ML20012C488
| ML20012C488 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/14/1990 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20012C489 | List: |
| References | |
| NUDOCS 9003220065 | |
| Download: ML20012C488 (3) | |
See also: IR 05000483/1989024
Text
p
1
[v
,..
t
.c,
.N
-c
o
.
g
I
I
MAR 14 1m
i
Docket No. 50-483
Union Electric Company
!
ATTN: Mr. Donald F. Schnell
'
Senior Vice President - Nuclear
,
Post Office Box 149 - Mail Code 400
'
St. Louis, MO 63166
Gentlemen:
This refers to the special safety inspection conducted by an NRC Emergency
Operating Procedure Inspection Team of this office on January 22 through
p
February 2, 1990 of activities at Callaway Nuclear Power Plant authorized
by NRC Operating License NPF-30 and to the discussion of our findings with
Mr. W. Campbell and members of your staff at the concim 'n of the inspection.
The purpose of this inspection was to verify that your E0Ps are technically
correct; that.their specified actions can be accomplished using existing
equipment, controls, and instrumentation; and that available procedures
have the usability necessary to provide the operator with an effective
operating tool to place the plant in a safe shutdown condition. The
conclusion of the inspection team was that all of these criteria had been met.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during this inspection;
however, we do request that you respond within 30 days of the date of this
letter to the open items identified in the attached inspection report. While
we realize you are addressing those issues as a result of an internal audit,
these actions should be assessed to assure they cover the specific concerns
identified during this inspection.
The areas of concern are weaknesses in
licensed and non-licensed operator training, equipment labelling, and the
Procedures Generation Package. We were impressed with the conscientious
effort put forth by your staff to make the E0Ps as useful as possible to the
operators. This effort is to be commended.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The response directed by this letter is not subject to the clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
,
9003220065 900314
ADOCK 05000483
Q
/EG/
,
Y
'
+-
,.
l
V,nion Electric Company
2
I 4 Id30
1
If you have any questions concerning this irispection, please contact
j
i
Mr. R. A. Hasse at (708) 790-5595.
Tom O. Martin for
.,
p
Hubert J. Miller, Director
!
Division of Reactor Safety
>
Enclosure:
Inspection
,
Report No. 50-483/89024(DRS)
'
cc w/ enclosure:
G. L. Randolph, General Mana9er,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
Tom P. Sharkey, Supervising
Engineer, Site Licensing
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey-
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
CFA, Inc.
Gerald Charnoff Esq.
Thomas Baxter, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
W. Rep.n, LHFB, NRR
G. Grrietti, LHFB, NRR
l
l
I'
I
RIII
RIII
RIII
RIII
RIII
RIII
RIII
RIII
SEE
FOLLOWING PAGE-------------------------- g
....____..___.---
Hasse/cg Hopkins
Brown
Phillips Hague
Wright
Martin
Miller
3/ /90
3/ /90
3/ /90
3/ /90
3/ /90
3/ /90
3/ /90
3/f(/90
l
N
s-
s
Union Electric Company
2
!
If you have any questions concerning this inspection, please contact
.
Mr. R. A. Hassee at (708) 790-5595.
l
Tom O. Martin for
l
Hubert J. Miller, Director
Division of Reactor Safety
Enclosure:
Inspection
Report No. 50-483/89024(DRS)
,
cc w/ enclosure:
G. L. Randolph, General Manager,
Nuclear Operations
-
J. V. Laux, Manager Quality
'
Assurance
Tom P. Sharkey, Supervising
'
Engineer, Site Licensing
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
CFA, Inc.
'
Gerald Charnoff, Esq.
Thomas Baxter, Esq.
R.
A.' Kucera, Deputy Director,
Department of Natural Resources
W. Regan, LHFB, NRR
G. Galletti, LHFB, NRR
,
!
'
I @ ,RI
RIII
RIII
RIII
l
I
RIII
RI
-
a e/cg Hp$nsd rN
WI1111
a'b
'Wifh
"
M
in
Miller
3//J/90
3/n/90
3/6/90
3//J/90
3//J/90
3/gy90
3/0 /90
3/ /90