ML20012A292
| ML20012A292 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/23/1990 |
| From: | Boger B Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20012A293 | List: |
| References | |
| NUDOCS 9003090174 | |
| Download: ML20012A292 (5) | |
Text
NhN a,
?
[4l,. ',
- j NUCLEAR REGULATORY COMMISSION g
UNITED STATES
- 5. '
WASHINGTON, D. C. 20656 t
l.-
g.,. s j PHILADELPHIA ELECTRIC COMPANY-L PUBLIC SERVICE ELECTRIC AND GA5 CdMPANY DELMAFVA F0WER AND LIGHT COMPANY ATLAhTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH POTTOM ATOMIC POWER STATION UNIT NO. 2 i
I.
AMENDMENT TO F1CILITY OPERATING LICENSE a~
Amendment No.152 License No. OPR-44 i
1.
The Nuclear Regulatory Comission (the Comission) has found that:
1 A.
The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated February 14, 1990 and supplemented by letter dated February 16, 1990, complies with the standards and requirements of the Atomic Eneroy Act of 1954, as arended (the Act), and the Comis-sinn's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; r
C.
There is reasonable assurance (1) that:the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted l
in ecmpliance with the Comission's regulations, 4
D.
The issuance of this amendment will not be inimical to the comon
-f defense and security or to the health or safety of the public; and j
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of-l the Comission's regulations and all applicable requirements have been satisfied.
1 2.. Accordingly, the license is amended by changes to the Technical J
Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
j l-s 90o309o174 900223 PDR ADDCK 05000277 P
PNV
II g.
(
-2 I
(2)
Technical Specifications
- The Technical Specifications contained in Appendices A and B, as revised through Amendment No.152, are hereby incorporated in the license. PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMIS$10N
/s/
Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 23, 1990 t
4\\eu*
O F3fp.sby k
LA PDI-2/PM;,0 OGJ p PDI-2/D
/ R}(W SBoger l
r en GSuh:mj GA 4V WButler df 7
p/3j/90 a /21/90 s
,13/90gpj90 2 /22/90 L_ f 0
-r.
2 i
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revited through Amendment No.152, are hereby incorporated in the license.
PECO shall-operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II Office of Nuclear Reactor. Regulation 1
Attachment:
Changes'to the Technical Specifications Date of Issuance: February 23, 1990
~!
l,g i
j ATTACHMENT TO LICENSE AMENDMENT NO. 152 e..-
4 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET N0; 50-277
.c
_l l
Replace the following page~ of'the Appendix-A Tech'nical Specifications with.~
.i the enclosed page.. The revised areas are indicated by marginal lines.
Remove Insert 131 131 i
..\\.'
- l f
r
- I i'
?
4 t
2
~ - - - -
=
,q UNIT 2
PBAPS 3
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENT 3.5.E Automatic Depressurization 4.5.E Automatic Depressurization System (ADS)
Ty tem ( ADS t
1.
The Automatic Depressuriza-1.
During each operating cycle tion Subsystem shall be oper-the following tests shall able whenever there is irra-be performed on the ADS:
diated fuel in the reactor vessel and the reactor pres-A simulated automatic actu-sure is greater than 105 psig ation test shall be per-4 and prior to e startup from a formed prior to startup af-l' Cold Condition, except as ter each refueling outage.
specified in 3.5.E.2 below.
2 2
2.
From and after the date that 2.
When it is determined that one valve in the automatic one valve of the ADS is in-depressurization subsystem is operable, the ADS subsystem made or found to be inoper-actuation logic for the able for any reason, conti-other ADS valves and the nued reactor operation is HPCI subsystem shall be permissible only during the demonstrated to be operable l
succeeding seven days
- unless immediately and at least such valve is sooner made weekly thereafter.
operable, provided that during such seven days the HPCI subsystem is operable.
3.
If the requirements of 3.5.E 2
cannot be met, an orderly shutdown shall be initiated and the reactor pressure shall
=
be reduced to at least 105 psig within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- This seven-day LC0 has a one-time extension to 11:59 p.m. on March 3, 1990 provided RCIC is operable.
Amendment No.M,152 131
.