Forwards Safety Evaluation Accepting 880222 Inservice Insp Program Plan for First 10-yr Interval & Util 890511 Requests for Relief from ASME Section XI Inservice Insp Requirements. Technical Evaluation Rept Also Encl
ML20012A981
Person / Time
Site: South Texas 
Issue date: 02/22/1990
From: Dick G
Office of Nuclear Reactor Regulation
To: Hall D
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20012A982 List:
References
TAC-67424, NUDOCS 9003130152
Download: ML20012A981 (4)


Text

{{#Wiki_filter:- - - ] g. v. ( j.' February ' 22, ~ 1990 o Doc'ket No. 50 498 l Mr. Donald P. Hall'~ j Group-Vice. President,. Nuclear Houston Lighting & Power Company' 1 P. 0. Box 1700 Houstor Texas 77251

Dear Mr. Hall:

P

SUBJECT:

SAFETY EVALUATION OF THE INSERVICE INSPECTION PROGRAM PLAN FOR THE FIRST TEN YEAR INTERVAL, SOUTH TEXAS PROJECT,-UNIT:1 (TACNO.-67424) 'By letter dated February 22, 1988, HoustonLighting&~PowerCompany-(HL&P) submitted the Inservice Inspection (ISI) Program Plan for the first 10_ year-interval. In addition, on May 11, 1989,'HL&P submitted two requests for. relief from ASME Section XI ISI requirements. We have completed our review of the-ISI plan and the two relief requests, and conclude that they constitute the basis for compliance with 10 CFR 50.55a(g) and Technical Specificbtion 4.0.5_for Unit 1. Therefore the ISI plan is e acceptable.- Our Safety Evaluation is enclosed. Sincerely, /s/ George F. Dick, Jr., Project Manager Project Directorate IV Division of Reactor-Projects-

III, IV, V and Special Projects Office of Nuclear Reactor Regulation-

[

Enclosure:

As' stated cc w/ enclosure: l -See next page J NRC PDR Local PDR PD4 Readin G. Holahan F.-Hebdon P. Noonan G. Dick OGC-Rockvi le E. Jordan ACRS(10) PD4 Plant File N ~',PD4~/Pli' INIB~~~IP Q OFC

PD4/L l.....:..

J V:......

.... g..:..

]......:............:..........:........ lNAME :PNoonan-

GDick:'es
CYChehg
FH on DATE ;02/(7/90
02/pl/90
02/t*/90

,:02 h 0 p l OFFICIAL RECORD COPY l Document Name: STP IIPP / Qf0l .9003130152 900222 -{DR ADOCK 0500g 98, Y-

b.a= 1 l 7 \\ unit 3 sTATss -

[

NUCLEAR REGULATORY COMMISSION l s wwwmotow, n. c.nosos (..... February 22, 1990 Docket No. 50-498 Mr. Donald P. Hall Group Vice-President, Nuclear Houston Lighting & Power Company P. O. Box 1700 i Houston, Texas 77251

Dear Mr. Hall:

SUBJECT:

SAFETY EVALUATION OF THE INSERVICE INSPECTION PROGRAM PLAN FOR THE FIRST TEN YEAR INTERVAL, SOUTH TEXAS PROJECT, UNIT 1 l, (TACNO.67424) Py letter dated February 22,1988 HoustonLighting&PowerCompany(HL&P) submittedtheInservice. Inspection (ISI)ProgramPlanforthefirst10 year interval. In addition, on May 11, 1989 HL&P submitted two requests for relief from ASME Section.XI ISI requirer.ents. We have completed our review of the ISI plan and the two relief requests,(and conclude that they constitute the basis for compliance with 10 CFR 50.55a g) l and Technical Specification 4.0.5 for Unit 1. Therefore the ISI plan is acceptable. Our Safety Evaluation is enclosed. Sincerely, Y . Dick, Jw.], Project Manager Geo Project Directorate-IV Division of Reactor Projects - !!!, IV, V and Special Projects p L Office of Nuclear Reactor Regulation

Enclosure:

-As stated cc w/ enclosure: y See next page L lr l

~ .s. j 7 d Mr. Donald P. Hall South Texas Project Housten Lighting and Power Company ( f cc: I Brian Eerwick, Esq. Resident inspector / South Texas Assistant Attorney General Project Environmental Protection Division c/o U.S. Nuclear Regulatory Comission l P. O. Box 12548 P. O. Box 910 Caoitol Station Bay City Texas 77414 Austin, Texas 7B711 i Ms. Iris J. Jones i Mr. J. T. Westermeier Acting City Attorney General Manager, South Texas Project City of Austin i Houston Lighting and Pcuer Company P. O. Box 1088 P. O. Box 289 Austin, Texas 78767 Houston, Texas 77483 t Mr. S. L. Ro'sen Vice President, Nuclear Engineering Mr. J. C. Lanier and Constructicn ? Director of Generation Houston Lighting & Power Company City of Austin Electric Utility P. O. Box 289 721 Barton Springs Road Wadsworth, Texas 77483 Austin, Texas 78704 Mr. M. A. McBurnett Mr. R. J.-Costello

Manager, erstions Support Licensing

-Mr.-M. T. Hardt Houston L hting and Power Company City Public Service Board P. O. Box 89 P. O. Box 1771 Wadsworth, Texas 77483 San Antonio, Texas 78296 Mr. E. T. Molnar j Jack R. Newman, Esq. Mr. L. W. Hurst Newmen & Holtzinger, P. C. Bechtel Corporation 1615 L Street, NW P. O. Box 2166 Washington, D.C. 20036 Houston, Texas 77252-2166 Melbert Schwartz, Jr., Esq. Mr. R. P. Verret Baker & 30tts Mr. D. E. Ward One $ bell Plaza Central Power and Light Company Houston, Texas 77002 P. O. Box 2121 Doub, Huntzing and Glasgow Attorneys at Law INP0 Suite 400 Records Center 808 Seventeenth Street, N.W. 1100 Circle 75 Parkway Washington, D.C. 20006 Atlanta, Georgia 30339-3064 i Mr. Gerald E. Vaughn .Vice-President, Nuclear Operations l Houster Lighting & Power Company l P. O. Boc 289 l Wadsworth, Texas 77483 a - m

.8

  • [

/. Mr. Donald P. Hall SouthTexasProject Houston Lightir.g & Power Company cc* Regional Aoministrator, Region IV Bureau of Radiaticn Control U.S. Kuclear Rstulatory Commission State of Texas Office of Executive Director 1101 West 49th Street for Operations Austin, Texas 78756 611 han Plaza Drive, Suite 1000 Arlington, Texas 76011 R. W. Chewning Vice President Nuclear Assurance Joseph M. Hendrie Houston Lightino !; Power Company 50 Bellport Lane P. 0. Box 229 te11 port, New York 11713 Wadsworth Texas 77483 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Housten Lighting and Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814 Rufus S. Scott Associate General Counsel t l Houston Lighting & Power Company l P. O. Bcx 61867 L Houston, l uas 77208 i L 1 l l l. n. .-}}