Monthly Operating Repts for Feb 1990 for McGuire Nuclear Station Units 1 & 2
ML20012C146
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/28/1990
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20012C143 List:
References
NUDOCS 9003200183
Download: ML20012C146 (10)


Text

_

y i.

~

DPERATIN6 DATA REPORT DOCGIND 50 *l9 I

ftATEMarch 15. 1990 OPERATING $1ATUS COMPLCTEDBY R.A. Willians TELEPHONE 704 37B-5907

1. Unit Nase McGuirt !

= 2. Reporting Ftriod: February 1,1990-February 20,1990 y

3. Licensed Thereal Power (MWt):

3411

4. Naeeplate Rating (6ross MWe):

1305a Notes eNaseplate Rating P

5.DesignElectricalRating(NetMWr):'

1100

-(BrossMWe)calculatedas

6. Mantece Dependable Capacity (6 toss MWe):

1871 1450.000 MVA x.90 power F

7. Merleve Dependable Capacity (Net MWe):

112?

factorperPageill, l..

,8. If Changes Occur in Capacity Ratings (itees Nueber 3 Through 7) Since Last NUREE-0020.

Report.ElveReasons h.

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason For Restrictions, If any This Month Yr.-to-Date Cuaulative

!!.HoursinReportingPeriod-672.0 1416.0 72288.0 12.'NueberOfHoursReactorllasCritical 0.0 178.3 51036.4

13. Reactor Reserve !Dutdown Hours

--0--

--0-- -

14. Hours Senerator On-Lii.e 0.0 178.3 50477.1
15. Unit Reserve Shutdoun Hours -

--0--

--0--

f-

16. Sro$s Thereal Energy 6enerated (MWH) 0 606302 152009035

!?.GrossElectricalEnergyGenerated(MWHi 0

211001 52438678 19, Net Electrical Energy Benerated (MWH) 2999 191292

.50077675

19. Unit Service Factor 0.0

!?. 6 69.8 20.UnitAvailabilityFactor 0.0 12.6 69.8

21. Unit Capacity Factor (Using MDC Net)-

0.0 12.0 '

59.B -

22. Unit Capac!ty factor n'.ing DER Net) 0.0 11.5 58.7 23.UnitForcedOutageRate 0.0 49.4 12.6

~*

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Currently Refueling

25. lf Shut Down At End Of Report Period. Estleated Date of Startupi April 28, 1990

.26.-Units in Test Status (Prior to Cossercial Operation):

Forecast Achieved 1

INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OFERATION r

9003200183 900315 Q

PDR ADOCK 05000369 c;o.

'R PDC y

u i

.o

' qa.

r.:,,,

^

OPERAllN6 MTA REPORT i

l 6

,;, 3 -

i D00t'ET NO.

50-369

[

UNIT RcBulre 1 l'

ll

'DATEMartb 15. 1990 -

ConPLETED py R.A. Williams :

]

TELEPHONE 704-373-5987 h

MONTH' Februarv. 1990' i

e t

M1 --

.AVERA6E MILY PDWER LEVEL RY, AVER 48E DAILY POWER LEVEL

'f

-( m Net)

{

(%*t)

.'t p

p-

- l' 0-17

-0 i

l2 0-18 0

SL 0

19 0

f 4

'0 20 0

(

3 5:

0 21.

0

.l 6-

=0-

~ 22 0

t 7'-

0 23 0 --

8:

0 2h 0

,l 9-

'O 25 0

I 10 0-26 0

[

-11 0

27 0

1'!

12 :.

0=

28

-0 13-

'O J

l n:

p

o g

. g.-

16.-

0

?

s

?

7 e

Y 3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. '50-370 UNIT NAME ~nu,v1Mr. 4 DATE ua/13/vu REPORT MONTH February 1990 COMPLETED BY s.

w.

nud t.n TELEPHONE tiusj-aea->ioz (1)

2) g_

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE-O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 2-P 90 4 F

A HA VALVEX TURBINE GOVERNOR VALVE '#1' CYCLING DUE TO CONTROL CARD FAILURE 3-P 90- 2-13 F

A HH PUMPXX TURBINE RUNBACK DUE TO IDSS OF

'A' FEEDWATER PUMP 4-P 90- 2-14 F

A HH PUMPXX HOLDING POWER TO INVESTIGATE FEEDWATER PUMP

'A' PROBLEMS 5-P 90- 2-14 F

A HH PUMPXX IDAD DECREASE TO INVESTIGATE

'A' i

FEEDWATER PUMP PROBLEM 6-P 90- 2-14 F

A HH PUMPXX CLOGGED ORIFICE ON OVERSPEED TRIP l

MECHANISM ON

'A' MAIN FEEDetATER l

PUMP l

I (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) i S Scheduled 1-Manual for Preparation of Data 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram-Event Report (LER D-Regulato n Restriction 4-Other (Explain)

File (NUEG-Ol61))

E-Operator Training & License Examination F-Administrative (5) r H-Other (Explain) (Explain) l G-OM rator Error Exhibit I - Same Source

.g.b.,

. :-s c:

we

,u,,.

,;,.g.

y.g.

l\\ '

i DOCKET NO:

50 369~

q

. UNIT: McGuire 1

'DATE: '03/15/90 NARRATIVE

SUMMARY

l 4

i 1

MONTH:- February 1990 1

McGuire Unit 1. began the month of February shut down for its End Of-i 0,'

Cycle '6': refueling. outage. The unit remaihed in the-outage for the.

1 i

' entire' month.

I 1

r

.. )

J

'i;

^

i r

-t i

i h

i i

1

'I y

r Ii

.: 6J-s

,k Prepared by:

S. W. Moser

. Telephone:.

704-373 5762 a>

y 8 8

," ' V-e

1 MCN'lHIX RIFLELIlO IhTUINATICN RECUEST i

1.

Facility nanet McGuire, Unit 1 2.

Scheduled next refuelirg shutdown: Currently refueling 1

3.

Scheduled restart following refueling: April 1990 4.

Will refuelirg or resunption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Ccunittee regardirg unreviewed safety questions? N/A 5.

Scheduled date(s) for sutrnitting proposed licensing action and supporting information: N/A j

6.

Important licensirg considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operatirg prtcedures).

7.

Nunter of fuel assenblies (a) in the core:

193 (b) in the spent fuel pool:

445 8.

Present licensed fuel pool capacity:

1463 i

Size of rcquested or planned increcse:

9.

Projected date of last refueling which can be acwmelated by present licensed capacity: October, 2004 DUl3 POWPR COMPANY DATE:

hhrch 15, 1990 Name of

Contact:

J. A. Reavis Phone 704-373-7567

y

  • n; *.

e 9

y k

OPERAi!N6TelAREPDRi i

L DOCKETNO

$0-370

[

DATEgarth 15, 1990 1~

DPEi(Ai!N6 Status COMPLETEDBY R.A. Willines s

TELEPHONE 704 373 59P7

1. Un!t Naee Mc6alte 2
2. Reporting Feriod February 1, 1990-February 20,1990
3. Licensed thereal Power ( M ils 3411 l

L

4. Neeeplate Rating 16 toss Meh 1305*

Notes eNastplate Rating a

5. Design Electrical Rating (Net Mel

,1100 (Bross Mel calculated as

6. Natieue Dependable Capacity (Gross Mel

!!71 1450.000 MVA.90 power

7. Marious Dependable Capacity (Net Me):

!!29 f actor per hge lit, f

' 8. If Changes Occur'in Capacity Ratings (itees Nueber 3 Through 7161nce Last NURE6-0020.

L' Report. Give Reasons:

[

9. Power Level 10 Which Restricted, if Any (Net Mel
10. Reason For Restrictions, if any:

!~

This Month Yr. to Date Cuaulaths 11.HoursinReportingPeriod 672.0 1416.0

$2504.0'

12. Number Of Hours Reactor lias Critical 672.0 1416.0 40118.8 1

- 13. lienctor Reserve Shutdown Hours

--0--

--0--.

--0--

14. Hours Generator On-Line 672.0 1416.0 39344.0

- 15. Unit Reserve Shutdown Hours -

--0--

--0--

i-

' 16, 6 toss Thereal Energy 6enerated (MH) 228364B 4741682 120002952

17. Gross Electrical Energy Generated (MH) 779372 1666647 44949308
18. Net Electrical Energy 6enerated (MN) 750622 1607051

-43009948 t

' 19.UnitServiceFactor-100.0 100.0 74.8 20.UnitAvailabilityFatter 100.0

-100.0 74.8

21. Unit Capacity Factor (Using MDC Net) 98.9 100.5 71.0
22. Unit Capacity Factor (Using DER Net) 94.7 96.2-69.3
23. Unit Forced Outage Rate 0.0 0.0

' 9.9

24. Shutdown. Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Nnno 1-

~

25. If Shut Down At End Of Report Period. Estisated Date of Startup:

26.UnitsInTestStatus(PriortoCoseertialOperation):

Forecast Achieved

}

.t INITIAL CRITICAlliY INITIAL ELECTRICITY COMMERCIALDPERA110N E

1 s

. ~.

i:

it" A

's,

,l

./

g.

.OPERAtlH6 HTA REPORT

.j I

D0trET WO

$0-370 I!

i'- '

llNil McGuire 2

'l x

MTE March 15. 1990

=i

!~

COMPLETEDBY R.A. Williams i-TELEPHONE 704-373-5987

-i s

f D

MONTH Februarv. 1990 i

!=

Ry, AVERABE MILY POWER LEVEL H1 AVERASE MILY POWER LEVEL (MWe-Net)-

(MWe-Net) t i

1165 17 1137

]

i

.2 1163 19 1157

.I i

3 1080 -

19 1157 4

1061' 20 1159 I

}

b 5-1142 21 1158

~

-61 1156 22 1159 P

7 illo 23 115B -

I 8

1152 24

-1124

-t 9.

!!60 25 1158 f

-1

- 10

'1147 26 1157-t 4

11

'1160 27 1157 12 1146-28 1157

[

.i 13 B72 14 677 15 --

1097

-i

.' 16.

1150 i

i I

i i

3,

_o

. +...

r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME nu,v ixt. 1 DATE uJ/13/ y u REPORT MONTH February 1990 COMPLETED BY s.

w.

nudt.M TELEPHONE

(/usJ-aiJ->eoz (1)

2) g_

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 3

90 1 S

672.00 C

RC FUELXX END-OF-CYCLE

'6' REFUELING OUTAGE (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions A-Equibment FailureB-Maintenance or test (Explain)

S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-Ol61)

E-Operator Training & License Examination F-Administrative (5) i G-Operator Error (Explain)

Exhibit I - Same Sottrce '

H-Other (Explain)

s, V

e i

DOCKET NO:

50 370

(

UNIT: 'McGuire 2 DATE:

03/15/90 c

p t-NARRATIVE

SUMMARY

pe pc

' MONTH:

February 1990-e McGuire Unit 2 began the month of February operating at 100% full power'.

L The unit operated at or near 100% full power until 1720 on 02/04, when a power reduction occured due to turbine governor valve cycling as a result of control card failure.

The unit stabilized at 73% power.

The j

unit began a power increase to 85% power at 1945 on 02/04 after removal of the control card. Upon completion of governor valve repairs, the unit commenced a power increase to 100% full power at 2321 on 02/04.

~

The unit. reached 1006 full power at 0248 on 02/05.

The unit then operated at or near 100% full power until 1136.on 02/13, when a turbine runback to 50% power occured due to loss of feedwater pump

'A'.

Following,a power increase to 70% power at 2251 on 02/13, the unit held power at 0010 on 02/14 to investigate feedwater pump 'A' problems.

The-unit then reduced power to 50% power at 0908 on 02/14 to repair feed-water pump

'A'.

At 2134 on 02/14, the unit began a power increase to 100% full power following repair of a clogged orifice on the overspeed trip mechanism on feedwater pump

'A'.

The unit reached 100% full power c.

at 1037.on 02/15, and operated at or near 100% full power for the remainder of the month.

Prepared by:

S. W. Moser Telephone:

704-373-5762 i

g i-MOTIHLY RIFUELIN3 INIORMATION REQUEST 1.

Facility name: McGuire, Unit 2

-2.

Scheduled next refueliry shutdown: September 1990 3.

Scheduled restart following refueling: Novernber 1990 4.

Will refueling or resunption of operation thereafter require a technical specificatico change or other license-amendment? N_o If yes, what will these be?

If no,. has reload design and core configuration been reviewed by Safety Review comnittee regarding unreviewed safety questions? N/A 5.

Schaital=1 date(s) for submitting proposed licensing action and supporting information: N/A

6.. Inportant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in-design or new operating procedures).

'7.

Number of fuel assenblies (a) in the core: 193 (b) in the spent fuel pool:

590

8. 4 Present licensed fuel pool capacity:

1463

~ Size of requested or planned increase:

-9.

Projected date of last refueling which can be accumciated by present licensed capacity: July, 2002 DUKE POWER COMPANY DATE:

March 15, 1990 Name of

Contact:

J. A. Reavis Phone:

704-373-7567