ML20012A124

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Containment Penetration Conductor Overcurrent Protective Devices
ML20012A124
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/02/1990
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20012A123 List:
References
NUDOCS 9003080321
Download: ML20012A124 (3)


Text

2--

S-e..

. .):_-;

w . ..

a t

, .c g; t.

q.

e

.h ATTACIBIENT III

( '

PROPOSED TECENICAL SPECIFICATICII (21450E8 1,

11 1

f-- j l

< r b

i l

i

.}

i 9003080321 90030' ' i PDR ADOCK 05000482 P. FDC

~

4 .

' Attachment III_ to ET 90-0043

",- Page 1 of 2

f(?.=

, y LIMITING CONDITIONS'FOR OPERATION AND SURVEILLANCE REQUIREMENTS-SECTION-PAGE PLANT SYSTEMS (Continued) 3/4.7.10 DELETED TABLE 3.7-3 DELETED 3/4.7.11 DELETED 3/4.7.12- AREA TEMPERATURE MONITORING.............................. 3/4 7-27 TABLE 3.7-4 AREA TEMPERATURE MONITORING........................... 3/4 7-28 3/4.8 ELECTRICAL POWER SYSTEMS

. 3/4'8.1

. A.C. SOURCES Operating................................................ 3/4 8-1 TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE........................ 3/4 8-7 Shutdown................................................. 3/4 8-8 3/4.8.2 0.C. SOURCES

- 0 pe ra t i ng . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-9 TABLE 4.8-2' BATTERY SURVEILLANCE REQUIREMENTS..................... 3/4 8-11 ,

j .

Shutdown................................................. 3/4 8-12 3/4.8.3 ONSITE POWER DISTRIBUTION Operating................................................ 3/4 8-13 Shutdown................................................. 3/4 8-15 3/4.8.4" ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Containment Penetration Conductor Overcurrent

_1 Protecti_ve Devices._.................................... 3/4 8-16

--. m . =
- =. a.a ;.;.:.: ....=,--_.; - - - - -

m- _, _

. .', C _ _ . "Il, , '"!,,I C. .I '. ". ". *%."".

. . , . . ". .'1'.f.". . . . . . . . . . . . . . . . . . . . .,u,. _.o' .- .

= - - - .

-t

.( WOLF CREEK - UNIT 1 XI Amendment No.15 l

l

y .

~ _

'4 ,, '

q - * ',

- f nAttachment ill to ET 90-0043

  • a, Page 2;of 2 : '

' ELECTRICAL POWER-SYSTEMS

'3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES k C

CONTAIW4ENT PENETRATION CON 00CTOR OVERCURRENT PROTECTIVE DEVICES 4

i; LIMITING' CONDITION FOR OPERATION 3.8.4.1. For each containment -

overcurrent protective device (penetration provided s), each device with a penetration conductor shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4. l ACTION:

With one or more of the above required containment penetration conductor e overcurrent' protective device (s) inoperable: 4 s

a.- Restore the protective device (s) to OPERABLE status or deenergize the circuit (s) by tripping the associated backup circuit breaker or racking out or removing the inoperable circuit breaker within l 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, declare the affected system or component inoperable, _

i L,

_ and verify the backup circuit breaker to be tripped or the inoperable '

circuit breaker racked out, or removed, at least once per 7 days thereafter; the provisions of Specification 3.0.4 are not applicable- ,

to overcurrent devices in circuits which have their backup circuit o breakers tripped, their inoperable circuit breakers racked out, or i L removed, or *

\w I b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30. hours.

a SURVEILLANCE REQUIREMENTS e .

4.8.4.1 Protective devices required to be OPERABLE as containment penetration conductor overcurrent protective devices shall be de.nonstrated OPERABLE. l t

1

a. - At least once per 18 months: ,
1) By verifying that the 13.8 kV circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10% of the circuit breakers, and performing the following:

a) A CHANNEL CALIBRATION of the associated protective relays, b) An integrated system functional test which includes simulated automatic actuation of the system and verifying that each-ircuits relay functionand associated as designed {chd Mcircui_t pppci'le'd breakers ih Tg y.0- _ and control c WOLF CREEK - UNIT 1 3/4 8-16 Amendment No. 28