ML20011F445

From kanterella
Jump to navigation Jump to search
Forwards Operability Evaluation Re Salt Svc Water Pumps P208 B,C,D & E,Per 900117 Telcon.Evaluation Concluded That Salt Svc Water Pumps P208 B,C,D & E Operable & Tech Spec 3.5.B.1 Requirements Met
Date released: 01/25/2020 Download: ML20011F445


Operability Evaluation of Salt Svc Water Pump Columns.
ML20011F472
Person / Time
Site: Pilgrim
Issue date: 01/19/1990
From:
BOSTON EDISON CO.
To:
References
Download: ML20011F472 (51)
Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop.
ML20011F447
Person / Time
Site: Pilgrim
Issue date: 01/19/1990
From: Gallagher W, Howard R
CYGNA ENERGY SERVICES
To:
References
Download: ML20011F447 (25)
Forwards Operability Evaluation Re Salt Svc Water Pumps P208 B,C,D & E,Per 900117 Telcon.Evaluation Concluded That Salt Svc Water Pumps P208 B,C,D & E Operable & Tech Spec 3.5.B.1 Requirements Met
ML20011F444
Person / Time
Site: Pilgrim
Issue date: 01/19/1990
From: Bird R
BOSTON EDISON CO.
To: RUSSELL W T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20011F444 (38)