u d' l

g

' Electnc 1 POWER COMPAW -

231 w uctext to a:= 204a wome.m 5370s (454)221 2345 i

VPNPD-90-122 5 1 NRC-90-023 ]

r March.8, 1990

'I I

U..-S. NUCLEAR REGULATORY COMMISSION 6 Document' Control Desk Mail Station P1-137

Washington, D. C. 20555.

Gentlemen:

v DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS f POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 l Attached are monthly-operating reports for Units 1.and 2, Point Beach Nuclear Plant, for the calendar month of February ,

1990. ,

't very truly yours,

, d/ '

N" A,(y' '

C. W. - ay [

Vice President

' Nuclear. Power i

. Attachments' .;

r Copies to R. S. Cullen, PSCW [

NRC Regional Administrator, Region III -

NRC Resident Inspector

.x b .

38P8888H888Er 8

b  ;

s,n r a-> un,m-~ i\\

. - , . =

r OPERATING DATA REPORT

-DOCKET NO. 50-266 .

DATE March 9, 1990 COMPLETED BY C. W. ' KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .

'2. REPORTING PERIOD: FEBRUARY 1990 . .

3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING..(NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . -f
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . ....
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR 'ID DATE CUMULATIVE l 11. HOURS IN REPORTING PERIOD 672 1,416 169,320
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 139,759.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
14. HOURS GENERATOR ON LINE 672.0 1,416.0 136,955.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,007,834 2,137,228- 190,605,620
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 341,120 723,340 64,328,030
18. NET ELECTRICAL ENERGY GENERATED (MWH) 327,092 693,804 61,284,495
19. UNIT SERVICE FACTOR 100.0 100.0 80.9 i 20. UNIT AVAILABILITY FACTOR' 100.0 100.0 81.4'
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.4 101.0 74.2 l 22. UNIT CAPACITY FACTOR (USING DER NET) 97.9 98.6 72.8 j 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE,.AND DURATION OF EACH):

Forty-two day refueling and maintenance outage scheduled to commence on March 30, 1990.

( 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

o+ ,

DOCKET NO. 50-266 ,

UNIT NAME Point Beach. Unit 1 DATE March 9.1990 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL

, MONTH February AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 494 11 493 21 490 2 494 12 493 22 484 3 494 13 493 23 479 4 494 14 494 24 475 5 494 15 493 25 470 6 493 16 493 26 463 7 494 17 493 27 458 8 495 18 492 28 451 9 494 19 492 29 10 492 20 '489. 30

-31 PBF-002Sa (03-90)

P

.c.

IUNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO. - % 266 UNIT NAME Point Beach. Unit i DATE March 9.1990 J-REPORT MONTH ~ February.1990 COMPLETED BY C W. Krause TFIFPHONE NO. 414/221-2001 -

Method of No. Date Type' Duration Reason 2 Shutting IJoensec Event System - Component Cause and Corrective Action (Hours) Down Report No. Code' Code' To Prevent Recurrence Reactor 5 2

2 F: Forced Reason: ' Method:

  • Exhibit G - Icstructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of data -

B - Maintenance or Testing 2 - Manual Scram entry sheets LER file C - Refueling 3 - Automatic Scram (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imad 5 Exhibit I - Sante Source F - Administrative 6 - Other (cxplain)

G - Operational Error (explain) .

H - Other (explain) -

PBF4M)28t*

G3-90)

k

. o f s' }

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE-  ;

DOCKET NO. 50-266 ,

UNIT NAME Point Beach, Unit 1 l' DATE March 9, 1990 COMPLETED BY C. W. Krause -

TELEPHONE NO. 414/221-2001 i

Unit.1 operated at approximately 494 MWe net during most of the [

report period. The Unit 1 Tref program limit was lowered a total t of 10'F to account.for core end-of-life / fuel depletion. The unit surpassed 64 billion KWh on February 2, 1990. Primary-to- .

secondary leakage was stable at a detectable rate. t i

On February 14, plant personnel conducted an Emergency Plan drill '

in preparation for the upcoming March exercise.

On February 16, load supplies for the North Service Building were ,

transferred from Wisconsin Public Service Corporation to the station service. ,

i Maintenance conducted during the period included the annual G01  !'

emergency diesel generator inspection, callup inspections for Inverters 1DYO4, 1DYO3, and DYOD, repairs to retention pond radiation monitor-RE-230, and the adjustment of the pressurizer high level trip setpoint from 90% pressurizer level to a more -

conservative 80% pressurizer level.

s 9

1 ,

L l

's .

a s

OPERATING DATA REPORT DOCKET NO. 50-301 .

DATE March 9, 1990 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001-OPERATING STATUS

., NOTES 1.' UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 .

2. REPORTING PERIOD: FEBRUARY 1990 .

-3. LICENSED THERMAL POWER (MWT): 1518.5 .

4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . .. . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS.(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 672 1,416 154,105
11. HOURS IN REPORTING PERIOD 1,416.0 134,761.8 672.0
12. NUMBER OF HOURS REACIOR WAS CRITICAL 0.0 216.7 0.0
13. REACTOR RESERVE SHUTDOWN HOURS 132,621.3 672.0 1,416.0
14. HOURS GENERATOR ON LINE 0.0 302.2 0.0
15. UNIT RESERVE SHUTDOWN HOURS 188,729,288 1,018,430 2,145,752
16. GROSS THERMAL ENERGY GENERATED (MWR) 739,030 64,064,250 350,480
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 708,328 61,046,938 335,886
18. NET ELECTRICAL ENERGY GENERATED (MWH) :100.0 86.1 100.0
19. UNIT SERVICE FACTOR '100.0 86.3 100.0
20. UNIT AVAILABILITY FACTOR 103.1 80.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 100.6 100.7 79.7
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 1.2 O.0
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

d -

~.

DOCKET NO. 50-301 UNIT NAME Point Beach. Unit 2 DATE March 9.1990 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH Februarv

- AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET J

1 501 11 476 21 501 2 501 12 501 22 501 3 500 13 500 23 501 4 503 14 500 24 500 5 500 15 500 25 501 6 500- 16 501 26 502 7 502 17- 501 27 503 8 503 18 501 28 499 9 501 19 501 29 10 500 20 499 30 31 PBF-0028a G390)  !

~ ' '

-- e

p. _

6c /

[, DOCKET NO. 50-301 . -:

UNIT SHIJTDOWNS AND POWER REDUCT10NS UNIT NAME - Point M Unit I' March 9.1990 4'

'DATE COMPLETED BY C W. Krause REPORT MONTH Februarv.1990

  • TELEPHONE NO. '414!221-2001 Method of Shutting Ixensee Event System Component Cause and Corrective Action No. Date Type' Duration Reason:

Down Report No. Code

  • Code' To Prevent Recurrence (Hours)

Reactor' I

2 8

Method:

  • Exhitnt G - Instructions 8 F: Forced Reason:

1 - Manual for preparation of data S: Scheduled A - Equipment Failure (expla'.n) 2 - Manual Scram entry sheets LER file B - Maintenance or Testing C - Refueling 3 - Automatic Scram (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of -

E - Operator Training & Previous Shutdown 5 - Reduced lead -' Exhibit I - Same Source Ixensing Exam F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

PBF44C8b G3-90)

1

.* . .a o ..

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE l

DOCKET NO. 50-301 UNIT NAME Point Beach, Unit 2 DATE March 9, 1990 COMPLETED BY C. W. Krause  !

TELEPHONE NO. 414/221-2001 1

Unit 2 operated at approximately 500 MWe net throughout the j period with no significant load reductions. The unit surpassed i 64 billion KWh on February 23, 1990. Primary-to-secondary leakage was stable at less than 10 gallons per day. l On February 17, a minor power excursion occurred when the electro-hydraulic (EH). turbine governor controller shifted from 1 automatic to manual control with no operator action. While this I did not constitute a reportable event, the NRC resident inspector 1 was given courtesy notification. The source of the governor EH l control system problem has been identified and corrective action- 1 is pending.

On February 19, during an inverter instrument-bus transfer, f several pieces of station equipment lost power. Among these were l the letdown control valve, 2LCV-427, and nuclear detector power range channel 42. Operators restored the equipment immediately. 1 It is suspected that the inverters may have been 180* out of I phase when shifted.

Other maintenance conducted during the period included temporary repairs to a Unit 2 feedwater line support, and an adjustment of the pressurizer high level trip setpoint from 90% pressurizer ,

level to a more conservative 80% pressurizer level.