MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- ,-.
u d' l
g
' Electnc 1 POWER COMPAW -
231 w uctext to a:= 204a wome.m 5370s (454)221 2345 i
VPNPD-90-122 5 1 NRC-90-023 ]
r March.8, 1990
'I I
U..-S. NUCLEAR REGULATORY COMMISSION 6 Document' Control Desk Mail Station P1-137
Washington, D. C. 20555.
Gentlemen:
v DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS f POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 l Attached are monthly-operating reports for Units 1.and 2, Point Beach Nuclear Plant, for the calendar month of February ,
1990. ,
't very truly yours,
, d/ '
N" A,(y' '
C. W. - ay [
Vice President
' Nuclear. Power i
. Attachments' .;
r Copies to R. S. Cullen, PSCW [
NRC Regional Administrator, Region III -
NRC Resident Inspector
.x b .
38P8888H888Er 8
b ;
s,n r a-> un,m-~ i\\
. - , . =
r OPERATING DATA REPORT
-DOCKET NO. 50-266 .
DATE March 9, 1990 COMPLETED BY C. W. ' KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
'2. REPORTING PERIOD: FEBRUARY 1990 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING..(NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . -f
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . ....
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR 'ID DATE CUMULATIVE l 11. HOURS IN REPORTING PERIOD 672 1,416 169,320
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 139,759.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 136,955.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,007,834 2,137,228- 190,605,620
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 341,120 723,340 64,328,030
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 327,092 693,804 61,284,495
- 19. UNIT SERVICE FACTOR 100.0 100.0 80.9 i 20. UNIT AVAILABILITY FACTOR' 100.0 100.0 81.4'
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.4 101.0 74.2 l 22. UNIT CAPACITY FACTOR (USING DER NET) 97.9 98.6 72.8 j 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE,.AND DURATION OF EACH):
Forty-two day refueling and maintenance outage scheduled to commence on March 30, 1990.
( 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
o+ ,
DOCKET NO. 50-266 ,
UNIT NAME Point Beach. Unit 1 DATE March 9.1990 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL
, MONTH February AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 494 11 493 21 490 2 494 12 493 22 484 3 494 13 493 23 479 4 494 14 494 24 475 5 494 15 493 25 470 6 493 16 493 26 463 7 494 17 493 27 458 8 495 18 492 28 451 9 494 19 492 29 10 492 20 '489. 30
-31 PBF-002Sa (03-90)
P
.c.
IUNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO. - % 266 UNIT NAME Point Beach. Unit i DATE March 9.1990 J-REPORT MONTH ~ February.1990 COMPLETED BY C W. Krause TFIFPHONE NO. 414/221-2001 -
Method of No. Date Type' Duration Reason 2 Shutting IJoensec Event System - Component Cause and Corrective Action (Hours) Down Report No. Code' Code' To Prevent Recurrence Reactor 5 2
2 F: Forced Reason: ' Method:
- Exhibit G - Icstructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of data -
B - Maintenance or Testing 2 - Manual Scram entry sheets LER file C - Refueling 3 - Automatic Scram (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imad 5 Exhibit I - Sante Source F - Administrative 6 - Other (cxplain)
G - Operational Error (explain) .
H - Other (explain) -
PBF4M)28t*
G3-90)
k
. o f s' }
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE- ;
DOCKET NO. 50-266 ,
UNIT NAME Point Beach, Unit 1 l' DATE March 9, 1990 COMPLETED BY C. W. Krause -
TELEPHONE NO. 414/221-2001 i
Unit.1 operated at approximately 494 MWe net during most of the [
report period. The Unit 1 Tref program limit was lowered a total t of 10'F to account.for core end-of-life / fuel depletion. The unit surpassed 64 billion KWh on February 2, 1990. Primary-to- .
secondary leakage was stable at a detectable rate. t i
On February 14, plant personnel conducted an Emergency Plan drill '
in preparation for the upcoming March exercise.
On February 16, load supplies for the North Service Building were ,
transferred from Wisconsin Public Service Corporation to the station service. ,
i Maintenance conducted during the period included the annual G01 !'
emergency diesel generator inspection, callup inspections for Inverters 1DYO4, 1DYO3, and DYOD, repairs to retention pond radiation monitor-RE-230, and the adjustment of the pressurizer high level trip setpoint from 90% pressurizer level to a more -
conservative 80% pressurizer level.
s 9
1 ,
L l
's .
a s
OPERATING DATA REPORT DOCKET NO. 50-301 .
DATE March 9, 1990 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001-OPERATING STATUS
., NOTES 1.' UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 .
- 2. REPORTING PERIOD: FEBRUARY 1990 .
-3. LICENSED THERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . .. . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS.(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 672 1,416 154,105
- 11. HOURS IN REPORTING PERIOD 1,416.0 134,761.8 672.0
- 12. NUMBER OF HOURS REACIOR WAS CRITICAL 0.0 216.7 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 132,621.3 672.0 1,416.0
- 14. HOURS GENERATOR ON LINE 0.0 302.2 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS 188,729,288 1,018,430 2,145,752
- 16. GROSS THERMAL ENERGY GENERATED (MWR) 739,030 64,064,250 350,480
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 708,328 61,046,938 335,886
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) :100.0 86.1 100.0
- 19. UNIT SERVICE FACTOR '100.0 86.3 100.0
- 20. UNIT AVAILABILITY FACTOR 103.1 80.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 100.6 100.7 79.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 1.2 O.0
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
d -
~.
DOCKET NO. 50-301 UNIT NAME Point Beach. Unit 2 DATE March 9.1990 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH Februarv
- - AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET J
1 501 11 476 21 501 2 501 12 501 22 501 3 500 13 500 23 501 4 503 14 500 24 500 5 500 15 500 25 501 6 500- 16 501 26 502 7 502 17- 501 27 503 8 503 18 501 28 499 9 501 19 501 29 10 500 20 499 30 31 PBF-0028a G390) !
~ ' '
-- e
- p. _
6c /
[, DOCKET NO. 50-301 . -:
UNIT SHIJTDOWNS AND POWER REDUCT10NS UNIT NAME - Point M Unit I' March 9.1990 4'
'DATE COMPLETED BY C W. Krause REPORT MONTH Februarv.1990
- TELEPHONE NO. '414!221-2001 Method of Shutting Ixensee Event System Component Cause and Corrective Action No. Date Type' Duration Reason:
Down Report No. Code
- Code' To Prevent Recurrence (Hours)
Reactor' I
2 8
Method:
- Exhitnt G - Instructions 8 F: Forced Reason:
1 - Manual for preparation of data S: Scheduled A - Equipment Failure (expla'.n) 2 - Manual Scram entry sheets LER file B - Maintenance or Testing C - Refueling 3 - Automatic Scram (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of -
E - Operator Training & Previous Shutdown 5 - Reduced lead -' Exhibit I - Same Source Ixensing Exam F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
PBF44C8b G3-90)
1
.* . .a o ..
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
DOCKET NO. 50-301 UNIT NAME Point Beach, Unit 2 DATE March 9, 1990 COMPLETED BY C. W. Krause !
TELEPHONE NO. 414/221-2001 1
Unit 2 operated at approximately 500 MWe net throughout the j period with no significant load reductions. The unit surpassed i 64 billion KWh on February 23, 1990. Primary-to-secondary leakage was stable at less than 10 gallons per day. l On February 17, a minor power excursion occurred when the electro-hydraulic (EH). turbine governor controller shifted from 1 automatic to manual control with no operator action. While this I did not constitute a reportable event, the NRC resident inspector 1 was given courtesy notification. The source of the governor EH l control system problem has been identified and corrective action- 1 is pending.
On February 19, during an inverter instrument-bus transfer, f several pieces of station equipment lost power. Among these were l the letdown control valve, 2LCV-427, and nuclear detector power range channel 42. Operators restored the equipment immediately. 1 It is suspected that the inverters may have been 180* out of I phase when shifted.
Other maintenance conducted during the period included temporary repairs to a Unit 2 feedwater line support, and an adjustment of the pressurizer high level trip setpoint from 90% pressurizer ,
level to a more conservative 80% pressurizer level.
l 4 - -w w