MAR 131990
i
Docket No. 50-461
>
Illinois Power Company
e
i
ATTN:
J. S. Perry-
Vice President
Clinton Power Station
Mail Code V-275
P. 0. Box 678
'
Clinton, IL 61727
,
Gentlemen:
This refers'to the NRC's Systematic Assessment of Licensee Performance (SALP 9)
Report-for the Clinton Power Station and our meeting of January 26, 1990, which
discussed in detail the contents of the report and your written comments dated
February 23, 1990 relative to the report.
'
Based on our in-depth discussions during.the meeting and our thorough review
and evaluation of your letter, we have reached the conclusion presented in the
enclosed meeting summary for_the Final SALP Report. With the incorporation of
the enclosed revised page, the' Initial SALP Report should be considered to be
the Final SALP Report.
It is also noted that with this revision my
' previous letter dated January 5,1990, forwarding the Initial SALP 9 report,
should have read that Clinton Power Station was in outage conditions for 201
days of the 14 month assessment period.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
-Title 10, Code of- Federal Regulations, a copy of this letter with the
referenc'ed enclosures, will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have questions regarding
the Final SALP-Report, please let us know and we will be pleased to discuss
-
them with you.
-Sincerely,
Dr3cInni nicnod by
2. Dat Dula
A. Bert Davis
Regional Administrator
'
Enclosures:
,
'1.
Final SALP 9 Report
No. 50-461/89001
2
Revision sheets
.3.
Revised Page.to SALP Report
4.
Licensee Response Ltr,
dtd February 23, 1990
De_ Attached Qis.tribution f
pd
OO
er
K
nman
lier
us
e
lo
s
D
b Ok0
h
9003200353 90n333
n.
ADOCK 05000461
l
'
'O
L :t .
u
.
. -
-
- .
. - - - -
- -
- - -
.
a
,
q!
. ce .
. .
,
F
- .
i
Illinois Power Company
2
MAR 131990
1
Distribution
cc w/ enclosure:
J.' Cook, Manager, Clinton Power Station
F. Spangenberg, III, Manager -
Licensing and Safety
DCD/DCB(RIDS)
~ Licensing Fee Management Branch
Resident Inspector, RIII
J. McCaffrey, Chief, Public
Utilities Division
H. Taylor, Ouality Assurance
Division, Sargent & Lundy
Engineers
Patricia O'Brien, Governor's
Office of Consumer Services
S. Zabel, Esquire Schiff, Hardin,
& Waite
L. Larson, Project Manager .
General Electric Company
Chairman, DeWitt County Board
Illinois Department of
Nuclear Safety
J. M. Taylor, EDO
T. E. Murley, NRR
K. M. Carr, Chairman
T. M. Roberts, Comissioner
l
K. C. Rogers, Comissioner
J. R. Curtiss, Comissioner
F. J. Remick, Comissioner
J. B. Hickman, NRR Project Manager
.
J. W. Craig, NRR Director, Project Directorate III-2
j
l
J. Lieberman, Director, Office of
L
Enforcement
i
A. T. Gody, LPEB, NRR-
1
i-
J. F. Wechselberger, HRR
4
RIII PRR
i
!
State Liaison Officer, Stete
l
L
of Illinois
i
INP0
l
L. A. Reyes, RII
i
L. R. Greger, RIII
l
M. J. Pearson, RIII
l
L. L. Cox, RIII
RIII Files
L
'
,
s
9
e
i
Clinton Power Station
A.
Summary of Meeting with Illinois Power Company
The findings and conclusions of the SALP Board are documented in
Report No. 50-461/89001 and were discussed with the licensee on
Janua ry 26, 1990, at the Clinton Visitors Center, Clinton, Illinois.
While the meeting was primarily a discussion between the licensee
and NRC, it was open to members of the public as observers.
The following licensee and NRC personnel were in attendance, as well
as the noted observers.
Illinois Power Company
W. J. Kelley, Chairman and Chief Executive Officer
J. S. Perry, Vice President
J. G. Cook, Manager, Clinton Power Station
F. A. Spangenberg, Manager, Licensing and Safety
R. E. Campbell, Manager, Quality Assurance
R. D. Freeman, Manager, Nuclear Station Engineering
J. A. Miller, Manager, Scheduling and Outage Management
R. E. Wyatt, Manager, Nuclear Training
J. F, Palchak, Manager, Nuclear Planning Support
D. L. Holtzscher, Director, Nuclear Safety
J. D. Weaver, Director, Nuclear Licensing
R. F. Phares, Supervisor, Licensing Operations
S. P. Hall, Director, Nuclear Program Assessment
D. R. Morris, Director, Plant Operations
S. E. Rasor, Director, Plant Maintenance
C. L. Baker, Director, Plant Support Services
R. W. Morgenstern, Director, Plant Technical
D. W. Miller, Director, Plant Radiation Protection
'
K. R. Graf, Director, Operations Monitoring Programs
R. L. Ehnle, Director, Industrial Safety
A. L. Ruwe, Director, Systems and Reliability Engineering
R. T. Kerestes, Director, Engineering Projects
T. R. Chistester, Director, Design and Analysis Engineering
E. B. Vaughan, Director, Operations and Maintenance Support Engineering
J. W. Pruitt, Director, Programs and Administration
D. W. Waddel, Director, Emergency Response
J. M. Gruber, Director, Outage Planning and Scheduling
D. M. Antonelli, Director, Operations Training
T. S. Palmer, Director, Maintenance and Technical Training
C. W. Bell, Director, Material Management
C. E. Elsasser, Director, Outage Maintenance Support
R. B. Gill, Director, Nuclear Projects
J. A. Brownell, Project Specialist, I&E
R. D. Frantz, Staff Engineering, I&E
2
)
'V
'O
-
<
..
'-
.o
,
i. -
~
T. S. Arnold, Staff Engineer, I&E
'
K. L. Jones, Principal _ Assistant to the Vice President
-;
g
F. Beaman, Supervisor, Public Affairs
"
'
F. C~ Edler, Director, Plant Support Services
,
b
P. D.;Yocuum, Supervisor, Operations
D. Smith, Supervisor Security
.
Nuclear Regulatory Commission
9
A. Bert Davis, Regional Administrator
E
E. G. Greenman, Director, Division of Reactor Projects
-R. C. Knop, Chief, Reactor Projects Branch 3
_
F
M. A. Ring, Chief, Reactor Projects Section 3B
'
J. W. Craig, Director, Project Directorate III-2, NRR
P. G. Brochman, Senior Resident Inspector
S. P. Ray, Resident Inspector
J. B. Hickman, Project Manager, NRR
R. W. Cooper, Chief, Engineering Branch
.
Other
J. Greenwood, Soyland Site Representative
L. Meridian, WAND
!
D. Dodson, News Gazette
J. Roman, Nuclear Safety = Engineer, IDNS
W. Heideman, System Engineer, IBM
M. Burke, Clinton Bureau Chief,-Decatur Herald and Review
D._Brandon,.WICD
B.
Comments-Received from Licensee
Illinois Power Company's response to the Clinton Power Station-Initial
SALP 9 Report dated February 23, 1990, included several comments
that have resulted in a minor revision to the Initial SALP Report.
These
changes are listed-in Enclosure (2), and the revised page is included-
as Enclosure (3).
,
Replace the page in error with the revised page.
Upon revision, the
Initial SALP Report is considered to be the Final SALP Report.
t
C.
-Regional Administrator's Conclusions Based on Consideration of Licensee
Comments
I have concluded that the overall ratings in the affected areas have not
changed,
>
1
L
i:
<
3
,
l
l