MONTHYEARB17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With B17748, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With B17693, Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With B17694, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With B17701, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With B17627, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With B17617, Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with B17461, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With B17460, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With B17576, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With B17579, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With ML20195E1871998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 2 B17545, Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With ML20195F9821998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Millstone,Unit 3 B17497, Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With ML20195F9871998-09-30030 September 1998 Corrected Page to MOR for Sept 1998 for Millstone,Unit 3 B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With B17437, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 21998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 2 ML20195E2061998-08-31031 August 1998 Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2 B17441, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With B17450, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With B17410, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 31998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 3 B17406, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 1 B17404, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 2 B17365, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 2 B17366, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 3 B17369, Monthly Operating Rept for June 1998 for Mnps,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Mnps,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
- - - - -..... . ,
a.
ee
?!
9 .f .
E .l IsosmIBAST UT9pTIES o.n r.i ome . s.w.n sir t. samn. Conn.cucui
- kA FORD. CONNECTICUT 06141-0270
. U L' T 2 "T',',
. %",'l%%"",, - (203) 665-5000 March 8,-1990 MP-90-230 Re: 10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Contrei Desk -
Washington, D.C. 20555
~
Reference:
Facility perating License No. NPF-49 Docket o.50-423
Dear Sir:
In accordance with reporting requirements of technical specificatio'ns Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operatmg Report 90-03 covering opera-
- tion for the month'of February is hereby forwarded.
Very truly yours; NORTHEAST NUCLEAR ENERGY COMPANY
, Steph n E.Scace tack Director, Millstone Station
! Attachment -
cc: . W T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 N$31$ Cb $3
+ \
- +
g.giy' en > e-c)}jpg .; ,' '
[' , e e . , ,
p ,, instats IRC OfttAflBG STAf0S RIP 0tf CORPltf!D BT ttACf01IBGilittllG ::: sti s 1
g -
=;
L M 1. DOCitt.. d 50-423 OPIRAfiUGSTATUS q g '
2.- IIP 0RfilG Pir100...f!Bt0Alf 1990. 00fAGE + Olllit I0025.. 0.0 + 672.0 :612.0
?
l3; OflLiff 00lfAffi.......'.a ......A. L. ILBS 203444-5388 ::::: 4488888 ';
m 4. : LICERSID fitRH6 P0 Nit. . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 411 - HILLSf018* - ,
- 5. BAHIPLATI IAtlIG (GROSS HWI). ..................... ...........J 1,253 HW '
1" 8Clif3- 4 b 16.1 DESIGI ELICf tlCAL tittlG (Itf H1).... ..... ..... . . . ...... .. ..J 1,153.6 - ::::::::::::::
p if 5 BAllBUR HPilDABLE CAPAClff (GROSS H1)........................ 1,184.2 a k' >
' 8J .HAIIB05 DIPIRDABLE CAPACiff (11f H I)..........................i 1,137.0_ i p
~
- 9. IF CHANCIS 00001 AB0ft SINCE LAST RIP 0tt, itASONS Alt..... ....,
- . s R/A 3
- 10. POU R Lif!!, TO WilCH ttSillCf!D, IT AMT (Ilf Mt),.............,I/A:
~
N P lliRIASONFOR!! Sit 1Cfl03,'IfAlf....R/A- '
t - -
F HORTI filtTODAft COBOLAfift70 Daft m ::::: :::::::::::: :::::::::i::::::::
pi-
=
12.BOURS1Rt!P0RflNGPl!!0D 672.0 1,416.0 33,792.0 13/IDEBIROFE00!STI!IIACTORWASCliflCAL 612.0 1,318.0 _27,053.9 l
l
- 14. RIACTOR t!Stift SIOfD0H B00tS 0.0 38.0 761.9.
15.HOURSGIN!!ATORORLliti 672.0 1,370.2 26,535.2
- 16c 0117 RISitit SHOTD0H E00tS- 0.0 0.0 0.0 17 HOSS THitMAl, INitGY GilitATID (H2) 2,263,450,0 4,525,234.0 81,800,643.4
18.~ GROSS ILICftlCAL IHIGT GEN!tiftD (MH) 188,938.5 _1,512,658.5- 30,255,298.5 19.- Et ILICfllCAL IlttGY GtHRAf!D (HH) 754,915.4 l1,501,981.5 - 28,857,350.Y i!O. H IT SitflCE FACTOR 100.0 96.8' 18.5
'21?UNITAVAILABILiffFACTOR 100.0- 96.8 78.5-22.1Hlf CAPAClff fACf02 (USlHG HC HT)- 98.8 93.3 - f 4.8, 23.0H17CAPAClffFACTOR(OSINGDitlif) 97.4 91.9 14.0'
- 24. Ulf FORCID 00fAGI lAft ' 0.0 3.2 9.2-25.LHlf FORCID 00fAGI 10HS _ 0.0 45.8 .2,683.3
- SHfDOHS SCHOUlt0 Oftt HIf Sl! H0llfHS (ffPI, Hft, AND DURAfl03 Of IACH). . .... ....
N/A o
'If 00t!!RTLT SHfD0H, ISil5Af!D STAlf0P Daft......ll/A j
',. I f
I q_
f 1 5 r_ ~ ,__,'Q:. '
g-, -
go ,
i l;
4 p
t-D . AVERAGE DAILY UNIT POWER LEVEL:
DOCKET No. 50423 ,
UNIT ' MILLSTONE UNIT 3~ !
. DATE March 6.1990 COMPLETED BY A. L ELMS 203-444-5388 ;
- MONTH Februarv1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE . NET) (MWE . NET)
.1 1135 16 1141 I l
2 1127 17 1137 3 1140 18 1140 4 _
1136 19 1141 l5 1138 - 20 -1141 6' 1138 21 1141
-7' 1142' 22 1145
.8 1140 23 1144 1 9 1140 24- 1141
'10 1136 25 1138 11 1140 26 1139 12 1140 27 1139 13 1139 28 1128 14 941 1
15 910-1 Uh-
~
.'1 DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME MILLSTONE 3 DATE 3-6-90 COMPLETED BY A. EI2tS TELEPHONE f203) 444-5388 No. Date Wpe Dura- Reason Method of Licensee System Component Cause and Corrective (1) tion (2) Shut down Event Code Code Action to Prevent Hours Reactor (3) Rept No. Prevent Recurrence NONE 1: F: Forced S: Schedules 2: Reasons: 3: Method.
1-Manual 4: Exhibit G - Instructions for Preparation of Data A-Equipment FailureB-Maintenance or Test (Explain) 2-Manual Scram EntW Sneets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Rgstriction E-Operator Training & License Exam 4-Continued from (NUREG-0161)
F-Administrative 5 previous monthPower Reduction 5: Exhibit 1 - Same Source-G-Operational Error'(Explain) (Duration = 0 H-Other 9-Other (Explain))
i
~
x ;..
6 .m . ,
~i ,.
./
REFUELING INFORMATION REOUEST FEBRUARY 1990 r
. 1. Name of facility: Millstone 3.
[ '2. Scheduled date for next refueling shutdown: November 17.1990.
- 3. Scheduled date for restart following refueling: Jan.15.1991
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendments? .
- c As a result'of the new fuel desinn. Technical Soecifications chances to the Axial Flux Difference. Heat Flux Hot Channel Factor. arid Refueline Water Storane Tank sec-tions will be reouired. Furthermore. the Fuel Storace section of Desien L'eatures will be chanced to allow continued recionalized storace of snent fuelin the scent fuel cool. Also, the Instrumentation section will be chanced to' reflect a new Hich Flux at ~ ~
Shutdown setpoint. _,
- 5. Scheduled date for submitting licensing action and supporting information.
' Aucust 1.1990.
6.' Important licensing considerations associated with refueling, e.g., new of diffen.:nt fuel -
design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
Cycle 4 fuel assemblies will be of the Westinchouse Vantace SH desien. This design . ,
includes debris filter bottom nozzles, intermelliate flow mixine crids, iritecral fuel rod ~~ ~
I' burnable absorberr., and axial blankets.
~
, 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: :
(a): 193' (b): 160
' 8. ' The present licensed spent fuel pool storage capacity and the size of any increase in l licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present size - 756. '
No increase reonested.
9.' The projected date of,the last refueling that can be discharged to the spent fuel pool assummg the present hcensed capacity:
End of cycle 5.