Forwards NRC Understanding of Current Status of All Unimplemented USIs for Plant,Based on Review of Util 891128 Response
ML20012C869
Person / Time
Site: Fort Calhoun 
Issue date: 03/15/1990
From: Bournia A
Office of Nuclear Reactor Regulation
To: Gates W
OMAHA PUBLIC POWER DISTRICT
References
REF-GTECI-A-02, REF-GTECI-A-44, REF-GTECI-A-46, REF-GTECI-A-47, REF-GTECI-EL, REF-GTECI-RV, REF-GTECI-SC, REF-GTECI-SY, TASK-A-02, TASK-A-2, TASK-A-44, TASK-A-46, TASK-A-47, TASK-OR GL-89-21, NUDOCS 9003260026
Download: ML20012C869 (4)


Text

f' March 15, 1990

[bo'cletN'o.50285 Mr. W. Gary Gates Division Manager. Nuclear Operations Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 i

Dear Mr. Gates:

SUBJECT:

UNIMPLEMENTED UNRESOLVED SAFETY ISSUES AT TORT CALHOUN STATION On October 19, 1989 the staff issued Generic Letter (GL) 89 21 which requested information concerning the status of implementation of unresolved safety issues (USIs)atyourfacility. Based on your response to this GL dated November 28, i

1989, our review of Agency records and discussions between your staff end the NRC Project Manager, the NRC staff has compiled the enclosed list representing its assessment of USI implementation. These results were presented to the Cornission at a meeting on February 14, 1990.

1 The enclosure to this letter presents the staff's understanding of the current i

status of all unimplemented USIs for the Fort Calhoun Station. The staff 1

encourages your effort to coirplete the unfmplemented USIs.

If you hn e qutstions or consents about the encloced information please contact meat (301)4921345.

Sincerely,

/s/

Anthony Bournia, Project Manager b.

Project Directorate IV Division of Reactor Projects. III, n

IV, V and Special Projects n$h.

Office of Nuclear Reactor Regulation E8" oo

Enclosure:

88 As stated a

cc w/ enclosure:

om See next page 7

DISTRIBUTION:,

m To'cVeT M U NRC PDR Local PDR 88 PD4 Reading G. Holahan MS 13E4 F. Hebdon "a P. Noonan A. Bournia 0GC-Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P.315 PD4 Plant File K. Eccleston PDT[PF'"":PDT

~~~i~"~~~

~ "~ ~~~~ T

~

FFF'lFDT/E ~ ".....:.........:. 4 6...~ :. /

,....:.~........:..........:............:.........

NAME :PNoonan

ABournia:bj :FHeb on DATE :03/6 /90
03////90
03/ir/90

~~~~~~~~'DWitTAE kitbhb~1D)T" ~ "~ ~"" "~ b'o cumchY Ifoisel"TU DR7UST""~ " ' ~~

D Fb t 4i

>m n:g'g

/-

UNITED STATES l

I NUCLEAR REGULATORY COMMISSION e

[

,j wasmWGTON,0, C. 20t45 n

%..... p' March 15,1990 Docket No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 1623 Harney Street l

Omaha, Nebraska 68102

Dear Mr. Gates:

SUBJECT:

UNIMPLEMENTED UNRESOLVED SAFETY ISS*JES AT FORT CAUiOUN STATION i

On October 19, 1989 the staff issued Generic Letter (GL) 89-2) which requested inforn:ation concerning the status of imp 1wentttion of unresolved safet/ issues (USIs) at your facility. Based on your respons,e to thics CL dated November 28, i

1989, our review of Agency records and disct'ssions between your ttaff and the NRC Droject Manager, the NRC staff has comp 1Dd the encloted list representing its assessment of USI inplementation. These-ro uits wern prn ented to the Conwistion at a meeting.on Fet:ruary 14, 1990.

The' enclosure to this letter presents the staff's understinding of the current status of all ar. implemented USIs for the Fort Calhoun 5t nlon. The staff encourages your effort to complete the unimplemented USI a.

If you have questions or comments about the enclosed information please contact meat (301)492-1345.

r Sincerely, G

bm Anthony Bournia, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page l

=

,,4-i

~

Mr. $. Gary Gates Fort Calhoun Station Omaha Public Power District Unit No. 1 L

v CC:

Harry H. Voigt Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.

20036 4

' Mr. Jack Jensen, Chairman Washington County Board i

of Supervisors L

Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Pegulatory Commission P. O. Box 309 3

Fort Calhoun, Nebraska 68023 Mr. Chwrles 9. B>inkman, Haneger Washington Nuclear Operations Combustion Engineerinp Inc.

- 12300 Twiabrowk P rkwcy, Suite 330 Ruckvin e, rh 2065?

Regional Mainittrctor, Region IV U.S. Suclece Regulatory Commicsion Of fice of f.xecutive Director for Operations 611 PJan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 6B509 Mr. G. R. Peterson, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 6B023 l

1 i

i b

I, _ * '*

l Enclosure Estimated Implemented USI TITLE Date Remarks A-2 Asymetric Blowdown TBD By March 15, 1990, Loads on Reactor the licensee will provide a schedule for resolution as part of their on-going Design Basis Reconstitution Project.

A-44 Station Blackout 03/31/91 SER Pending A-46 Seismic Qualification of

.03/31/93 Avaiting supplemental Equipment in Operating SER and SQUG guidance Plants A-47 Safety Imr11 cation of TBD Na; Recuirement.

Control Systems LWR Responte cue by Nuclear Power Plants 03/31/90.

O