Monthly Operating Rept for Feb 1990 for Vermont Yankee Nuclear Power Station
ML20012B124
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/28/1990
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-90-064, VYV-90-64, NUDOCS 9003130612
Download: ML20012B124 (6)


Text

g jr +

-+

fgg;# '

V
;-

.s-

~

- VERMONT YANKEE NUCLEAR POWER. CORPORATION P. O. BOX '157 ti GOVERNOR IIUNT ROAD

~ VERNON, VERMONT 05354 x

++'

March 10, 1990 VYV 90- 064.

J:i t, '

y

U.S. Nuclear, Regulatory Commission

~-ATTN: Document Control Desk

' Washington, D.C...

20555 Loear' Sir:

Submitted herewith is the Monthly Statistical Report for the

' Vermont Yankee. Nuclear Power Station for the month of February,.1990.

g; 4-very truly yours, VERMO T.. YANKEE: NUCLEAR POWER CORP.

dAk f]l/u1

.\\

Warren P.

urphry q

Vice Pre dent an 1

Manager of'Operat o

[

cc: l1' USNRC,

)

~

Region.DI C

475 Allendale~Rt,ad King of Prussia, PA 19406

.2)1USNRC Resident Inspector, VYNPS a

DP 0411 Rev. 3 Page 1 of l' i

1

)

o

.i I

l llDRa003130612.90o22a.

M l

.p ADOCK=05000271 t-

\\

ME 30 PDC-1

w

t. ;

c,;,

,g_,,

c. c j-;

.g.

1 1

lI i!,

l j

VERMONT YANKEE NUCLEAR POWER STATION

.1

-MONTHLY STATISTICAL REPORT 90-02' FOR THE MONTH OF FEBRUARY,.1990 l

S P

i t

i DP 0411~Rev.-3 Page l'of'l

-f

_t i

2 f

i

.. i

Pr-

!![

OPERATING l DATA: REPORT' u

1 DOCKET NO.-

50-271:

c.:

s DATE 900310-COMPLETED BY G.A. Wallin-C TELEPHONE (802)257-7711 p

OPERATING STATUS ili Unit' Names-~

1 Vermont Yankee NOTES:

'2.

ReportingLPeriods-February:

s3.

LicensedLThermal Power (MWt):

1593

~4r ' Nameplate Rating (Gross MWe):-

540 p5L-DesignElectricalRating(NetMWe): 514(oc)-504(cc)

y. 6-Maximum Dependable Capacity (Gross MWe): 535 (7 : LMaximum Dependable Capacity (Net MWe):

504

[h.,

If changes occur in capacity ratings (Items Number 3 through7)since

. last report,;give reasons:

N/A D

l 9.'

Power 1evel to which restricted,-if any(Net MWe)

N/A 1104: Reasons for restrictions, if any:

N/A-1 L

~

This Month Yr-to-Date-Cumulative ill. ' Hours: In Reporting' Period 672.00

-1416.00 412.., Number-Of-.HourstReactor was Critical 672.00 1416.00.

122081.86-o j ' 13 7 Reactor: Reserve ~ Shutdown Hours 0.00 0.00

0. QD j

p 14.

Hours Generator;On-Line 672.00.

1416.00 119393.0]-

j

15,1 - Unit ReserveLShutdown Hours 0.00 0.00 0.00 L16.1LGross Thermal Energy > Generated (MWH)1066412.50' 2229823.00 176239379.50 117,, - Gross
  • Electrical Energy-Generated 362249.00 757460'00 58711349.00

? ;18).. Net-Electrical Energy Generated (MWH)347320.00 726566.00'._55742265.00

' $19 f UnittService Factor 100.00 100.00 78.10 4

120'.

l Unit Availability Factor 100.00 100.00-78.10 I

1 q21.. Unit Capacity Factor (Using MDC Net) 10'2.55 101.81 72.34 j

'22.

Unit" Capacity, Factor (Using DER Net) 100.55-99.83~

70.94 t

n 23c Unit Forced Outage Rate 0.00 0.00 5.66; j

E24.

Shutdowns scheduled:over next 6 months (Typei-Date, and Duration of 1

Each):

Maintenance shutdown: scheduled for mid-March to last four d

(orcfive. days.

g (25.=

Ifoshut.down at end of. report period, estimated date of startup: N/A

'26v, Units?In Test Status (prior to commercial operation): N/A j

Forecast Achieved.

i INITIAL CRITICALITY

/

' INITIAL: ELECTRICITY COMMERCIAL OPERATION

VYDPF 0411.01 DPJ0411bRev.L3

-Pag 9fi of 1 RT-No. 13.F01.19F

'-t 3

.<?'S u

k r

6

?

l@

i :..- L /.

AVERAGE DAILY-UNIT POWER LEVEL:

E DOCKET NO. 50-271-UNIT Vermont Yankee.

DATE 900310 4

. COMPLETED BY

-G.A.

Wallin

+

TELEPHONE

( 8 F' ) 2 57-7 711 j

' MONTH'

' February =

DAY" AVERAGE DAILY POWER ~ LEVEL' DAY AVERAGE' DAILY POWER LEVEL

.(MWe-Net)

(MWe-Net)

-o

1.

519-17 ~.

518 5

2.

518 18..

515 L3..

519 19.

518-

+

p

~4.

.485 20, 518 l.

5.

519 21.

518

.p, 16...

518 22, 518 Ic 7.-

519 23.

518 8.-

-519 24.

518

. 9 '. '

519 25.

515 10.s 519 26.

516 a

'11..

517:

27.

516 t

12. -

518 28, 518

[b 13'..

519

29..

i

' 14.-

519 30.

L 15, 519 31.

l-4 16.

.519 s

l --

l

{ INSTRUCTIONS:

h. ' On thisiformat, list,the average daily unit power level in MWe-Net (for.'each day in.the-' reporting month.

Compute to the nearest whole.

,cagawatt, t

.VYDPF 0411.02 J

'DP 0411 Rev. 3 0

Page'l of.1 RT Noi 13.F01.18V t

l lt r

an

=

e p(-.../. ;-R

.}g.;

g._

,y7

~t

.. ~

~

..,(

-c-

[- ~

~

~ - -

r Q:

W 3) y.

'. UNIT SEUTDOWNS AND POWER REDUCTIONS.

' [~

~3-DOCKET NO 50-271
c REPORT MONTE FEBRUARY ~

UNIT RAME Yermont Yankee-DATE 900310

, COMPLETED SY G.A.

Wallia TELEPEONE t802)257-7711 1

2.-

Metnod of..

License:

. System

. Component Cause and Correct 1ve No.

'Date'

' Type-Duration' Reason Shutting Down Event-Code" Code Action to t.

(bours).

Reactor 3 Reportl

'4 5

Prevent Recurrence-None -

.fi 1 F: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions 5: Scheduled

'A-Equipment-Failure (Explain) 1-Macual for Preparation of' Data B-Maintenance or Test

'2-Manual Scram Entry Sheets for Licensee'

~

C-Refueling 3-Automatic ~ Scram Event heport (LER) File D-Regulatory Restriction 4-Other'(Emplain) -(NUREG 0161)

E-Operator Training.and License Examination F-Administrative-5 Exhibit I - Same Source 17Y DP F 0411.03 G-Operational' Error'(Explain)

D DP.0411 Rev. 3 E-(Explain)

^

Page 1 of 1

-a L

~-

l'"

v s

a

DOCKET'NO. 50-271-t c ai ' ' ' '

UNIT VGraont YcnkGW

~

47,9 DATE 900310-

..u COMPLETED BY G.A. Wallin TELEPHONE _(802)257-7711 s

m.

- REPORT MONTH.

February j

SUMMARY

.OF OPERATINC EXPERIENCES

=>

Highlights

)

Vormont Yankee operated at 99.6% of rated thermal power for the. month.

Gross
electrical generation was 362,249 MWHe or 99.8% design electrical-

[

icOpacity.

S!

Op3 rating Summary Tha.following is a chronological description of plant-operations including

.other pertinent; items of interest for the month:

~

~At the beginning of the reporting period the plant was. operating at 99.9%

i

.of rated thermal power._

Thore were.no-reportable items of interest this month.

I i

l Atithe'end of.the reporting period the plant was operating at-99.9% of roted thermal power.