ML20011F737
| ML20011F737 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 02/26/1990 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20011F738 | List: |
| References | |
| NUDOCS 9003070344 | |
| Download: ML20011F737 (2) | |
See also: IR 05000352/1990005
Text
W
,-
Y
=l
'
_ _ _ _ _ -
t simt c -idst
f[.E D-
M
gQ
W
i
,
+
mm
.
{,
..
FEB 2 01990
~'
1
-
.
..
.
i
' Docket Nos. 50-352-
j
50-353
'
Philadelphia Electric Company
ATTN: . Mr. C. . A. McNeill, Jr.
j
-
Executive Vice President
!
Nuclear-
Correspondence Control' Desk'
P.O. Box 195
.
Wayne, PA 19087-0195
E
Gentlemen:
,
Subject: . Inspection Nos. 50-352/90-05 and 50-353/90-04
This refers to the routine safeguards inspection conducted by Messrs.
-G. C.. Smith and_T. W. Dexter of this office on January 29 - February 2, 1990 of
activities authorized by NRC License Nos. NPF-39 and NPF-85 at the Limerick .
Generating Station Units 1-and'2 and to the discussions of our-findings held by.
Mr. Smith with Mr. G. M. leitch of your staff at the conclusion of the
inspection.
.. Areas examined during this inspection are described in the NRC Region I_
,
. Inspection Report which .is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and
. representative-records,-interviews with personnel, and observations by the
!
' inspectors.
Within the' scope of this inspection, no violations were observed; however,
>
several-potential weaknesses were identified that should receive' attention to
-
,
maintain-the effectiveness of your security program. These are identified and
L
- discussed in the enclosed inspection report.
t
Sections of the enclosed report contain details of your program that have been-
- determined to be exempt'from public disclosure in accordance with 10 CFR 73.21
-(Safeguards Information). Therefore, the sectionsiso identified will-not be
,
j
placed in the NRC Public Document Room and will receive limited-distribution.
L
This letter and the remainder of the inspection report will be placed in the:
-
Public Document Room,' in accordance with 10 CFR 2.790(a).
)
'
L
..
0FFICIAL RECORD COPY
SG CIR PECO 90-05/04 - 0001.0.0
f.9}
02/23/90
9003070344 900226
,{DR .ADOCK0500g52 g
<
~
.
_
_
-
.
-
-
.
.
.
't
.~
.
' ' '
"
FEB2e1999
.
Philade_1phia' Electric Company
2
.
L
Your cooperation.with us is-appreciated.
Sincerely,
e
eigd O'pd Cy:
'
bW ii. LZcary
,
'
Ronald R. Bellamy, Chief .
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
f
Enclosure: Combined NRC Region I Inspection Report Number 50-352/90-05 and
50-353/90-04 (Safeguards Information (SGI) is contained
in paragraphs 3 and 7.)
'
-cc w/ encl-(w/o'SGI):
-
R. J. Lees, Chairman, Nuclear Review Board
G. M. Leitch, Vice President - Limerick Generating Station
S. J. Kowalski, Vice President - Nuclear Services
D. R. Helwig, General Manager - Nuclear Services
J. W- Durham, Sr., Vice President and General Council
J. Doering, Project Manager - Limerick Generating Station
-
M. J. McCormick, Jr., Manager - Limerick Generating Station
- J. F. O'Rourke, Manager - Limerick Quality Division
G. J. Madsen, Regulatory Engineer - Limerick Generating Station
G. A. Hunger.cJr. ,' Director - Licensing Section
'3
T. B. Conner, Jr. , Esquire
Public. Document Room.(PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
Commonwealth of Pennsylvania.
.
bec w/enci (w/o SGI):
-
' ' ,
-
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP-
k.
g
RI:DRS
RI:DR
RI:
RI:DRSS
..
. Smith /
Dexter
Kei
Bellamy
.
02/#/90
02//4 /90
02/26/90
02/@/90
0FFICIAL RECORD COPY
SG CIR PECO 90-05/04 - 0002.0.0
02/23/90
,
x
-