DQ c,;

70- 0039 MAR 0 5.1990

The Honorable Jeremiah W. (Jay) Nixon 22nd-District Room 429' State Capitol'

. Jefferson City, MO 65101 g

Dear Senator Nixon:

I am responding to your January 25, 1990 letter, in which you request a copy of Combustion Engineering's (CE) response to the Nuclear Regulatory

-Commission's:(NRC)-December 27, 1989 Letter and-Inspection Report.

CE submitted a res)onse to the NRC on February 7,1990, and a copy is enclosed.

-We are reviewing tie adequacy of the response at this time and will be glad to provide.you a copy of any further correspondence regarding this matter. -

If you have any questions,- please contact me at (708) 790-5612.

Sincerely, Bruce S. Mallett, Ph.D., Chief Nuclear Materials Safety Branch

Enclosure:

. As stated bec w/o~ enclosure:

-DCD/DCB(RIDS)-

Combustion Engineering Docket File No. 70-0036 bec w/ enclosure:

C.'Haughney.NMSS

. A..Datta, NMSS-

'C. Nore11us, RIII D; Sreniawski, RIII-

-R. Lickus, RIII Nk k

Of, 6

j c

~ RIN ~

I\\

3p

-Ma lett/jl 03/5 /90 o

m

.I

. w y 4'.f **

..y Q9 i*

)

-j 90MBIp578000fBIOSIBIBBIIBOIS Feb.ruary.

7,11990

= Bruce-S.. Mallet, Ph.D., Chief

, Nuclear Materials Safety Branch

- U. S.. Nuclear Regulatory Commission, Region III.

799 Roosevelt Road-

.-G1en-Ellyn. IL.60137

.v.

Dear Dr.. Mal'lett:

7',':

.y" b

As. requested by your l'etter-dated' December 27, 198'9, enclosed 'is" a" report on'..

~

'the status of open items listed in Inspection Report #70-0036/89004.-(ORSS).

_ Please advi.se if further information is required.

y y

- Respectfully, submitte'd,

,3 James A. Rode.

  1. ~

.P1 ant Manager.

JAR / ear /17012' Enclosure I

r.-.

.A. :

8 e

e.

p

'n f q.;

..lll >

a i U..

.v y p f.. wl.,,.., Power Systems Post Offce Box 107 -,. i,'?IN,. {(314) 937-4691 -

i

.:op,ypq

tl ^$,.W

. 'J Highway Pc ?,

,. g ENWS k' b. (314) 296 56'40

a: p

'j...

.q pgm,. y :;

'M 'w" b

' Hematite, Mi.ssout163047: **3.m.

.s~

g9:

p

,u v r

[ hMk

, 3,~v.

vui.9g@.i

,[

'% w^ %hh4.a Mk: k%MLbe~w ew:e w, gk,[.g g, 'Un$ w...s % Cr u

. ~m g'{g.1990

, 7.!

- i

, W rr u n >a. a w

v. &
w%

st

. %w 2

.L M:

ut l'

ne

._,_m

. -. _. ~ _. _

j'

  • ~ ~

/4{,. =

4,:

~

AB8-Combustion Engineering, Inc.

,lJ

-Hematite Plant

! X i

.f Licence #SNM-33

. Status'of Open Items - Inspection Report'#70-0036/89004 (DRSS)

Open' Item #70-36/89004-01'- Posting of storage bins in incinerator area.

The criticality limit sign for the storage bins has b'een changed to limit, storage to contaminated items with no significant uranium.

This will allow more than one item of this type to be stored in each bin.

Items listed in'Section II of the Inspection Report:

1 02'- Review safety of operation of the older dewaxing and sintering furnaces.

u l

We plan to install ultra-violet flame sensors on dewaxer #.1 and furnace #5 i v)kj\\\\

in the old pell_et plant (Building 255).

Whe.n the ' equipment'in Building' 254 is fully operational., only these units will remain in routine Qp pdf. operation.

d p

, 3.- Por. ble fi.re extinguishers shbuld be inspected' monthly..

0 ta M

One' monthly inspection of fire extinguishers was missed after reassignment of duties within the Nuclear and Indu.strial Safety group.

The Health '

'jp

$.M [-

Physics Supervisor wil.1 routinely check to ensure.'that the fire extinguisher inspecti.on is performed in, a. timely manner.

04 ' Prov'ide fire water system to upgrade-fi.re suppression. system.,

L'h

$6 A : proposal for 200,000 gallons water. storage facility was, recently M M7 have.ated from a local design engineering. company'.

reques Our commitment is to

~

2

' p-wi-dditional anhydrous, ammonia storage ' capacity.

Use of water 'to -

fight ' fires will continue to be limited due to criticality ' safety considerations..

05'- Training. for fire brigade members should be oriented towards hands-on

(

fire fighting. The effectiveness of the instruction should be tested.

Hands-on training is conducted in the use of portable fire extinguishers

? M'I and self-contained ~ breathing apparatus, alternated with classroom tA sessions, training films. and. drills.

We will work with local fire

%lp-kd 7 department personnel to ensure the effectiveness of, this training, A f. ' including testing where appropriate..

m 06 - A" dike 'to contain potential nitric. acid leakage 'in. the South Vault is

  • ~

recommended.

n

  1. M

.;, fro $'co[ntacting organic materials.A concrete ' dike will be ' constructed to preve This Will be completed by April,-1990.-

1

go 2 s
1...

T 1

g

[ '.

gg ir r

e x;

E bs6 ah&x5N$E iab$b1 ~b tukOSSAbhbN^n

-.--,-.u....

w

+

..,v.

n.

--a x.

n j.

7,

.iu q('.4 ' # l,T.

.,,..,y ABB-Combustion Engineering, Inc.

Page 2 f yI Hematite Plant' y,

a, ye Licence #SNM-33 u

], ~ ~ '

- )

6 3

07 - Unneeded contiustible objects should be promptly remoiled from the manufacturing areas.

We will continue efforts to minimize combustible -loading of the g

manufacturing areas.

Empty boxes and crates will be promptly removed.

t WDM Also,- aluminum pallets will be obtained to replace wooded pallets for t necessary storage in these areas.

3g

-[

08 - Review micronizer-equipment and operation for potential loss of containment of SNH material.

As stated in the Inspection Report, operation of the micronizer has not caused. significant airborne contamination.

Blow-back of the system, h.

h6 wever, does cause' contaniination on : the inside of ' the. hood.

We have

@g: designed-an experinental funnel shroud for better containment of:

blow-back in the new facility and will evaluate retrofitting this into.

the older areas,o.f the plant.

We will continue to monitor airborne concentration,s with both fixed and;1apel air samplers..

.h G

.; g;,.

5ff e

'f 1

q 9y

- 7:

'@c P

  • /

A Y

g

, ;e 3,

I

~l 4,

s A

g f

xKC ' ' 5 J..

U,.

i 9

,f;Y 1 f>.

. L,.,,i >

  • 8 N
4.,
,4 ' e,

,-,

  • yy;-g, r.p, m W

];,, Gifd% _6' e

. ?,' %

.;fll b ply-6

  • l.;

' R v-N

'Q kS M :t y J,lv)'G U f 1,

. *)$ i 1.AQ _ :g '*$

?

I$$

- ESEuS b'

OY5Y+

=.

.