ML20012D906

From kanterella
Jump to navigation Jump to search
Advises That 891221 Submittal of QA Program Changes to Updated FSAR Consistent W/Provisions of 10CFR50,App B & Acceptable
ML20012D906
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/16/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9003290075
Download: ML20012D906 (2)


Text

L i

Dock'et No. 50-266 VAR 16 i?M Docket No. 50-301 L.

Wisconsin Electric Power Company i

ATTH: Mr. C. W. Fay i

Vice President Nuclear Power I-

. 231 West Michigan Street - P379 1

Milwaukee, W1 63201 Gentlemen:.

Thank you for your 10 CFR 50.71(c) subn.ittel dated December 21, 1989, which I

incorporated changes to Section 1.B of your updated Final Safety Analysis j-Report regarding your Quality Assurance Program description. We have reviewed your updated program and_ have determined that it continues to ineet the

~i requirements of 10 CFR Part 50, Appendix B, end is therefore acceptable.

If there are changes to QA cone 11tneents existing in docketed correspondence outside of the FSAR QA prograu description, you are obliged to notify this

office, e

We appreciate your timely subniittal of information required by 10 CFR 50.54(a) and10CFR50.71(c).

Please contact Mr. Monte Phillips of my staff at 708/790-5530 with any questions you have regarding this matter.

Sincerely, ORIGINAL SIGNED BY GEOFFREY C. WRigNI Geoffrey C. Wright, Chief Operations Branch cc:

J. J. Zach, Plant Manager DCD/DCB(RIDS)

Licensing Fee Management Branch Resident Inspector, Rlll

+

Virgil Kanable, Chief' Boiler Section Charles Thonoson, Chairman A

Wisconsin ?ublic Service Consnission a

R.I.Braund(SLO),

l 4$4 W1 Div. of Ernergency Government t

-o a.

Teri L. Vierima, Chief "S

Radiation Protection Section kg WI Departnent of Health and Social Services Division y,

80 of Health 88 J. Spraul, LQAB, NRR c44 W. Swenson, LPM, NRR g

i ps J w

rgt 3//( /90 3////90 3/W/90 3//4 /90 g'

.