alitt (0 hit 0L ROM livlit 10/31/t0 FOLLtWUP 10 MF A F00t W0 HAF(?)

P!1A! Lit t06100L ROM fivlte Ot/30/90 FOLL0Wut 10 MrA F00t

!!DA1 M A l.lI 15 00h'Ittt FY 6i 83 26 4 !? 37 !!/30/it 03/11/90 (WJf'It 0737:

!!DN 2 P.iA Ft'!

IlfA! Lit (0 kit 0L F:0 M tiv!!6 01/30/l9 04/30/91 FOLLOW?' 10 M*A F00t

!!h !

eta 1lt3 18 COV[Itt if St $! ti 4!!3711/30/1907/15/90 (NLit! 0737)

!!M :

P'ttM1 ftTA! Lit C0ETROL IOM ltvltu M/0;/90 09/30/11 FOLLCWJ810 Mr A-F006 Completed means item was determined to be fully implemented at the particular plant or the staff found acceptable technical alternatives proposed and implemented by licensees.

O t

L page 11 Nott 1:

The original list of 254 items has been increased by the addition of one issue, Issue number !!.D.1.3, Block Valve Testing,* for ft. Caltcun. The staff's review conclud(d that the valve testing dita previously referenced by the licensee was for valves that are not similar to the Ft. Calhoun block valves. The licensee has connittec to test similar valves by December 31, 1990.

t Note 2:

The licensee is evaluating procedures to establish pump seal cooling following loss of offsite power; however, an implementation schedule has not teen est:blished.

Note 3:

The licer.see's proposed schedule for resolving human engineering l

discrepancies has not yet been evaluated by the ISAP integrated 4

implener.tation schecule process; thus this date may be subject to i

change.

Note 4:

The licer.see's letter of 11/29/65 indefinitely suspended all schetular commitments in conjunction with the licensee's decision to i

ceest tr(retions at the facility.

Note 5:

The lictr.see's letter of 9/27/89 indefinitely deferred implementation of these items in conjunction with the licensee's decision to decom.

missicn the plant.

l P

t l

s i