ML20012D825

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Rept 50-245/89-19 for Meeting 90-20 on 900301 in King of Prussia,Pa.Conclusion That Addl NRC Review of Addl Concerns Noted in NRC Appropriate Based on Discussions & Presentation Noted
ML20012D825
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/19/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20012D826 List:
References
NUDOCS 9003280419
Download: ML20012D825 (2)


See also: IR 05000245/1989019

Text

%.

1

,

t

li

k.

- '.

t

.?

3.-

.

IAAR 191990

,

Docket-No. 50-245

' Northeast Nuclear Energy Company

m

ATTN:, Mr. Edward 'J. Mroczka.

Senior Vice President . Nuclear

, _

Engineering and Operations Group

>

P. O. Box,270

Hartford, Connecticut 06101 - 0270

s

Gentlemen:

p

Subject: Meeting No. 90-20 on NRC Inspection-Report No. 50-245/89-19

L

? Attached is the report on the management meeting held on March 1, 1990, at the

Region'I Office, King-'of Prussia, Pennsylvania, on the Millstone 1 Emergency-

.

Operating Procedures.

The meeting was conducted by myself with members of your

,

l

staff. . The purpose of the meeting was to discuss the Unresolved Items docu-

J

mented:in:Section 3 and.4 of--our Inspection Report No. 50-245/89-19, and the

I

additional: NRC concerns documented in our letter of February 15, 1990. On the'

,'

basis of your ~ presentation' and from discussions held with your staff during the

meeting, we have concluded that additional NRC staff review of these concerns

'

~is appropriate.

In-accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-

- !

-

-

-this letter and its enclosure will be placed in the NRC Public Document Room.

!

Should you hav'e any-questions regarding this report, please contact Richard

1

Conte at- 215-337-5210,

i

i

Sincerely,

orictr.nl n m; t y

,

1

i

Marvin W. Hodges, Director

~

Division of Reactor Safety

Enclosure: Meeting Report No. 90-20

(NRC Inspection Report No. 50-245/89-19)

q

,

cc w/ encl.:

W;-D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D.'O. Nordquist, Director of Quality Services

l

'

R. M. Kacich, Manager, Generation Facilities Licensing

D. B. Miller, Station Superintendent, Haddam Neck

- Gerald Garfield, Esquire

l

Public Document Room (PDR)

d

'

,

Local Public Document Room (LPDR)

/p\\\\\\

b)E%'off oly"?Myj

'

i

m

'

,

t

'll

'

,

c A.

..

.

'.

. Northeast Nuclear ~ Energy Company

_2

,

cc w/ encl.-(cont'd.):

NuclearSafety.Information. Center (NSIC)

-NRC Resident Inspector

State of-Connecticut

bic w/ enc 1:

!

Region I Docket. Room (with concurrences)

-

Management Assistant,_DRMA (w/o enc 1)

i

M. Boyle, LPM, NRR

G. Thomas, NRR

B. Jones, NRR~

- Robert Jones, NRR

Michael Boyle,-NRR

' George. Thomas, NRR

John Monninger, NRR/SPCB

,,

Jack Kudrick, NRR/SPCB.

,

D. .- Haverkamp ,' DRP

"

DRP Section Chief

W.' Raymond, SRI, Millstone

J. Shediosky, SRI,-Haddam Neck

' Richard Conte, Chief, BWR Section, DRS

.!

Carl Sisco,.0perations Engineer, DRS

Brian Hughes, Operations Engineer, DRS

-. Donald Florek, Senior Operations Engineer, DRS

'Tracy Walker, Senior Operations' Engineer, DRS

-

Reactor Projects (DRP)

,

Tony Vegel,iReactor Engineer .DRP

Doug_Dempsey, Resident: Inspector

.0L: Facility File

DRS Files (3)f

.

l

DR'S:RIGD-

'

'

'

DRS:R

DRS:

DRSiRI

L

Sisco/dmg

-g Co

e

Gallo

- Joh ston

Hodges

?

3/6/90

gg

3[jg

'

0FFICIAL RECORD COPY

SISC0/MILLST. 1 MTG./3/6/90 - 0001.0.1

03/06/90

i

J'

,

_