ML20012C233

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Final SALP Rept 50-461/89-01 for Sept 1988 - Oct 1989
ML20012C233
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/13/1990
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20012C234 List:
References
NUDOCS 9003200353
Download: ML20012C233 (4)


See also: IR 05000461/1989001

Text

p

)c()//)c8(RrDS)

L

m

,.

,

'

-

1

1

t

I

i

MAR 131990

i

Docket No. 50-461

>

Illinois Power Company

e

i

ATTN:

J. S. Perry-

Vice President

Clinton Power Station

Mail Code V-275

P. 0. Box 678

'

Clinton, IL 61727

,

Gentlemen:

This refers'to the NRC's Systematic Assessment of Licensee Performance (SALP 9)

Report-for the Clinton Power Station and our meeting of January 26, 1990, which

discussed in detail the contents of the report and your written comments dated

February 23, 1990 relative to the report.

'

Based on our in-depth discussions during.the meeting and our thorough review

and evaluation of your letter, we have reached the conclusion presented in the

enclosed meeting summary for_the Final SALP Report. With the incorporation of

the enclosed revised page, the' Initial SALP Report should be considered to be

the Final SALP Report.

It is also noted that with this revision my

' previous letter dated January 5,1990, forwarding the Initial SALP 9 report,

should have read that Clinton Power Station was in outage conditions for 201

days of the 14 month assessment period.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

-Title 10, Code of- Federal Regulations, a copy of this letter with the

referenc'ed enclosures, will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions regarding

the Final SALP-Report, please let us know and we will be pleased to discuss

-

them with you.

-Sincerely,

Dr3cInni nicnod by

2. Dat Dula

A. Bert Davis

Regional Administrator

'

Enclosures:

,

'1.

Final SALP 9 Report

No. 50-461/89001

2

Revision sheets

.3.

Revised Page.to SALP Report

4.

Licensee Response Ltr,

dtd February 23, 1990

De_ Attached Qis.tribution f

pd

OO

er

K

nman

lier

us

e

lo

s

D

b Ok0

h

9003200353 90n333

n.

PDR

ADOCK 05000461

l

'

'O

PDC

L :t .

u

.

. -

-

- .

. - - - -

- -

- - -

.

a

,

q!

. ce .

. .

,

F

.

i

Illinois Power Company

2

MAR 131990

1

Distribution

cc w/ enclosure:

J.' Cook, Manager, Clinton Power Station

F. Spangenberg, III, Manager -

Licensing and Safety

DCD/DCB(RIDS)

~ Licensing Fee Management Branch

Resident Inspector, RIII

J. Hickman, NRR, PM

J. McCaffrey, Chief, Public

Utilities Division

H. Taylor, Ouality Assurance

Division, Sargent & Lundy

Engineers

Patricia O'Brien, Governor's

Office of Consumer Services

S. Zabel, Esquire Schiff, Hardin,

& Waite

L. Larson, Project Manager .

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

Nuclear Safety

J. M. Taylor, EDO

T. E. Murley, NRR

K. M. Carr, Chairman

T. M. Roberts, Comissioner

l

K. C. Rogers, Comissioner

J. R. Curtiss, Comissioner

F. J. Remick, Comissioner

J. B. Hickman, NRR Project Manager

.

J. W. Craig, NRR Director, Project Directorate III-2

j

l

J. Lieberman, Director, Office of

L

Enforcement

i

A. T. Gody, LPEB, NRR-

1

i-

J. F. Wechselberger, HRR

4

RIII PRR

i

!

State Liaison Officer, Stete

l

L

of Illinois

i

INP0

l

L. A. Reyes, RII

i

L. R. Greger, RIII

l

M. J. Pearson, RIII

l

L. L. Cox, RIII

RIII Files

L

'

,

s

9

e

i

Clinton Power Station

A.

Summary of Meeting with Illinois Power Company

The findings and conclusions of the SALP Board are documented in

Report No. 50-461/89001 and were discussed with the licensee on

Janua ry 26, 1990, at the Clinton Visitors Center, Clinton, Illinois.

While the meeting was primarily a discussion between the licensee

and NRC, it was open to members of the public as observers.

The following licensee and NRC personnel were in attendance, as well

as the noted observers.

Illinois Power Company

W. J. Kelley, Chairman and Chief Executive Officer

J. S. Perry, Vice President

J. G. Cook, Manager, Clinton Power Station

F. A. Spangenberg, Manager, Licensing and Safety

R. E. Campbell, Manager, Quality Assurance

R. D. Freeman, Manager, Nuclear Station Engineering

J. A. Miller, Manager, Scheduling and Outage Management

R. E. Wyatt, Manager, Nuclear Training

J. F, Palchak, Manager, Nuclear Planning Support

D. L. Holtzscher, Director, Nuclear Safety

J. D. Weaver, Director, Nuclear Licensing

R. F. Phares, Supervisor, Licensing Operations

S. P. Hall, Director, Nuclear Program Assessment

D. R. Morris, Director, Plant Operations

S. E. Rasor, Director, Plant Maintenance

C. L. Baker, Director, Plant Support Services

R. W. Morgenstern, Director, Plant Technical

D. W. Miller, Director, Plant Radiation Protection

'

K. R. Graf, Director, Operations Monitoring Programs

R. L. Ehnle, Director, Industrial Safety

A. L. Ruwe, Director, Systems and Reliability Engineering

R. T. Kerestes, Director, Engineering Projects

T. R. Chistester, Director, Design and Analysis Engineering

E. B. Vaughan, Director, Operations and Maintenance Support Engineering

J. W. Pruitt, Director, Programs and Administration

D. W. Waddel, Director, Emergency Response

J. M. Gruber, Director, Outage Planning and Scheduling

D. M. Antonelli, Director, Operations Training

T. S. Palmer, Director, Maintenance and Technical Training

C. W. Bell, Director, Material Management

C. E. Elsasser, Director, Outage Maintenance Support

R. B. Gill, Director, Nuclear Projects

J. A. Brownell, Project Specialist, I&E

R. D. Frantz, Staff Engineering, I&E

2

)

'V

'O

-

<

..

'-

.o

,

i. -

~

T. S. Arnold, Staff Engineer, I&E

'

K. L. Jones, Principal _ Assistant to the Vice President

-;

g

F. Beaman, Supervisor, Public Affairs

"

'

F. C~ Edler, Director, Plant Support Services

,

b

P. D.;Yocuum, Supervisor, Operations

D. Smith, Supervisor Security

.

Nuclear Regulatory Commission

9

A. Bert Davis, Regional Administrator

E

E. G. Greenman, Director, Division of Reactor Projects

-R. C. Knop, Chief, Reactor Projects Branch 3

_

F

M. A. Ring, Chief, Reactor Projects Section 3B

'

J. W. Craig, Director, Project Directorate III-2, NRR

P. G. Brochman, Senior Resident Inspector

S. P. Ray, Resident Inspector

J. B. Hickman, Project Manager, NRR

R. W. Cooper, Chief, Engineering Branch

.

Other

J. Greenwood, Soyland Site Representative

L. Meridian, WAND

!

D. Dodson, News Gazette

J. Roman, Nuclear Safety = Engineer, IDNS

W. Heideman, System Engineer, IBM

M. Burke, Clinton Bureau Chief,-Decatur Herald and Review

D._Brandon,.WICD

B.

Comments-Received from Licensee

Illinois Power Company's response to the Clinton Power Station-Initial

SALP 9 Report dated February 23, 1990, included several comments

that have resulted in a minor revision to the Initial SALP Report.

These

changes are listed-in Enclosure (2), and the revised page is included-

as Enclosure (3).

,

Replace the page in error with the revised page.

Upon revision, the

Initial SALP Report is considered to be the Final SALP Report.

t

C.

-Regional Administrator's Conclusions Based on Consideration of Licensee

Comments

I have concluded that the overall ratings in the affected areas have not

changed,

>

1

L

i:

<

3

,

l

l