Text
g jr +
-+
fgg;# '
- V
- ;-
.s-
~
- VERMONT YANKEE NUCLEAR POWER. CORPORATION P. O. BOX '157 ti GOVERNOR IIUNT ROAD
~ VERNON, VERMONT 05354 x
++'
March 10, 1990 VYV 90- 064.
J:i t, '
y
- U.S. Nuclear, Regulatory Commission
~-ATTN: Document Control Desk
' Washington, D.C...
20555 Loear' Sir:
- Submitted herewith is the Monthly Statistical Report for the
' Vermont Yankee. Nuclear Power Station for the month of February,.1990.
g; 4-very truly yours, VERMO T.. YANKEE: NUCLEAR POWER CORP.
dAk f]l/u1
.\\
Warren P.
urphry q
Vice Pre dent an 1
Manager of'Operat o
[
cc: l1' USNRC,
)
~
Region.DI C
475 Allendale~Rt,ad King of Prussia, PA 19406
.2)1USNRC Resident Inspector, VYNPS a
DP 0411 Rev. 3 Page 1 of l' i
1
)
o
.i I
l llDRa003130612.90o22a.
M l
.p ADOCK=05000271 t-
\\
ME 30 PDC-1
w
- t. ;
c,;,
,g_,,
- c. c j-;
.g.
1 1
lI i!,
l j
VERMONT YANKEE NUCLEAR POWER STATION
.1
-MONTHLY STATISTICAL REPORT 90-02' FOR THE MONTH OF FEBRUARY,.1990 l
S P
i t
i DP 0411~Rev.-3 Page l'of'l
-f
_t i
2 f
i
.. i
Pr-
!![
OPERATING l DATA: REPORT' u
1 DOCKET NO.-
50-271:
c.:
s DATE 900310-COMPLETED BY G.A. Wallin-C TELEPHONE (802)257-7711 p
- OPERATING STATUS ili Unit' Names-~
1 Vermont Yankee NOTES:
'2.
ReportingLPeriods-February:
s3.
LicensedLThermal Power (MWt):
1593
~4r ' Nameplate Rating (Gross MWe):-
540 p5L-DesignElectricalRating(NetMWe): 514(oc)-504(cc)
- y. 6-Maximum Dependable Capacity (Gross MWe): 535 (7 : LMaximum Dependable Capacity (Net MWe):
504
[h.,
If changes occur in capacity ratings (Items Number 3 through7)since
. last report,;give reasons:
N/A D
l 9.'
- Power 1evel to which restricted,-if any(Net MWe)
N/A 1104: Reasons for restrictions, if any:
N/A-1 L
~
This Month Yr-to-Date-Cumulative ill. ' Hours: In Reporting' Period 672.00
-1416.00 412.., Number-Of-.HourstReactor was Critical 672.00 1416.00.
122081.86-o j ' 13 7 Reactor: Reserve ~ Shutdown Hours 0.00 0.00
- 0. QD j
p 14.
Hours Generator;On-Line 672.00.
1416.00 119393.0]-
j
- 15,1 - Unit ReserveLShutdown Hours 0.00 0.00 0.00 L16.1LGross Thermal Energy > Generated (MWH)1066412.50' 2229823.00 176239379.50 117,, - Gross
- Electrical Energy-Generated 362249.00 757460'00 58711349.00
? ;18).. Net-Electrical Energy Generated (MWH)347320.00 726566.00'._55742265.00
' $19 f UnittService Factor 100.00 100.00 78.10 4
120'.
l Unit Availability Factor 100.00 100.00-78.10 I
1 q21.. Unit Capacity Factor (Using MDC Net) 10'2.55 101.81 72.34 j
'22.
Unit" Capacity, Factor (Using DER Net) 100.55-99.83~
70.94 t
n 23c Unit Forced Outage Rate 0.00 0.00 5.66; j
E24.
Shutdowns scheduled:over next 6 months (Typei-Date, and Duration of 1
- Each):
Maintenance shutdown: scheduled for mid-March to last four d
(orcfive. days.
g (25.=
Ifoshut.down at end of. report period, estimated date of startup: N/A
'26v, Units?In Test Status (prior to commercial operation): N/A j
Forecast Achieved.
i INITIAL CRITICALITY
/
' INITIAL: ELECTRICITY COMMERCIAL OPERATION
- VYDPF 0411.01 DPJ0411bRev.L3
-Pag 9fi of 1 RT-No. 13.F01.19F
'-t 3
.<?'S u
k r
6
?
l@
i :..- L /.
AVERAGE DAILY-UNIT POWER LEVEL:
E DOCKET NO. 50-271-UNIT Vermont Yankee.
DATE 900310 4
. COMPLETED BY
-G.A.
Wallin
+
TELEPHONE
( 8 F' ) 2 57-7 711 j
' MONTH'
' February =
DAY" AVERAGE DAILY POWER ~ LEVEL' DAY AVERAGE' DAILY POWER LEVEL
.(MWe-Net)
(MWe-Net)
-o
- 1.
519-17 ~.
518 5
- 2.
518 18..
515 L3..
519 19.
518-
+
p
~4.
.485 20, 518 l.
5.
519 21.
518
.p, 16...
518 22, 518 Ic 7.-
519 23.
518 8.-
-519 24.
518
. 9 '. '
519 25.
515 10.s 519 26.
516 a
'11..
517:
27.
516 t
12. -
518 28, 518
[b 13'..
519
- 29..
i
' 14.-
519 30.
L 15, 519 31.
l-4 16.
.519 s
l --
l
{ INSTRUCTIONS:
- h. ' On thisiformat, list,the average daily unit power level in MWe-Net (for.'each day in.the-' reporting month.
Compute to the nearest whole.
,cagawatt, t
.VYDPF 0411.02 J
'DP 0411 Rev. 3 0
- Page'l of.1 RT Noi 13.F01.18V t
l lt r
an
=
e p(-.../. ;-R
- .}g.;
g._
,y7
~t
.. ~
~
..,(
-c-
[- ~
~
~ - -
r Q:
W 3) y.
'. UNIT SEUTDOWNS AND POWER REDUCTIONS.
' [~
- ~3-DOCKET NO 50-271
- c REPORT MONTE FEBRUARY ~
UNIT RAME Yermont Yankee-DATE 900310
, COMPLETED SY G.A.
Wallia TELEPEONE t802)257-7711 1
2.-
Metnod of..
License:
. System
. Component Cause and Correct 1ve No.
'Date'
' Type-Duration' Reason Shutting Down Event-Code" Code Action to t.
(bours).
Reactor 3 Reportl
'4 5
Prevent Recurrence-None -
.fi 1 F: Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions 5: Scheduled
'A-Equipment-Failure (Explain) 1-Macual for Preparation of' Data B-Maintenance or Test
'2-Manual Scram Entry Sheets for Licensee'
~
C-Refueling 3-Automatic ~ Scram Event heport (LER) File D-Regulatory Restriction 4-Other'(Emplain) -(NUREG 0161)
E-Operator Training.and License Examination F-Administrative-5 Exhibit I - Same Source 17Y DP F 0411.03 G-Operational' Error'(Explain)
D DP.0411 Rev. 3 E-(Explain)
^
Page 1 of 1
-a L
~-
l'"
v s
a
DOCKET'NO. 50-271-t c ai ' ' ' '
UNIT VGraont YcnkGW
~
47,9 DATE 900310-
..u COMPLETED BY G.A. Wallin TELEPHONE _(802)257-7711 s
m.
- REPORT MONTH.
February j
SUMMARY
.OF OPERATINC EXPERIENCES
=>
- Highlights
)
Vormont Yankee operated at 99.6% of rated thermal power for the. month.
- Gross
- electrical generation was 362,249 MWHe or 99.8% design electrical-
[
icOpacity.
S!
- Op3 rating Summary Tha.following is a chronological description of plant-operations including
.other pertinent; items of interest for the month:
~
~At the beginning of the reporting period the plant was. operating at 99.9%
- i
.of rated thermal power._
- Thore were.no-reportable items of interest this month.
I i
l Atithe'end of.the reporting period the plant was operating at-99.9% of roted thermal power.
.VYDPFz 0411.04
.DP 0411 Rev. 3
~
Page:lloffl~