Advises That All Licensees Must Make Arrangements to Install Neutron Flux Monitoring Instrumentation That Conforms to Requirements of 10CFR50.49 & Reg Guide 1.97.Plans Re Subj Matter Requested within 45 Days of Ltr Receipt
ML20012D088
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/16/1990
From: Shiraki C
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML20012D089 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-67923, NUDOCS 9003260441
Download: ML20012D088 (2)


Text

'

~

c March 16, 1990

']

Docket No. 50-354 TR LTFON w/ enclosures:

!NRC~PDR~~7 Tr5 M0'Brien I

4 Mrb Steven E. Miltenberger CShiraki Vice President and Chief Nuclear Local PDR SBrown Officer.

PDI-2 Reading:

OGC' Public Service Electric and Gas SVarge EJordan Company '

BBoger ACRS(10)

Post Office Box 236 WButler BMarcus Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

POST 4CCIDENT HEUTRON FLUX MONITORING FOR BWRS (TACNO.67923) i 1

RE:

HOPE CREEK GENERATING STATION t

Pegulatory Guide (R.G.) 1.97 and 10 CFR 50.49 require that neutron flux be monitored by Category 1: instrumentation. The staff has' allowed BWRs to operate with existing instrumentation until instrumentation was developed that-conforms to the requirements of 10 CFR 50.49 and the associated R.G. 1.97.

The instrumentation is now available.

TheBoiling)WaterReactorOwner'sGroup(BWROG)submittedaLicensingTopical-Report (LTR titled " Position on NRC Regulatory Guide 1.97, Revision 3, Require-ments for Post-Accident Neutron Monitoring System," dated April 1,1988. The-enclosed letter and SER find the BWROG position unacceptable.

Therefore, all licensees must make arrangements to install neutron flux monitoring instrumentation that conforms to the requirements of 10 CFR 50.49 and R.G.

1.97.

Please advise us of your plans in this respect and the associated schedules within 45 days of your receipt of this : letter.

Sincerely,

'/s/

Clyde Y. Shiraki, Project Manager 9003260441 900316 y

Project Directorate I-2

[DR ADock 05000354 Division of Reactor Projects I/11 PDC L-Office of Nuclear Reactor Regulation

. s

Enclosures:

1.

Letter 2.

SER~

I cc w/ enclosures:

See next page

[ MILT]

g 9

PDI-2/PM PDI-2/D O

J

/9p0f CShi aki:mj WButler 4/

3 // {/90 -

/

/90 i

t_

a

>$ " 2%

$6,,

UNITED STATES

,[g 3 f, n

NUCLEAR REGULATORY COMMISSION

,/j 5

WASHINGTON, D. C. 20665 March 16, 1990

....+

Docket No. 50-354 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas l

Company l-Post Office Box 236 j

Hancocks Bridge, New Jersey 08038 l

Dear Mr. Miltenberger:

i

SUBJECT:

POST-ACCIDENT NEUTRON FLUX MONITORING FOR BWR$

(TACNO.67923)

RE:

HOPE CREEK GENERATING STATION Re9ulatory Guide (R.G.) 1.97 and 10 CFR 50.49 require that neutron flux be I

monitored by Category 1 instrumentation. The staff has allowed BWRs to operate with existing instrumentation until instrumentation was developed that conforms to the requirements of 10 CFR 50.49 and the associated R.G. 1.97.

The instrumentation is now available.

The Boiling) Water Reactor Owner's Group (BWROG) submitted a Licensing Topical Report (LTR titled " Position on NRC Regulatory Guide 1.97, Revision 3, Recuire-ments for Post-Accident Neutron Monitoring System," dated April 1, 1988 The enclosed letter and SER find the BWROG position unacceptable.

Therefore, all licensees must make arrangements to install neutron flux monitoring instrumentation that conforms to the requirements of 10 CFR 50.49 and R.G.

1.97. Please advise us of your plans in this respect and the associated schedules within 45 days of your receipt of this letter.

Sincerely, a.

Clyde Y. Shiraki, Project Manager Project Directorate 1-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation 1